List of town tramway systems in Germany

From Wikipedia, the free encyclopedia

This is a list of town tramway systems in Germany by Land. It includes all tram systems, past and present.

Contents

[edit] Baden-Württemberg

Name of System Location Traction
Type
Date (From) Date (To) Notes
  Baden-Baden Electric 24 Jan 1910 28 Feb 1951  
  Esslingen am Neckar Electric 24 May 1912 7 Jul 1944  
  ♦ Esslingen - Nellingen - Denkendorf Electric 19 Dec 1926 28 Feb 1978  
  Freiburg im Breisgau Electric 14 Oct 1901    
  Heidelberg Horse 13 May 1885 7 Oct 1902  
Electric 17 Mar 1903   see also Mannheim.
  ♦ Heidelberg - Schwetzingen     4 Jan 1974  
  ♦ Schwetzingen - Ketsch Electric 12 Dec 1910 31 Mar 1938.  
  Walldorf (in Baden) Horse 22 Feb 1902 21 Feb 1907  
Electric 22 Feb 1907 1 Aug 1954 Separate undertaking to 3 Sep 1945.
  Wiesloch Horse 1 Sep 1886 4 July 1901  
  ♦ Heidelberg - Wiesloch Electric 24 Jul 1901 16 Jun 1973  
  Heilbronn (am Neckar) Electric 29 May 1897

21 Jul 2001

1 April 1955

-

New segment opened 2001 worked as par of Karlsruhe regional system.;
  Karlsruhe Horse 21 Jan 1877 19 Mar 1900  
Steam 16 Jul 1881 19 Mar 1900  
Accumulator (storage battery) 10 Feb 1900 1903  
Electric 10 Feb 1900    
Albtalbahn   Steam 1 Dec 1897 1911  
Electric 1 Dec 1898    
  ♦ Karlsruhe - Ettlingen   1 Dec 1897    
  ♦ Ettlingen - Bad Herrenalb   2 Jul 1898   Opened in stages, completed 2 July 1898.
  ♦ Branch Busenbach - Ittersbach   10 Apr 1899    
  Lörrach Electric 16 Nov 1919 31 Aug 1967 Worked by tramcars hired from Basel, CH, tramway undertaking (q.v.). Operation suspended 1 Sep 1939 - 11 May 1947 because of closure of border.
  Mannheim Horse 2 Jun 1878 22 May 1902  
Steam 6 May 1884 23 Mar 1914  
Electric 10 Dec 1900   Operated jointly with Ludwigshafen system (q.v.). See also Heidelberg.
OEG Mannheim - Heidelberg Steam 12 Dec 1887 31 Aug 1956  
Electric 10 Dec 1900    
OEG Mannheim - Heidelberg       Opened 1892. Electrified 1928 - 1929.
OEG Mannheim - Weinheim       Opened 1887. Electrified 1915.
OEG Heidelberg - Weinheim       Opened 1890. Electrified 1949 - 1956.
  Müllheim Steam 15 Feb 1896 1913  
Electric 7 Apr 1914 22 May 1955  
  ♦ Müllheim - Badenweiler     22 May 1955  
  Pforzheim Electric 1 Dec 1911 10 Oct 1964  
  Ravensburg - Weingarten - Baienfurt Steam 6 Jan 1888 12 Sep 1911  
Electric 1 Sep 1910 1 Jul 1959  
  Reutlingen Steam 1 Nov 1899 24 Jul 1912  
Electric 24 Jul 1912 19 Oct 1974  
  Stuttgart Horse 28 Jul 1868 28 Nov 1896  
Electric 26 Sep 1895   First tunnel segment opened 1966. First standard-gauge Stadtbahn line opened 28 Sep 1985.
  Bad Cannstatt Electric 20 Jul 1899   Separate undertaking to 1 Jan 1919.
  Feuerbach Electric 30 Dec 1926   Separate undertaking to 1 Jan 1934.
  Rack tramway Steam 23 Aug 1884 1907  
Electric 1 May 1904    
  Ulm (an der Donau) Electric 15 May 1897    

[edit] Bayern (Bavaria)

