Line M3 - Milan Subway (Metropolitana di Milano)

From Wikipedia, the free encyclopedia

The Line 3 (Ita: Linea Tre) was built starting in 1986 for the 1990 World Cup of Football. The Line 3 is also called Linea Gialla ("Yellow Line"). Today it connects the South-Eastern suburb of San Donato Milanese to the city centre, then continues to the North-Western district.

Today the Line 3 is 13.0 km long with 17 stations. An additional 4.0 km with 4 stations are currently under construction. Work will be finished by the end of 2007/early 2008.

[edit] List of stations

  1. San Donato Milanese
  2. Rogoredo F.S. transfer to Line S9 and National Railways
  3. Porto di Mare
  4. Corvetto
  5. Brenta
  6. Lodi TIBB F.S. transfer to Line S9 and National Railways
  7. Porta Romana
  8. Crocetta
  9. Missori
  10. Duomo transfer to Line M1
  11. Montenapoleone
  12. Turati
  13. Repubblica transfer to Line S1, S2, S5, S6, S10
  14. Centrale F.S. transfer to Line M2 and National Railways
  15. Sondrio
  16. Zara
  17. Maciachini
  18. Dergano (Station Under construction)
  19. Affori Centro (Station Under construction)
  20. Affori FNM (Station Under construction)
  21. Comasina (Station Under construction)