Kemerton, Western Australia

From Wikipedia, the free encyclopedia

Kemerton
BunburyWestern Australia
Established: 1985
Postcode: 6233
Area: 75 km² (29.0 sq mi)
Location: 26 km (16 mi) from Bunbury
LGA: Shire of Harvey
State District: Leschenault
Federal Division: Forrest
Suburbs around Kemerton:
Binningup Benger
Parkfield Kemerton Brunswick Jn.
Leschenault Australind

Kemerton is an industrial park in the Bunbury region of Western Australia, about 10km north-east of Australind. Its Local Government Area is the Shire of Harvey.

Contents

[edit] Description

The estate was established in 1985 as a "strategic industrial area" to provide appropriate buffered land for heavy industry. It covers an area of 7543 ha, comprising an industrial core of 2100 ha, a support industry area of 300 ha, an inter-industry buffer of 175 ha and a buffer area of 5437 ha which includes bushland, wetland, protection zones and recreational areas. A rail link connecting with the Perth-Bunbury railway is proposed.[1] It is coordinated by the Department of Industry and Resources (WA), South West Development Commission and the Shire of Harvey.

[edit] History

Little is known of the area prior to 1980 - a report in 1988 noted[2] that (p.9) "although mainly a rural area, a significant portion of the Kemerton site remains undeveloped", and there was "very little agricultural development other than the use of the land for seasonal grazing", possibly due to poor soils and inadequate drainage. The report noted a piggery and an abattoir, the latter of which is still in operation.

[edit] Proposed aluminium smelter

In 1980, Alcoa commenced investigations into potential sites for an aluminium smelter. Preliminary documentation given to the Environmental Protection Authority (EPA) indicated that three sites - Worsley Siding, Pinjarra and Kemerton - were preferred. Alcoa subsequently withdrew from the consortium. Shortly after the election of the Burke Labor government, which had in December 1983 launched the "Bunbury 2000" strategy to develop the area, a new consortium, Kukje-ICC Construction trading as International Aluminium Consortium, ruled out Pinjarra as a site. In December 1984, the State Government acquired 3700 hectares of private land at Kemerton to act as a buffer, as the EPA had recommended Kemerton over Worsley Siding due to "fewer uncertainties of ecological interactions, a much better knowledge of potential implications and lower environmental risks"[3]. A detailed environmental impact assessment of a proposal by the consortium for a 230,000 tpa smelter was carried out in 1985, and Town Planning Scheme No.10 (Shire of Harvey) was amended to zone the land industrial, but the proposal was deferred indefinitely in 1987 for economic reasons.

[edit] Development of the Industrial Park

The rezoning and considerations led to other expressions of interest, and in 1988-1989, several other industries moved into the area and commenced operations, and a draft structure plan was submitted for State Government approval. A new consortium, led by Pennant/John Holland and Wardley Australia Ltd, proposed in February 1989 a single potline smelter with 20% less capacity than the 1985 proposal, but this did not proceed either. The Kemerton Steering Committee (later KIPCC) was formed in April 1989, and at around the same time, a trade magazine article claimed that Kemerton, with its integration of natural bushland, wetland and plantation forestry and an interpretative centre into the planning of the industrial park, "could well become a model for establishing industry as an acceptable land-user in sympathy with environmental values."[4]

[edit] Industries

Some of the industries at Kemerton include:

