List of Caracas Metro stations

From Wikipedia, the free encyclopedia

Map of the Caracas metro lines, with current and future lines and stations.
Map of the Caracas metro lines, with current and future lines and stations.

The Caracas Metro (referred as El Metro by locals) is a rapid transit system operating in Caracas, capital of Venezuela.

Below is a list of the Caracas Metro subway lines and the stations that they serve.

Contents

[edit] Line 1 (Orange)

From west to east:

  • Propatria
  • Pérez Bonalde
  • Plaza Sucre
  • Gato Negro
  • Agua Salud - Future point of transfer to Line 6.
  • Caño Amarillo
  • Capitolio - Point of transfer to Line 2.
  • La Hoyada - Future point of transfer to Line 3.
  • Parque Carabobo
  • Bellas Artes
  • Colegio de Ingenieros
  • Plaza Venezuela - Point of connection to Line 3 and Line 4.
  • Sabana Grande
  • Chacaíto
  • Chacao
  • Altamira
  • Parque del Este - Future point of connection to Line 4.
  • Los Dos Caminos - Future point of trasfer to Line 6.
  • Los Cortijos
  • La California
  • Petare
  • Palo Verde

[edit] Line 2 (Green)

From north-east to south-west:

  • El Silencio - Point of transfer to Line 1.
  • Capuchinos - Point of connection to Line 4.
  • Maternidad - Point of connection to Line 4.
  • Artigas - Point of connection to Line 4.
  • La Paz - Point of connection to Line 4.
  • La Yaguara - Point of connection to Line 4.
  • Carapita - Point of connection to Line 4.
  • Antímano - Point of connection to Line 4.
  • Mamera - Point of connection to Line 4.
  • Caricuao
  • Zoológico
  • Ruiz Pineda - West ramification serviced exclusively by Line 4.
  • Las Adjuntas - Serviced exclusively by Line 4, - transfer station to (Los Teques Metro).

[edit] Line 3 (Blue)

From north-east to south-west:

  • Plaza Venezuela - Point of connection to Line 1 and Line 4.
  • Ciudad Universitaria
  • Los Símbolos
  • La Bandera
  • El Valle
  • Los Jardines - expected completion and service by 2008.
  • Coche - expected completion and service by 2008.
  • Mercado - expected completion and service by 2008.
  • La Rinconada - IAFE rail station, both completed and in service.

Next phase (project). Begins as a west ramification from El Valle station to north on San José station

  • El Valle
  • Prado de María
  • El Peaje
  • San Agustín
  • Fuerzas Armadas - Point of transfer to line Line 1 and Line 4
  • Urdaneta
  • San José

[edit] Line 4 (Red)

Construction works for next phase were initiated 18 March 2007 and expected to be completed by year-end 2011. Please note Line 4 was renamed and incorporated as part of Line 2 shortly after its inauguration.

  • Capuchinos - Point of connection to Line 2.
  • Teatros
  • Nuevo Circo
  • Parque Central
  • Zona Rental - Point of connection with Line 1 and Line 3.


Next phase - From west to east:

  • Bello Monte
  • Las Mercedes
  • Tamanaco - Future point of connection to Line 5.
  • Chuao
  • Bello Campo
  • Parque del Este II - Point of connection to lines Line 1 and Line 6.

[edit] Line 5 (Magenta)

This line is still under project.

From north to south:

  • Santa Ana
  • Santa Paula
  • San Luis
  • Santa Marta
  • Chuao
  • Tamanaco - Point of transfer to Line 4
  • San Román
  • Santa Fe
  • La Ciudadela
  • Prados del Este
  • La Iglesia
  • Baruta
  • La Trinidad
  • La Boyera
  • Los Geranios
  • El Hatillo

[edit] Line 6 (Yellow)

Most of this line is still under project.

From west to east:

  • Magallanes
  • Gato Negro
  • Agua Salud - Point of transfer to Line 1.
  • Miraflores
  • Urdaneta - Point of transfer to Line 3.
  • San Bernardino
  • Guaicaipuro
  • Maripérez
  • Las Palmas
  • Chapellín
  • La Castellana
  • Ávila
  • Santa Eduvigis' - Point of transfer to lines Line 1 and Line 4'

The following stations found in the City of Caracas are in construction under a project known as Guarenas / Guatire Metro.

  • Parque del Este - Point of transfer to lines Line 1 and Line 4
  • Montecristo - Point of transfer to line Line 1
  • Boleíta
  • Horizonte
  • La Urbina Sur
  • La Urbina Norte - Point of transfer to the Light Rail Service, Guarenas-Guatire

[edit] Los Teques Metro (Navy Blue)

  • Las Adjuntas transfer station to Caracas Metro Line 4
  • Alí Primera formerly El Tambor station

The following stations are in construction

  • Guiacaipuro - projected completion date set for 2010
  • Miranda - projected completion date set for 2010
  • Los Cerritos - projected completion date set for 2012
  • Carrizal - projected completion date set for 2012
  • Las Minas - projected completion date set for 2012
  • San Antonio - projected completion date set for 2012

[edit] Guarenas / Guatire Metro (Green Grass)

The following stations are in construction

  • La Urbina Norte transfer point
  • Caucaugüita - projected completion date set for 2012
  • Tamarinda - future project
  • Guarenas I - projected completion date set for 2012
  • Guarenas II - projected completion date set for 2012
  • Guatire I - projected completion date set for 2012
  • Guatire II - projected completion date set for 2012

[edit] External links

Languages