Name of System Location Traction
Type
Date (From) Date (To) Notes
  Augsburg Horse 8 May 1881 31 Aug 1898  
Steam 12 Sep 1886 15 Jun 1887  
Electric 1 Sep 1898    
  Bamberg Electric 1 Nov 1897 10 Jun 1922  
  Hof (an der Saale) Electric 5 Aug 1901 14 Nov 1922  
  Ingolstadt (an der Donau) Horse 10 Nov 1878 3 Mar 1921  
(Electric)     Construction started, not completed (ca. 1914).
  Landshut (in Bayern) Horse 1 July 1902 1913  
Electric 15 Jan 1913 18 Mar 1945 Closed because of war damage.
  München /Munich Horse 21 Oct 1876 1 Nov 1900  
Steam 9 Jun 1883 15 Jul 1900  
Accumulator (storage battery) 1 Jul 1886 17 Jul 1895  
Electric 23 Jun 1895    
  Nürnberg /Nuremberg Horse 25 Aug 1881 20 Jul 1898  
Electric 7 May 1896    
  ♦ Nürnberg - Fürth Steam 7 Dec 1835 31 Oct 1922 Bayerische Ludwigsbahn, Nürnberg - Fürth, first railway in Germany.
Electric  ? 21 Jun 1981 Express tramway, built on alignment of closed railway (Ludwigsbahn). Closed, together with remaining tramway lines in Fürth, because of U-Bahn (metro) construction.
  Regensburg Electric 21 Apr 1903 1 Aug 1964  
  Schweinfurt Horse 5 May 1895 31 Jan 1921  
  Würzburg Horse 8 Apr 1892 4 Oct 1900  
Electric 30 Jun 1900

18 Sep 1924

20 Apr 1920

-

Reopened by a new undertaking.

[edit] Berlin and Brandenburg

Name of System Location Traction
Type
Date (From) Date (To) Notes
  Berlin Horse 22 Jun 1865 8 Dec 1907  
Steam 5 May 1886 1919  
Accumulator (storage battery) 8 Feb 1895 1902  
Electric 16 May 1881    
  Buchholz Horse 9 Jul 1904 8 Dec 1907  
Electric 8 Dec 1907   Separate undertaking to 22 Jul 1907.
  ♦ Heiligensee an der Havel Electric 29 May 1913 1 Jun 1958 Separate undertaking to 3 Dec 1920.
  Köpenick (Cöpenick) Horse 18 Oct 1882 11 Aug 1903  
Electric 11 Aug 1903   Separate undertaking to 1 Oct 1920.
  Spandau Horse 5 Jun 1892 17 Mar 1896  
Electric 18 Mar 1896 2 Oct 1967 Separate undertaking to 1 Aug 1920.
  ♦♦ Spandau - Nonnendamm Electric 30 Sep 1908 2 Oct 1967  
  ♦♦ Spandau West - Henningsdorf Petrol (gasoline) 1 Aug 1923 11 Nov 1929  
Electric 11 Nov 1929 Apr 1945  
Grunewaldbahn Steglitz Electric 3 Dec 1905 2 May 1963  
  Teltow       Separate undertaking to 16 Apr 1921.
  ♦♦ Berlin-Lichterfelde - Steglitz - Südende-Mariendorf line Electric 16 May 1881 14 Feb 1930 Incorporated segment of line opened 1881 by Siemens und Halske, world's first electric tramway.
  ♦♦ Berlin-Lichterfelde - Teltow - Stahnsdorf - Klein Machnow (Schleuse) Steam 1 Jul 1888 30 Mar 1907  
Electric 30 Mar 1907 2 May 1966  
  ♦♦ Potsdam Horse 11 May 1880 1 Sep 1907  
Electric 2 Sep 1907    
  ♦♦ Schöneiche (bei Berlin) Petrol (gasoline) 28 Aug 1910 30 May 1914  
Electric 30 May 1914    
  ♦♦ Strausberg Steam 17 Aug 1893 15 Mar 1921  
Electric 18 Mar 1921    
  ♦♦ Woltersdorf (bei Berlin) Electric 17 May 1913    


Name of System Location Traction
Type
Date (From) Date (To) Notes
  Brandenburg (an der Havel) Horse 1 Oct 1897 20 Apr 1911  
Electric 1 Apr 1911    
  ♦ Plaue (an der Havel) Electric 24 Dec 1912 28 Sep 2002 Separate undertaking to 1 Oct 1952.
  Cottbus (Chóśebuz) Electric 8 Jul 1903    
  Eberswalde Electric 1 Sep 1910 3 Nov 1940  
  Frankfurt an der Oder Electric 23 Jan 1898   see also Słubice, Poland.
  Guben Electric 24 Feb 1904 8 Jun 1938 see also Gubin, Poland.
  Jüterbog Horse 21 Mar 1897 29 Jul 1928  
  Küstrin Electric 16 May 1927 30 Jan 1945 see also Kostrzyn nad Odrą, Poland.
  Werder (an der Havel) Horse 27 Jul 1895 7 Aug 1926  


Note for Berlin: Tramway divided into East Berlin and West Berlin systems from 16 Jan 1953. West Berlin tramway lines replaced by motorbus from 1954, final closure on 2 Oct 1967. (See Berlin Straßenbahn; link to English-language page.)

