High Speed 1

From Wikipedia, the free encyclopedia

High Speed One / CTRL
ABZrg
West Coast Main Line
TUNNELa STRrg KRZo
Midland Main Line
BHFr ABZgf STR
0 km London St Pancras
tABZlf ABZld ABZrf
North London Line
exTUNNELe kABZlf
Thameslink 2000 tunnels
eABZfg lfKRZo kABZ3lf
East Coast Main Line
KBFe TUNNELa
London west tunnel 7.5 km
TUNNELe xKDSa
Temple Mills Eurostar Depot (single track)
eBHF TUNNEL2
9 km Stratford International
ABZlf STRrf
Temple Mills Line
TUNNEL1
10 km London east tunnel 10 km
ABZlg
21 km Ripple Lane freight connection
WBRÜCKE
Rainham viaduct 0.5 km
KRZo
27 km Aveley viaduct 1 km
AKRZo
30 km Thurrock viaduct (A282) (1.2 km)
TUNNEL1
32 km River Thames tunnel (2.5 km)
BHF
37 km Ebbsfleet International
LUECKE eABZlf exHLUECKE
North Kent Line
STR eGRENZE
Phase 1 - Phase 2 boundary
ABZlf ABZlg
39 km Fawkham Junction link line
STR
to Chatham Main Line for London Waterloo
WBRÜCKE
50 km Medway Viaduct over Medway (1.2 km)
TUNNEL1
54 km North Downs Tunnel (3.2 km)
STR
TUNNELa
88 km Ashford cut and cover tunnel (1.5 km)
STRrg tKRZ ABZ3rg
Maidstone East Line
ABZdg tABZdf ABZlg
South Eastern Main Line
ABZrg tKRZ STRrf
89 km
BHF TUNNELe
90 km Ashford International
ABZrf ELEVa
Marshlink Line
STR ELEV KDSa
Ashford CTRL-DS Depot (Hitachi)
ABZlf KRZo-ELEV ABZ3lf
Ashford to Ramsgate
ABZlf KRZo-ELEV STRlg
91 km Ashford Flyover (1.5 km)
STR ELEVe STRd
ABZlf ABZdg STRrf
LUECKE STR
LUECKE STR
TUNNELa ABZlf STRlg
tÜWKul ÜWor xvSTRa
ÜWo+l ÜWu+r vexSTR-STR
KRZo ABZrf vexSTR-STR
South Eastern Main Line
STR eABZrg evSTRrf
STRu DST STRd
106 km Dollands Moor Freight terminal
STRlf ABZdg STRrf
AKRZo
M20
STRrg KRZo STRlg
108 km CTRL/Eurotunnel boundary
STRlf ABZlg DST
Cheriton Shuttle Terminal (Folkestone)
ABZrg STRrf
TUNNELa
109 km Channel Tunnel to LGV Nord
tÜST
tGRENZE
A Eurostar train on the CTRL, near Ashford
A Eurostar train on the CTRL, near Ashford
A Eurostar train near Strood
A Eurostar train near Strood
Eurostar train at St Pancras  having just arrived from Brussels-South
Eurostar train at St Pancras having just arrived from Brussels-South

High Speed 1 (HS1), known as the Channel Tunnel Rail Link (CTRL) during construction, is a 108 km (67 mile) high-speed railway line running from London through Kent to the British end of the Channel Tunnel.

The second and final section of the line, travelling across the River Thames and into London St Pancras, opened on 14 November 2007.[1] Built at a cost of £5.2bn, the new link has cut pre-2003 Eurostar journey times by 40 minutes. It is now possible to travel from London St Pancras to Paris Gare du Nord in 2 hours 15 minutes and to Brussels South in 1 hour 51 minutes.[2]

In addition to Eurostar trains to Continental Europe the route will be used for several domestic services including a high-speed commuter service using new Hitachi-built Class 395 trains.

On 14 November 2006, London and Continental Railways adopted the brand name High Speed 1 for the completed railway. Official legislation, documentation and line-side signage has continued to refer to "CTRL".

Contents

[edit] Route

All CTRL connections are fully grade-separated. This is achieved through use of viaducts, bridges, cuttings and in one case, the tunnel portal itself.

  • Temple Mills Depot: At Stratford International, there is an additional line in the centre of the station accessible from the St. Pancras end only. This single-track line passes through the centre of the station, then rises up an incline across the south-bound "down" lines within the main Stratford International "box" before continuing in a tunnel until parallel with the Temple Mills Line where the line enters the depot.
  • Ripple Lane Freight Connection: This occurs immediately before the entrance to the London Tunnels, allowing the "up" and "down" freight connections to meet on top of the tunnel portal.
  • The 4 km (2.4 mile) Waterloo Connection leaves the CTRL at Southfleet Junction using a grade-separated junction; the main CTRL tracks continue uninterrupted through to CTRL Section 2 underneath the southbound flyover. The connection joins the Chatham Main Line at Fawkham Junction with a flat crossing.
  • Ashford International: Normally at LGV stations, the through tracks are in the centre. At Ashford the station is off to one side of the LGV route. The CTRL approaches Ashford International from the north in a cut-and-cover "box"; the south-bound line rises out of this cutting and crosses over the main tracks to enter the station. The main CTRL tracks then rise out of the cutting and over a flyover. On leaving Ashford, southbound Eurostars return to the CTRL by travelling under this flyover and joining from the outside. The international platforms at Ashford are supplied with both 25kV and 3rd rail, avoiding the need to switch power-supplies.
  • At Dollands Moor, the CTRL "up" and "down" lines divide with one going each side of the freight terminal and meet up again beyond the terminal. The connections to the freight terminal therefore join and leave from the centre of the main tracks at both ends of the complex.

[edit] