The Kuala Lumpur Courts Complex (Malay: Kompleks Mahkamah Kuala Lumpur) is a large courthouse complex in Kuala Lumpur, Malaysia, housing much of the country's judicial system, the rest being in the Palace of Justice in Putrajaya. The complex is situated at Duta Road (Jalan Duta), 4km away from the earlier location of the judicial system at a collection of colonial buildings affront the Independence Square. The building was constructed beginning March 1, 2004 at a final cost of RM290 million, was opened for use on April 18, 2007, and was fully operational on May 3, 2007.

Contents

[edit] Occupants and previous locations

The Kuala Lumpur Courts Complex houses the High Court, the Sessions Court and the Magistrates' Court of Kuala Lumpur. The Court of Appeal and Federal Court are based in the Palace of Justice in Putrajaya. Night courts are also conducted to handle cases pertaining to traffic offenses.[1]

The Kuala Lumpur Courts Complex was primarily planned to hold a larger number of relevant court cases at once, as well as centralise judicial branches in the city into one building. Prior to the complex's opening, courts in Kuala Lumpur were scattered among several former colonial municipal buildings affront the Independence Square (among them, the Sultan Abdul Samad Building), as well as Wisma Denmark, the embassy of Denmark cum office building in Dang Wangi that housed the Civil High Court. The fate of the buildings at the Independence Square were left to the Tourist Minister to determine.

[edit] Layout and amenities

The complex, which consists of a single large structure is planned in a U-shaped design with a left and right wing, and has a total of six above-ground levels, of which five from the bottom each contain a collection of numbered courtrooms. Courtrooms are situated at either wings of the building, while the registrars, registries and filling counters are located closer to the center of the building. In all, the complex contains 30 courtrooms for the High Courts, 21 for the Sessions Courts and 26 for the Magistrates' Courts. Administration offices and surau's for men and women are situated on the 6th floor, the top floor of the complex. The complex is touted as the second largest courthouse in the world, although it was claimed to be the largest in the world earlier.

The complex is additionally intended to contain a library, a business centre, tunnel access to holding rooms for the accused, as well as televisions for four courtrooms to air court hearings. Closed-circuit television cameras and wireless Internet connectivity are also to be made available within the complex's vicinity. E-Court facilities that would enable court procedures to be done over the Internet were also planned. The building, which is sited on 12 ha of land, is surrounded by landscaping with rest areas and a mini park for the public.

500 parking bays for the public, 300 bays for court staff and 200 bays for judges and magistrates were also prepared in the Kuala Lumpur Courts Complex. Parking has been a major woe for the public as they are allocated merely 500 parking spaces which has to be shared with lawyers. In solving this problem, numerous steps have been taken which includes allocating special designated area for lawyers to park their vehicles, all mentions before the Sessions Court or Magistrate Judges are rescheduled to be heard in the afternoon at 2.00 p.m. (MST) (on Friday, 2:45 p.m.) [1] and also implementing shuttle service to the new court complex [2].

[edit] Architecture

The architecture of the Kuala Lumpur Courts Complex was meant to bear similarities to architectures of colonial municipal buildings, evoking hints of neoclassical architecture, Palladian architecture, as well as Mughal and Westernised styling exemplified by the Sultan Abdul Samad Building.

In addition to its symmetrical U-shaped floor plan, the Kuala Lumpur Courts Complex features a central portico that rises above the rest of the building, and features a large onion dome surrounded by four semi-spherical domes; each of the building's left and right wings has an additional set of three porticos and four semi-spherical domes. The building is adorned with colonnades of varied diameters and height of two to five floors, with verandahs behind the front and rear facades of the building's two wings.

[edit] Technical difficulties

Within a months after the start of its operation, the courts complex experienced a series of faults and technical failures, raising questions of the building's reliability and the parties involved in the construction of the building, which was only very recently opened.

The problems were reported to have started even before occupancy, beginning April:

  • Cracks measuring at least 3m long were reported in early April.
  • On April 30, 2007, just over a week after occupancy, two (four feet by four feet) ceiling panels and a downlight collapsed in a Civil Courts room at 10.30 am. No injuries were reported.[2][3]
  • Less than a week after the ceiling panel collapse, cracks measuring at least 3m long began appearing outside Magistrate's Court 4. The cracks were since patched up.[3]
  • On May 7, 2007, the air conditioning in a High Court room malfunctioned.[3]
  • On May 23, 2007, the cafeteria of the complex was flooded starting 9.15am as a result of a burst pipe endcap from a service room. The flowing water affected three quarters of the cafeteria, and reached a depth of 7 cm. Water supply was cut 15-25 minutes later, and three hours of cleaning work was needed for a return to normalcy.[3] Public Works Department director-general Selvanayagam P. Nagalingam attributed the fault to a plumber, who he claims had defaulted on following design specifications, but added that only two sub-standard endcaps were found.

    On the same day, a sewage manhole overflowed in the basement of the complex, damaging a number of files for mostly civil cases. Nagalingam was reported to have state the manhole overflow was the result of indiscriminate disposal of sanitary napkins that could have occurred for some time. The blockage was stated to be immediately cleared after Nagalingam learned of the incident at 9.28am that day.[4]

[edit] References


  1. ^ Night Courts At New Court Complex From May 3. Bernama (April 24, 2007). Retrieved on 2007-04-25.
  2. ^ PWD Probes Reason For Collapse Of Part Of Ceiling At KL Court. Bernama (2007-04-30). Retrieved on 2007-10-09.
  3. ^ a b c d Court complex hit by calamity again. The Star Online (2007-05-24). Retrieved on 2007-10-09.
  4. ^ R. Surenthira Kumar & Giam Say Khoon (2007-05-25). Manhole overflows, damaging court files. The Sun (used by permission for the Malaysian Bar website). Retrieved on 2007-10-10.