[edit] Bremen

Name of System Location Traction
Type
Date (From) Date (To) Notes
  Bremen Horse 4 Jun 1876 31 Oct 1911  
Electric 22 Jun 1890    
  Bremerhaven Horse 26 Jun 1881 28 Aug 1908  
Accumulator (storage battery) 21 Aug 1898 31 Jul 1908  
Electric 4 Jun 1908 30 Jul 1982  

[edit] Hamburg

Name of System Location Traction
Type
Date (From) Date (To) Notes
  Hamburg Horse 16 Aug 1866 18 Dec 1922  
Steam 13 May 1878 22 Jun 1897  
Electric 5 Mar 1894 1 Oct 1978  
  Harburg Electric 30 Sep 1899 24 Sep 1975  
  ♦ Alt-Rahlstedt - Volksdorf Electric 30 Oct 1906 15 Apr 1923 Town tramway service on local railway (kleinbahn).
  Altona - Blankenese Electric 26 Aug 1899 9 Nov 1921  

[edit] Hessen

Name of System Location Traction
Type
Date (From) Date (To) Notes
  Bad Homburg (vor der Höhe) Electric 26 Jul 1899 31 Jul 1935 Served by line of Frankfurt am Main system to 1971 (this line was upgraded to the Frankfurt U-Bahn line that serves Bad Homburg).
  Darmstadt Horse 25 Aug 1886 31 Mar 1922  
Electric 24 Nov 1897    
  Eltville - Schlangenbad Steam 20 Jun 1895 17 Mar 1933  
  Frankfurt am Main Horse 19 May 1872 17 Jun 1904  
Steam 1 Sep 1888 13 Jul 1929  
Accumulator (storage battery) 1 Jan 1897 9 Sep 1900  
Electric 18 Feb 1884    
  Offenbach am Main Horse 10 Apr 1884 28 Oct 1906  
Electric 27 Oct 1906 3 Nov 1963. Worked by Frankfurt tramway system, 31 Mar 1907 - 3 Nov 1963. Offenbach am Main served by line of Frankfurt am Main tramway system to 1 Jun 1996.
  Gießen Electric 20 Nov 1909 31 Mar 1953  
  Hanau Electric 15 Jun 1908 18 Mar 1945 Closed because of wa damage.
  Kassel Steam 9 Jul 1877 10 May 1899  
Horse 27 Apr 1884 28 Feb 1899  
Electric 14 Dec 1898    
  Kassel - Wolfsanger Horse 24 Sep 1897 20 Oct 1911  
Electric 20 Oct 1911    
Herkulesbahn ♦ Kassel - Palmenbad, Brasselsberg, Herkules, Hohes Gras Electric 27 Apr 1903 12 Apr 1966  
  Marburg (an der Lahn) Horse 1 Oct 1903 10 Oct 1911  
Electric 28 Nov 1911 17 May 1951  
  Wiesbaden Horse 16 Aug 1875 14 Aug 1900  
Steam 18 May 1889 27 Aug 1900  
Electric 16 May 1896 30 Apr 1955 See also Mainz (Rheinland-Pfalz).

[edit] Mecklenburg-Vorpommern (Mecklenburg-Western Pomerania)

Name of System Location Traction
Type
Date (From) Date (To) Notes
  Rostock Electric 16 Oct 1888  
  Schwerin Electric 1 Dec 1908  
  Stralsund Electric 25 Mar 1900 7 Apr 1966  
  Warnemünde Electric 1 Jul 1910 30 Apr 1945 Closed because of war damage.

[edit] Niedersachsen (Lower Saxony)

Name of System Location Traction
Type
Date (From) Date (To) Notes
  Bad Pyrmont Horse 1 Jun 1879 12 Mar 1925  
  Bückeburg - Bad Eilsen Electric 1918 21 May 1966  
  Braunschweig Horse 11 Oct 1879 24 Sep 1904  
Electric 28 Oct 1897    
  Celle Electric 1 Nov 1907 2 Jun 1956  
  Cuxhaven Petrol-electric (Benzolelektrisch) 6 Jul 1914 2 Aug 1914  
  Emden Electric 23 Feb 1902 30 Apr 1953  
  Göttingen (Electric)     Construction started, not completed (ca. 1914).  
  Hannover Horse 16 Sep 1872 1897  
Accumulator (storage battery) 10 Sep 1895 20 Nov 1903  
Electric 19 May 1893    
  ♦ Hannover - Hildesheim Electric 22 Mar 1899 16 Aug 1959  
  Hildesheim Electric 7 Aug 1905 22 Mar 1945 Closed because of war damage.
  Osnabrück Electric 31 Jan 1906 29 May 1960  
  Wilhelmshaven Electric 17 Mar 1913 30 Mar 1945 Closed because of war damage.

