Hokkaidō Shinkansen
From Wikipedia, the free encyclopedia
This article or section contains information about a planned or expected public transportation infrastructure. It may contain information of a speculative nature and the content may change dramatically as the construction and/or completion of the infrastructure approaches, and more information becomes available. |
The Hokkaidō Shinkansen (北海道新幹線) is a high-speed rail line currently under construction between Aomori (Honshū) and Hokkaidō through the Seikan Tunnel. Construction started in May 2005, and the initial Shin-Aomori to Shin-Hakodate section is projected to open in 2015. There are long-term plans to extend the line to Sapporo. The line will be operated by the Hokkaido Railway Company (JR Hokkaidō).
Tōhoku and Hokkaidō Shinkansen services are hoped to be operated at speeds of up to 360 km/h. The proposed journey time from Tokyo to Sapporo is advertised locally as 3 hours, 57 minutes.
At the present time the Seikan Tunnel can only carry narrow-gauge traffic (Kaikyō Line), but it will be upgraded to dual gauge, with both standard and narrow-gauge tracks.
In the early 1970s, two other Shinkansen routes were proposed for Hokkaidō: Sapporo - Asahikawa and Oshamanbe - Sapporo (South Route). Plans have been indefinitely shelved at the present time.
[edit] Stations
Station name | Japanese | Total distance | Transfers | Location | |
---|---|---|---|---|---|
Under construction, scheduled to open before April 2016 | |||||
Shin-Aomori | 新青森 | 0 km | JR East: Ōu Main Line, Tōhoku Shinkansen | Aomori | Aomori |
Oku-Tsugaru 1 | 奥津軽 | 38.5 km | JR East: Tsugaru Line (Tsugaru-Futamata) JR Hokkaidō: Kaikyō Line (Tsugaru-Imabetsu 2) |
Imabetsu | |
(Seikan Tunnel) | |||||
Kikonai | 木古内 | 113.3 km | JR Hokkaidō: Esashi Line, Kaikyō Line | Kikonai | Hokkaidō |
Shin-Hakodate 1 | 新函館 | 148.9 km | JR Hokkaidō: Hakodate Main Line (Oshima-Ōno 2) | Hokuto | |
Planned | |||||
Shin-Hakodate | 新函館 | Hokuto | Hokkaidō | ||
Shin-Yakumo 1 | 新八雲 | 203 km | Yakumo | ||
Oshamanbe | 長万部 | 236.1 km | JR Hokkaidō: Hakodate Main Line, Muroran Main Line | Oshamanbe | |
Kutchan | 倶知安 | 290.2 km | JR Hokkaidō: Hakodate Main Line | Kutchan | |
Shin-Otaru 1 | 新小樽 | 328.2 km | Otaru | ||
Sapporo | 札幌 | 360.2 km | JR Hokkaidō: Chitose Line, Hakodate Main Line, Sasshō Line (Gakuen-Toshi Line) Sapporo City Subway: Namboku Line, Tōhō Line |
Kita, Sapporo |
- 1: The name is tentative.
- 2: The current name will be changed when the Shinkansen line opens.
|