  • Millennium Inorganic Chemicals (formerly SCM Chemicals until 1997), a Lyondell company, manufactures titanium dioxide pigment using the chlorine process from rutile, or synthetic rutile made from locally-mined ilmenite. In 2004/05, 85,000 tonnes of pigment was produced at a value of approximately $300 million. The titanium dioxide pigment is then used in the production of paints, plastics, paper, rubber, printing inks, cosmetics and pharmaceuticals. The plant was established in 1990, and previously (as LaPorte/SCM) operated from Australind from 1964 to 1990 using a less environmentally palatable sulfate process producing 40,000 tonnes per year of TiO2.[5][6]
  • BOC Limited (previously CIG) operates an air separation unit in Kemerton to supply 280 tonnes per day of oxygen and nitrogen to Millennium. The plant has liquid storage onsite and serves the Kemerton Industrial Park through the nearby Bunbury Gas and Gear.
  • Nufarm-Coogee Pty Ltd, a joint venture between Nufarm Limited (80%) and Coogee Chemicals Pty Ltd (20%), operates a chlor-alkali plant to supply chlorine to the local titanium dioxide processing industry, using about 40,000 tonnes of salt to produce about 20,000 tonnes of chlorine and 20,000 tonnes of caustic soda (NaOH).
  • Simcoa Operations, owned since 1996 by the Japanese Shin-Etsu Chemical Company which has interests in silicone manufacturing operations in Asia, operates the only silicon producing smelter in Australia. It was commissioned in 1989-90 by Barrack Mines, and in 2005, approximately 32,000 tonnes of premium grade silicon (predominantly 99.5% grade) was produced at an estimated value of $75 million. Silicon is used in the production of aluminium alloys, silicones and solar grade silicon wafers. Silica fume is also produced and sold as an additive for high-performance concrete[7]
  • Kemerton Silica Sand is a joint venture between the Japanese companies Itochu Corporation and Tochu Co Ltd, and has a feldspathic silica sand mine just north of the Kemerton Industrial Park. The bulk of the sand is suitable for the container glass and sheet glass industry in Japan and the Asian region, and the first shipment was despatched in July 1996. In 2004/05, 334,532 tonnes of silica sand were exported.
  • Transfield Services opened a 260 megawatt gas-fired power station (with a diesel backup) on 1 November 2005, delivering power to the South West Interconnected System (SWIS) under a 25-year agreement with Verve Energy (an arm of WA's state power utility). The project is the first major privately owned power station to be constructed in WA. A 30-year generation licence was granted under the Electricity Industry Act 2004 on 20 March 2006.[8]
  • The Water Corporation of Western Australia opened a $13 million waste water treatment plant in 2003, replacing two in nearby Australind and Eaton and is capable of treating 3 million litres of waste water per day. Some of the treated water is recycled and used to water nearby tree farms.
  • Goodchild Abattoir Pty Ltd, a family-owned company, have operated an abattoir in the area since the late 1970s. 35,000 beef cattle and 225,000 sheep and lambs are processed each year.

[edit] References

  1. ^ Department of Industry and Resources (24 November 2005). Kemerton Industrial Park. Retrieved on 2006-10-03.
  2. ^ Feilman Planning Consultants, Dames & Moore et al. Kemerton Industrial Park - Draft Report, November 1988. Accessed at Battye Library, Perth (Q333.77 KEM).
  3. ^ Quoted in Dames & Moore Kemerton Aluminium Smelter = Public Environment Report, February 1989, pp1, 12-13 (for Kemerton Aluminium Limited). Accessed at Battye Library, Perth.
  4. ^ "Bushland setting - buffer zone for heavy industry", Prospect, Autumn 1989, pp4-5.
  5. ^ ACTED Consultants. Titanium dioxide pigment. Retrieved on 2006-10-03.
  6. ^ South West Development Commission. Major Mineral Resources Projects. Retrieved on 2006-10-03.
  7. ^ ACTED Consultants. Silicon and silicon chemicals. Retrieved on 2006-10-03.
  8. ^ Reed Business Information (13 June 2006). All purpose power. Retrieved on 2006-10-03.

[edit] External links


Towns in the Shire of Harvey

Australind | Benger | Binningup | Brunswick Jn. | Cookernup | Harvey | Kemerton | Leschenault | Myalup | Roelands | Wokalup | Yarloop

Towns in the Shire of Waroona

Hamel | Lake Clifton | Nanga Brook | Preston Beach | Wagerup | Waroona