[edit] Nordrhein-Westfalen (North Rhine-Westphalia)

Name of System Location Traction
Type
Date (From) Date (To) Notes
  Aachen Horse 26 Dec 1880 10 Sep 1897  
Caustic soda (Natronsmotor) Jun 1884 Mar 1885  
Electric 15 Jul 1895 29 Sep 1974  
  Eschweiler Electric 1897 6 Oct 1969  
  Stolberg Electric 1898 8 Jan 1967  
  Bad Salzuflen Horse 1 Jul 1909 1924  
  ♦ Bad Salzuflen - Schötmar Horse 15 Jun 1912 1915  
  Bielefeld Electric 20 Dec 1900    
  Düren Steam 1 Apr 1893 1913  
Electric 20 Nov 1913 30 Jun 1965  
Dürener Kreisbahn ♦ Düren - Nörvenich - Besenich Electric 6 Oct 1908 30 Apr 1963 Nörvenich - Besenich closed 31 Jan 1960. Düren - Nörvenich closed 30 April 1963.
  Gummersbach Electric 1 Oct 1915 4 Oct 1953  
  Herford Steam 10 Aug 1900 10 May 1932  
Electric 26 Jun 1930 22 Apr 1966  
  Kleve Electric 1 Oct 1911 31 Mar 1962  
  Minden (in Westfalen) Steam 7 Sep 1893 7 Dec 1920  
Electric 9 Dec 1920 29 Dec 1959  
  Münster (in Westfalen) Electric 14 Jul 1901 25 Nov 1954  
  Paderborn Electric 11 Nov 1900 27 Sep 1963  
  Detmold Electric 1 Mar 1900 15 Aug 1954 Separate undertaking to 1920.
  Plettenberg Steam 25 May 1896 1 Jan 1959  
  Rees - Empel Steam 5 Sep 1897 1914  
Electric 28 Feb 1915 30 Apr 1966  
  Wesel - Rees - Emmerich (am Rhein) Electric 25 May 1914 30 Apr 1966  
  Siegen Electric 14 Nov 1904 31 Aug 1958  
  ♦ Siegen - Kreuztal Electric 14 Nov 1904 29 May 1952  

[edit] Rhein-Ruhr

Ruhrgebiet (Ruhr Area) towns in geographic order, west to east:

Name of System Location Traction
Type
Date (From) Date (To) Notes
  Moers Electric 1 Oct 1908 25 Sep 1954  
  Homberg Electric 1 Apr 1909 25 Sep 1954 Separate undertaking to 1 January 1925.
Homberg lines extended to: ♦♦ Ruhrort   1913 Mar 1945  
Homberg also served by: ♦♦ Düsseldorf (Rheinbahn) system   1911 20 Oct 1958  
  ♦♦ Krefeld system   1918 2 Nov 1962  
           
  ♦ Moers - Kamp - Rheinberg Electric 12 Feb 1915 11 Oct 1952  
           
  Duisburg Horse 24 Dec 1881 31 Jul 1898  
Steam 22 Jul 1882 25 Dec 1897  
Electric 3 Aug 1897   First Stadtbahn tunnel segment opened 11 Jul 1992.
Duisburg lines extend to: Ruhrort   24 Dec 1881    
  Hamborn   24 Feb 1898    
  Dinslaken   1 May 1900    
  Mülheim an der Ruhr   1912    
           
  Oberhausen (im Rheinland) Electric 4 Apr 1897

1 Jun 1996

13 Oct 1968

-

-

Connects with Mülheim an der Ruhr system.

Oberhausen lines connected with: ♦ Essen system       Now closed.
  ♦ Mülheim an der Ruhr system       Closed, now reopened.
  ♦ Recklinghausen system       Now closed.
  ♦ Duisburg system       No track connection at Duisburg-Holten because of gauge difference. Now closed.
Oberhausen also served by: ♦ Mülheim an der Ruhr system     4 Apr 1971  
           
  Mülheim an der Ruhr Electric 8 Jul 1897   First Stadtbahn tunnel opened 3 Nov 1979 (served by Essen system). First tunnel segment for Mülheim system opened 27 Apr 1985.
Mülheim an der Ruhr lines connect with: ♦ Essen system        
  ♦ Oberhausen system        
           
  Essen Electric 23 Aug 1893   First tunnel segment opened 5 Oct 1967. First Stadtbahn tunnel segment opened 29 May 1977.
Essen lines connect with: ♦ Mülheim an der Ruhr system        
  ♦ Bochum - Gelsenkirchen system        
  ♦ Recklinghausen system       Now closed.
           
