Line 5, Beijing Subway

From Wikipedia, the free encyclopedia

Line 5 platform at Dongdan station, with platform screen doors
Line 5 platform at Dongdan station, with platform screen doors

Line 5 is a line of Beijing Subway which has finished its construction at the end of September, 2007. It opened on 7 October 2007. Line 5 is Beijing's first north-south underground railway line.

Construction work on Line 5 got underway in late 2002. A number of roads around Beijing are being bolted up for the construction of underground railway stations during construction phase. The tracks were laid in January of 2006 and operations commenced on October 7, 2007.

The line runs from Tiantongyuanbei / Tiantongyuan North (near the northern 5th Ring Road) through to Songjiazhuang in the southern part of Beijing, where it is expected to link up with the Yizhuang Light Rail.

This line is the first subway line in Beijing to feature Platform Screen Doors in underground stations, Automatic Platform Gates in elevated stations, LCD screens in every stations, and modern trains that have Digital Voice Announcements and Passenger Information System that uses LCD screens.

It runs through central Beijing, passing by places of interests like Dongdan, Tiantan Dongmen (Temple of Heaven East Gate), Yonghegong and Chongwenmen. It links up with other underground lines 1 at Dongdan, 2 at Chongwenmen and Yonghegong, and 13 at Lishuiqiao.

Yikatong card, the prepaid smart card used in Beijing's transportation system, is accepted at Line 5 as well.

Contents

[edit] History

  • December 28, 2002: Construction on Line 5 began.[1].
  • March 28, 2004: Underground tunneling started underneath Yonghegong and Hepinglibeijie stations, heralding the start of Line 5 construction in urban Beijing. The underground tunnel would pass the Temple of Heaven.
  • May 20, 2004: The underground tunnel between Yonghegong and Zhangzizhonglu stations broke through.
  • November 11, 2005: Railway tracks were laid at Huixinxijie Beikou station.
  • July 2006: The entire underground railway was completed.
  • September 2006: Platform screen doors began installation in Line 5 stations.
  • April 2007: Line 5 started trial runs without passengers.
  • October 7, 2007, 14:00: Line 5 opened to the public.
  • November 23, 2007: Sound insulation were installed on the elevated parts of Line 5 following complaints of excess noise from nearby residents.[2]

[edit] Using techniques

[edit] Stations

  • Tiantongyuanbei 天通苑北
  • Tiantongyuan 天通苑
  • Tiantongyuannan 天通苑南
  • Lishuiqiao 立水桥 (interchange with Line 13)
  • Lishuiqiaonan 立水桥南
  • Beiyuanlubei 北苑路北
  • Datunludong 大屯路东
  • Huixinxijiebeikou 惠新西街北口
  • Huixinxijienankou 惠新西街南口(interchange with Line 10)
  • Hepingxiqiao 和平西桥
  • Hepinglibeijie 和平里北街
  • Yonghegong 雍和宫 (interchange with Line 2)
  • Beixinqiao 北新桥
  • Zhangzizhonglu 张自忠路
  • Dongsi 东四
  • Dengshikou 灯市口
  • Dongdan 东单 (interchange with Line 1)
  • Chongwenmen 崇文门 (interchange with Line 2)
  • Ciqikou 磁器口
  • Tiantan Dongmen 天坛东门
  • Puhuangyu 蒲黄榆
  • Liujiayao 刘家窑
  • Songjiazhuang 宋家庄(interchange with Line 10)