Template:Nuke Plant Table

From Wikipedia, the free encyclopedia

{{Nuke-NRC{{{Region}}}}}

{{{Name}}}
Status
Utility {{{Utility}}}
Location {{{Location}}}
Reactor supplier {{{Supplier}}}
Reactor type {{{Type}}}
Steam generators {{{Generators}}}
Capacity {{{Capacity}}} megawatts
Architect {{{Architect}}}
Cost {{{Cost}}}
Construction {{{Construction}}}
Built {{{Built}}}
Closed {{{Closed}}}
Commercial operation {{{Start}}}
License expiration {{{Expires}}}


This is usually included at the beginning of an article about a U.S. Nuclear Power Plant. Answer the questions to fill in how to use this template.

Usage:

{{Nuke Plant Table
|Name=What is the name of this plant?
|Utility=Who owns this plant?
|Status=What state is the plant? {This should be D, M or O for Decomissioned, Mothballed, or Operating.)
|Location=Where is it?
|Supplier=Who built it?
|Type=What type of Reactor? (This is either Boiling water reactor or Pressurized water reactor)
|Generators=Who built the generators?
|Capacity=What is the capacity in megawatts?
|Architect=Who Designed it?
|Construction=Who Built it?
|Cost=How much?
|Built=When did construction begin?
|Start=When did it begin operating?
|Expires=When does the NRC license expire?
|Region=What number NRC region is it located in?
}}

Example:

{{Nuke Plant Table|Name=South Texas
|Status=O
|Utility=Texas Genco LLC 44%&ltbr>City of San Antonio 40%&ltbr>City of Austin 16%
|Location=Near Bay City, Texas
|Supplier=Westinghouse
|Type=Pressurized water reactor
|Generators=Westinghouse
|Capacity=2,500
|Architect=Start: Brown & Root
Finish: Bechtel Corp.
|Construction=Start: Brown & Root
Finish: Ebasco Constructors, Inc.
|Cost=$5,500,000,000
|Built=1976
|Start=Unit 1: August 25, 1988<br>Unit 2: June 19, 1989
|Expires=August 20, 2027
|Region=4
}}