  Bochum - Gelsenkirchen Electric 23 Nov 1894   First tunnel segment (Bochum) opened 26 May 1979. First Stadtbahn tunnel segment (Bochum - Herne) opened 2 Sep 1989. First tunnel segment (Gelsenkirchen) opened 1 Sep 1984.
Bochum - Gelsenkirchen lines extend to: Herne   23 Nov 1894    
  Wanne-Eickel   20 Oct 1896    
  Gelsenkirchen   3 Nov 1895    
  Buer   24 Jun 1901    
  Horst   24 Jun 1901 18 Oct 1955 Now closed.
  Hattingen   1 Oct 1902    
  Witten   21 Dec 1900    
  Castrop-Rauxel   20 Dec 1909 8 May 1967  
           
  Hattingen Electric 12 Mar 1914 30 Jun 1969 Operation suspended 24 Oct 1923 - 31 May 1924 because of Occupation of the Ruhr. Separate undertaking to 1 Oct 1932.
           
  Herne Electric 20 Dec 1906 30 Sep 1959 Lines extended to Castrop-Rauxel, 15 Jul 1910 - 1 Jan 1952.
           
  Castrop-Rauxel        
Served by: Bochum - Gelsenkirchen system   1909 8 May 1967  
  Herne system   15 Jul 1910 30 Sep 1959  
  Dortmund system   1 Nov 1910 1 Jul 1962  
           
  Dortmund Horse 1 Jun 1881 1897  
Steam Feb 1892 1896  
Electric 1 Mar 1894   First tunnel segment opened 1983.
Dortmund lines extended to: Recklinghausen (Henrichenburg)   1 Nov 1910 1 Jul 1958 Now closed.
  Castrop-Rauxel   1 Nov 1910 1 Jul 1962 Now closed.
  Unna   1906 31 Mar 1965 Now closed.
           
  Unna - Kamen - Werne Electric 1 Aug 1909 15 Dec 1950 See also Dortmund.
  Hamm (im Westfalen Electric 20 Oct 1898 2 Apr 1961  


Name of System Location Traction
Type
Date (From) Date (To) Notes
Vestische Straßenbahn Recklinghausen Electric 26 Feb 1898 30 Dec 1982 Connected with Essen and Bochum - Gelsenkirchen systems.
  Lines extended to:        
  Herten in Westfalen   10 May 1901 30 May 1981  
  Wanne-Eickel   10 May 1901 15 Nov 1975  
  Buer   1907 1 Oct 1980  
  Gladbeck   1909 31 Oct 1978  
  Horst   1909 31 Oct 1978  
  Bottrop   1910 27 Nov 1976  


Bezirksregierung Düsseldorf (Düsseldorf Region) and Bezirksregierung Arnsberg (Arnsberg Region) towns not tabulated above, in geographic order, west to east:

Name of System Location Traction
Type
Date (From) Date (To) Notes
  Mönchengladbach Horse 10 Aug 1881 14 Feb 1900  
Electric 15 Feb 1900 15 Mar 1969 Lines extended to Rheydt (10 Aug 1881 - 5 Oct 1968). Connected with Krefeld system.
  Rheydt Horse 10 Aug 1881 14 Feb 1900  
Electric 15 Feb 1900 31 Jan 1959  
           
  Krefeld Steam 3 May 1883 18 Sep 1901  
Horse 11 May 1883 6 Apr 1901  
Electric 30 Oct 1901    
Krefeld lines extended to: Mönchengladbach (Neuwerk   1910 8 Mar 1954 Now closed.
  Moers   1918 2 Nov 1962 Now closed.
           
Rheinbahn Düsseldorf Horse 6 Feb 1876 21 Jun 1900  
Steam 5 Aug 1901 30 Apr 1902  
Electric 27 Jan 1896   Lines extend to Neuss (27 Dec 1901 -). First tunnel segment opened 4 Oct 1981. See also Rheinbahn; link to English-language page.
  Düsseldorf - Duisburg Electric 31 Oct 1899   New alignment opened 1 May 1926.
  ♦ Düsseldorf - Moers Electric 1911 20 Oct 1958  
  Düsseldorf - Krefeld Electric 15 Dec 1898    
  Mettmann Electric 19 Jul 1909 17 May 1952  
  ♦ Düsseldorf (Benrath) - Solingen (Ohligs) Electric 1899 15 Apr 1962  
  ♦ Düsseldorf (Benrath) - Wuppertal (Vohwinkel) Steam 1899 1900  
Electric 1900 7 May 1961  
  Neuss Electric 24 Dec 1910 7 Aug 1971 Served by Düsseldorf system (21 Dec 1901 -).  
           
