Nagarjuna Sagar Dam is a masonry dam built across Krishna River in Nagarjuna Sagar, Andhra Pradesh, India. It is the world's tallest masonry dam, at a height of 124 metres, and creates a reservoir holding up to 11, 472 million cubic metres.[1]
It is one of the earliest irrigation and hydro-electric projects in India. The dam provides irrigation water to the Nalgonda District, Prakasam District, Khammam District, and Guntur District.
Contents |
[edit] History
The Krishna River is a river of India that originates at Mahabaleswar in Maharashtra, passes through Sangli and meets the sea in the Bay of Bengal at Hamsaladeevi in Andhra Pradesh. The state of Andhra Pradesh was unable to effectively use the river until the mid 20th century, due to the absence of a reservoir which could store the water. River floods devastated the villages in the Krishna district while Nalgonda district and Guntur were unable to use the excess water.[2][3]
The proposal to construct a dam to use the excess waters of the river was put forward by the British rulers in 1903. Siddeswaram and Pulichintala were identified as the suitable locations for the reservoirs. However, none of these proposals materialized. The perseverance and single minded determination of the Raja of Muktyala paved way for the construction of the dam.[4][5]
Based on the reports submitted by the Khosla committee in 1952, the congress government formed under the leadership of Jawaharlal Nehru decided to construct reservoirs in drought hit areas under the first five year plan. The state governments were asked to submit a report on the possible locations for such project. After the formation of the Andhra Pradhesh state in 1953 and the submission of a report by the government, the foundation stone for the Nagarjuna Sagar dam was laid on 10 December 1955. It was named after the buddhist monk Nagarjuna.[6][7]
[edit] Project construction
The dam water was released by the then Prime Minister's daughter, Indira Gandhi in 1967.[8] The consruction of the dam submerged an ancient Buddhist settlement, Nagarjunakonda, which was the capital of the Ikshvaku dynasty in the 1st and 2nd centuries, the successors of the Satavahanas in the Eastern Deccan. Excavations here had yielded 30 Buddhist monasteries, as well as art works and inscriptions of great historical importance. In advance of the reservoir's flooding, monuments were dug up and relocated. Some were moved to Nagarjuna's Hill, now an island in the middle of the reservoir. Others were moved to the mainland.[9]
The project started in February 1956 but due to scarcity of funds modern equipment was not available. The project was constructed with stone instead of concrete. A cement factory was constructed near Macherla to meet the project requirement. A railway line was laid connecting the project location and the cement factory. Stones were supplied from the nearby Sunkesula quaries. Sand was supplied from Rayavaram stream and Halia river. The construction of the dam was completed by 1969. The dam came under full usage from 1972 after fitting the crest gates. Two canals - the left and right canals were constructed to supply water from this reservoir. Total expenditure on the project (including maintenance till 2005) is around 1300 crore rupees. The number of workers participating in the project varied from 45,000 to 70,000. Around 174 people died due to accidents during the construction.
[edit] Effect of the project
The project benefited farmers in the districts of Guntur, Prakasam, Krishna, Nalgonda and Khammam. The right canal (a.k.a Jawahar canal) is 203 km long and irrigates 1.113 million acres (4,500 km²) of land. The left canal (a.k.a Lalbahadur Shastri canal) is 295 km long and irrigates 1.03 million acres (4,200 km²) of land. The project transformed the economy of above districts. 52 villages were submersed in water and 24000 people were affected. The relocation of the people was completed by 1967.[10]
[edit] Power Generation
The hydro electric plant has a power generation capacity of 815.6 MW with 8 units(1x110 MW+7x100.8 MW). First unit was commissioned on 7th March 1978 and 8th unit on 24th December, 1985. The right canal plant has a power generation capacity of 90 MW with 3 units of 30 MW each. The left canal plant has a power generation capacity of 60 MW with 2 units of 30 MW each.[11]
[edit] How to reach Nagarjuna Sagar
This article or section contains instructions, advice, or how-to content. The purpose of Wikipedia is to present facts, not to teach subject matter. Please help improve this article by removing or rewriting the how-to content, which may qualify for a move to http://www.wikihow.com/ or http://howto.wikia.com/. |
By Air: Hyderabad is the nearest airport to Nagarjuna Sagar. Nagarjuna Sagar is located 150 km from Hyderabad. There are regular buses from Hyderbad and Guntur to Nagarjuna Sagar. The nearest railway station, Macherla, is 24 km from Nagarjuna Sagar.
Nagarjuna Sagar is 160 km from Hyderabad and can be covered in one day. They can either catch a tourist bus or drive in their own Four Wheelers. Tourists should note that it is advisable to carry your food items and drinking water. Tourists may follow these directions if you are already in Hyderabad or Secunderabad.
The directions given below are after reaching L.B. Nagar.
Route A: If you are traveling from Dilshuknagar to L.B.Nagar take a right towards Mallepally. If you are traveling from Uppal to L.B.Nagar drive straight ahead towards Mallepally. If you are traveling from Ramoji Film City towards to L.B.Nagar take a left and drive for 300mts to reach Sagar Ring Road (Biramalguda)
Route B: After reaching Sagar Ring Road drive left which is Nagarjuna Sagar road (Devarakonda road), where you should be seeing a signboard -Nagarjuna Sagar 140 km. This route should ta, but may not be so through out the year. So I suggest to drive carefully. This place is a Emerging smalltown and tourists may stop to have a beverage break or to buy some munchies if desired.
Route D: Travel around 50 km more to reach Nagarjuna Sagar. Tourists may note that they are not allowed close to the Dam since August 15, 2006. However, tourists may travel towards the Shiva Temple close to Krishna river. You may also travel towards Nagarjuna Konda which has museum worth watching.
More Info: Akkampally Resorviour is 15km from Mallepally, which is supplies drinking water to Hyderabad, Mallepally to peddvoora 25km strech is famous for cheeni farms, From Peddavoora onwards the great Nagarjunasagar resorvoir flavours starts.
To Visit Extra for Ethipotala: Those who are interested may also drive to Ethipothala falls which is 15 km from Nagarjuna Sagar. Tourists may either pay a small fee of Rs.15 and view the falls or trek down towards the falls which is absolutely free of cost.
[edit] Statistics[12]
- Catchment Area : 215000 sq km (83012 sq mi)
- Masonry dam
- Spillway of dam : 471 m
- Non-over flow dam : 979 m
- Length of Masonry dam : 1450 m
- Maximum height : 125 m
- Earth dam
- Total Length of Earth dam : 3414 m
- Maximum height : 26 m
[edit] See also
[edit] References
- ^ Nagarjunasagar. Retrieved on 2007-01-25.
- ^ The Hindu : Magazine / Focus : Taming the Krishna
- ^ Welcome to APGENCO
- ^ The Hindu : Magazine / Focus : Taming the Krishna
- ^ Welcome to APGENCO
- ^ The Hindu : Magazine / Focus : Taming the Krishna
- ^ Welcome to APGENCO
- ^ Taming the Krishna. Retrieved on 2007-01-24.
- ^ Nagarjunakonda. Retrieved on 2007-01-25.
- ^ Welcome to APGENCO
- ^ Andhra Pradesh Hydel Power plants
- ^ Brief Profile of Nagarjuna Sagar Dam
[edit] External links