  Solingen Electric 1 Jul 1897 15 Nov 1959  
Solingen lines extended to: Wuppertal (Vohwinkel)   1899 1 Oct 1958 Now closed.
  Solingen (Ohligs)   19 Nov 1898 1 Aug 1953 Now closed.
  ♦ Burg am der Wupper   1908 12 Oct 1959 Now closed.
           
  Remscheid Electric 9 Jul 1893 10 Apr 1969  
Remscheid lines extended to: ♦ Burg am der Wupper   12 Jul 1900 31 Jul 1960 Now closed.
  Wuppertal (Cronenfeld)   1901 30 Apr 1965 Worked jointly with Wuppertal system, now closed.
           
  Wuppertal Horse 10 Apr 1874 5 Feb 1896  
Steam 28 May 1891 3 Apr 1903  
Electric 16 Apr 1894 30 May 1987 Towns of Barmen, Eberfeld and several neighboring towns were amalgamated at 1929 as Wuppertal.
Barmer Bergbah ♦ Rack tramway (zahnradbahn), Barmen - Toelleturm Electric 16 Apr 1894 4 Jul 1959  
Wuppertal lines extended to: Velbert - Essen (Werden)   15 Mar 1899 1 Feb 1952 Now closed.
  Essen (Steele)   24 Nov 1907 16 Apr 1954 Now closed.
  Sprockhövel - Hattingen   1907 30 Nov 1953 Now closed.
  Schwelm - Milspe   7 Aug 1896 3 May 1969 Schwelm - Milpse segment, 18 Jan 1907 - 28 Sep 1964. Now closed.
  Remscheid   15 Aug 1901 16 Jun 1954 Now closed.
  Solingen   4 Aug 1914 3 May 1969 Now closed.
  Wülfrath   19 July 1909 1 June 1952 Now closed.
  Mettmann   19 Jul 1909 17 May 1952 Now closed.
           
  Ennepetal (in Westfalen) Electric 24 Feb 1907 31 Mar 1956  
Ennepetal lines extended: Gevelsberg - Milspe - Voerde   24 Feb 1907 31 Mar 1956 Now closed.
  Gevelsberg - Haßlinghausen   19 May 1909 31 Mar 1956 Now closed.
           
  Hagen Horse 13 Nov 1884 1 July 1898  
Accumulator (storage battery) 7 Jan 1895 20 Dec 1902  
Electric 18 Nov 1896 29 May 1976  
Hagen lines extended to: Gevelsberg   12 Apr 1900 26 Jul 1953 Now closed.
  Hagen (Hohenlimburg)   8 May 1900 15 Sep 1968 Now closed.
  ♦ Eckesey Horse 7 Jul 1895 189_  
Accumulator (storage battery) 1 Jul 1898 20 Oct 1900  
Electric 21 Oct 1900 26 May 1974  
  Hagen (Haspe) - Voerde - Breckerfeld Steam 1 May 1903 1927 (?) Opened in stages to 1906. Passenger service withdrawn 1921. restored 1926.
Electric 9 Dec 1927 Nov 1963 Separate undertaking to 1926.
  Iserlohn Electric 4 Mar 1901 31 Dec 1959  

Note for Rheydt: Amalgamated with Mönchengladbach from 29 Jul 1929 to 31 Jul 1933, and again from 1 Jan 1975.

Note for Mettmann: Line extended Düsseldorf (Auf der Hardt) - Mettmann (closed 9 Dec 1936) - Wülfrath (closed 14 May 1938) - Tönisheide (closed 14 May 1938), and Mettmann - Wieden (closed 17 May 1952). Separate undertaking to 1 Apr 1937.

Note for Wuppertal: Town tramway system ranked as fifth-largest in Germany, with peak system length of 175 km (109 mi, ca. 1948).


Bezirksregierung Köln (Cologne Region) towns in geographic order, north to south:

Name of System Location Traction
Type
Date (From) Date (To) Notes
  Opladen - Lützenkirchen Electric 9 Apr 1914 11 Jul 1955  
  Köln - Opladen - Solingen (Ohligs) / Solingen (Höhscheid) Electric 22 Jul 1911 10 Jul 1955  
  Köln Horse 28 Apr 1877 22 May 1907  
Steam 13 Nov 1893 1914  
Electric 15 Oct 1901   First tunnel segment opened 1968.
  Wahn Electric 6 May 1917 1 Oct 1961  
  Zündorf - Troisdorf - Siegburg Electric 19 Mar 1914 31 Aug 1965 Opened in stages, completed 1 Oct 1921. Closed in stages from 14 Oct 1963.
Rheinuferbahn Köln - Wesseling - Bonn Electric Sep 1905    
Vorgebirgsbahn Köln - Brühl - Bonn Electric 1 Aug 1897   Opened in stages, (Köln - Brühl) completed 20 Jan 1898.
  Bonn Horse 19 Apr 1891 24 Sep 1909  
Steam 22 May 1892 12 Oct 1911  
Electric 21 May 1902   First tunnel segment opened 22 Mar 1975.
  Bonn - Bad Godesberg Steam 22 May 1892 1911  
Electric 27 Mar 1911   Tunnel segment in Bad Godesberg opened Sep 1994.  
  ♦ Bad Godesberg - Mehlem Electric 3 Oct 1911 23 Dec 1976  
  Bonn - Siegburg Electric 21 Sep 1911    
  Bonn - Königswinter - Bad Honnef Electric 18 Mar 1913   Königswinter - Bad Honnef segment opened 27 Sep 1925.

[edit] Rheinland-Pfalz (Rhineland-Palatinate)

Name of System Location Traction
Type
Date (From) Date (To) Notes
  Bad Kreuznach Electric 11 Sep 1906 5 Jan 1953  
  Bingen (am Rhein) Electric 25 Feb 1906 20 Oct 1955  
  Idar-Oberstein Electric 1 Oct 1900 29 Jul 1956  
  Kaiserslautern Electric 18 Dec 1916 1 Jul 1935  
  Koblenz Horse 28 May 1887 1 Oct 1899  
Electric 17 Jan 1899 19 Jul 1967  
  Ludwigshafen am Rhein Horse 2 Jun 1878 23 May 1902  
Electric 30 May 1902   Operated jointly with Mannheim system (q.v.).
Rhein-Haardtbahn Ludwigshafen - Bad Dürkheim Electric 4 Sep 1913   Trains operate over town tramway systems in Ludwigshafen and Mannheim to serve business centers and main railway stations.
  Mainz Horse 27 Sep 1883 1 Oct 1904  
Steam 12 Aug 1891 8 Jun 1923  
Electric 15 Jul 1904   See also Wiesbaden (Hesse).
  Neuwied Electric 29 Jul 1901 31 Oct 1950  
  Pirmasens Electric 8 Jun 1905 3 Jul 1943  
  Trier Horse 27 Jul 1890 15 Jul 1905  
Electric 13 Oct 1905 14 Sep 1951  
  Worms|Worms (am Rhein) Electric 22 Dec 1906 29 Jan 1956  

[edit] Saarland

Name of System Location Traction
Type
Date (From) Date (To) Notes
  Neunkirchen (im Saarland) Electric 13 Sep 1907 10 Jun 1978  
  Saarbrücken Steam 4 Nov 1890 26 Sep 1899  
Electric 8 Feb 1899

24 Oct 1997

22 May 1965

-

-

International line to Sarreguemines, France.

  ♦ Rastpfuhl - Heusweiler Electric 27 Jan 1907 1948 Separate undertaking to 1 Jul 1937.
  Saarlouis Electric 20 May 1913 28 Feb 1961  
  ♦ Saarlouis - Dillingen (an der Saar)     31 May 1957  
  Völklingen (an der Saar) Electric 3 Sep 1909 18 Apr 1959  

[edit] Sachsen (Saxony)

Name of System Location Traction
Type
Date (From) Date (To) Notes
Kirnitzschtalbahn Bad Schandau Electric 28 May 1898 Operation suspended from 21 Jul 1969 following an accident. Operation restored from 24 Jul 1972.  
  Chemnitz Horse 22 April 1880 5 February 1894  
Electric 19 Dec 1893   First standard-gauge line opened 8 May 1960. Last 925-mm gauge line closed 6 Nov 1988.
  ♦ Chemnitz - Altchemnitz - Stollberg Electric 15 Dec 2002   Operates over DB railway line (Würschnitztalbahn) between Altchemnitz and Stollberg,
  Döbeln Horse 10 Jul 1892 20 Dec 1926  
  Dresden Horse 26 Sep 1872 25 Aug 1900  
Gas 28 Jul 1894 31 Dec 1895  
Electric 6 Jul 1893    
  Dresden - Bühlau Electric 22 Aug 1899   Separate undertaking to 1926.
  Dresden-Cotta - Cossebaude Electric 27 Sep 1906 2 Dec 1990 Separate undertaking to 1926.
Lößnitzbahn Dresden-Mickten - Zitzschewig Electric 21 Aug 1899   First electric narrow-gauge railway in Saxony, later regauged. Separate undertaking to 1926. Initial segment, Mickten - Weißes Roß. Weißes Roß - Radebeul - Coswig reopened in stages Sep 1929 - May 1930. Coswig - Weinböhla reopened 14 Nov 1931.
Lockwitztalbahn ♦ Dresden-Niedersedlitz - Kreischa Electric 3 Mar 1906 18 Oct 1977  
  Freiberg in Sachsen Electric 11 Aug 1902 31 Dec 1919  
  Görlitz Horse 25 May 1882 30 Nov 1897  
Electric 1 Dec 1897   See also Zgorzelec, Poland.
  Hohenstein-Ernstthal - Oelsnitz (Erzgebirge) Electric 15 Feb 1913 26 Mar 1960  
  Klingenthal (Sachsen) Electric 27 May 1917 4 Apr 1964  
  Leipzig Horse 18 May 1872 16 Apr 1897  
Electric 17 Apr 1896   See Leipzig Transport Company (LLC), Leipzig Tramway Network History.
  Meißen Electric 13 Dec 1899 1 Mar 1936  
  Plauen (im Vogtland) Electric 17 Nov 1894    
  Zittau Accumulator (storage battery) 29 Jun 22 Sep 1902  
Electric 14 Dec 1904 19 Nov 1919  
  Zwickau Electric 6 May 1894    

[edit] Sachsen-Anhalt (Saxony-Anhalt)

Name of System Location Traction
Type
Date (From) Date (To) Notes
  Bernburg Electric 1 Apr 1897 19 Apr 1921  
  Dessau Gas 15 Nov 1894 24 Mar 1901  
Electric 26 Mar 1901    
  Groß Rosenburg Horse 3 Oct 1884 1 Oct 1922  
  Halberstadt Horse 28 Jun 1887 30 Apr 1903  
Electric 2 May 1903    
  Halle an der Saale Horse 15 Oct 1882 14 May 1899  
Electric 24 Apr 1891    
  ♦ 'Halle - Merseburg Electric 15 Mar 1902   Separate undertaking to 1 May 1951.
  Magdeburg Horse 16 Oct 1877 19 Dec 1899  
Steam 14 Jul 1886 21 Mar 1900  
Electric 18 Jul 1899    
  Mansfeld - Eisleben Electric 10 Apr 1900 2 Dec 1922  
  Naumburg (an der Saale) Electric 18 Jun 1892   Operation suspended 19 Aug 1991 because of poor track condition. Reopening in 2007.
  Schönebeck - Salzelmen Horse 22 Jun 1886 15 Feb 1917  
  Staßfurt Electric 10 Apr 1900 31 Dec 1957  
  Stendal Horse 3 Jun 1892 14 Oct 1926  
  Lutherstadt Wittenberg Horse 26 Jul 1888 1921  
  Zerbst Horse 2 Nov 1891 1 Aug 1928  

[edit] Schleswig-Holstein

Name of System Location Traction
Type
Date (From) Date (To) Notes
  Wittdün - Norddorf (Amrum island, North Frisian Islands) Steam 1893 1 Nov 1939  
Electric 10 Jul 1909 Aug 1910 Use of electric traction ended because generating station was destroyed by fire. Overhead contact system removed 1920. Operation suspended 17 Oct 1918 - 1920.
  Flensburg Horse 8 May 1881 30 Dec 1906  
Electric 6 Jul 1907 2 Jun 1973  
  Kiel Horse 9 Jul 1881 11 Apr 1896  
Electric 12 May 1896 4 May 1985  
  Lübeck Horse 1 May 1881 19 Jun 1894  
Electric 12 May 1894 15 Nov 1959  
  Schleswig Horse 1 Jul 1890 31 Dec 1909  
Electric 1 Jan 1910 26 Aug 1936  

Light railway (kleinbahn) operating under tramway (straßenbahn) concession (from 1952 - 1953):

Name of System Location Traction
Type
Date (From) Date (To) Notes
  Sylt (Sylter Inselbahn)        
♦ Nordbahn Westerland - List   8 Jul 1888 29 Dec 1970  
♦ Südbahn Westerland - Hörnum   1 Jul 1901 30 May 1970  

[edit] Thüringen (Thuringia)

Name of System Location Traction
Type
Date (From) Date (To) Notes
  Altenburg Electric 18 Apr 1895 30 Apr 1920  
  Eisenach Electric 3 Aug 1897 31 Dec 1975  
  Erfurt Horse 13 May 1883 20 Aug 1894  
Electric 1 Jun 1894    
  Gera Electric 22 Feb 1892    
  Gotha Electric 3 May 1894    
Thüringerwaldbahn Gotha - Waltershausen Electric 17 Jul 1929    
  Jena Electric 6 Apr 1901    
  Mühlhausen Electric 21 Dec 1898 27 Jun 1969  
  Nordhausen Electric 25 Aug 1900    
  Weimar Electric 4 Jun 1899 30 Jun 1937  

[edit] References

[edit] See also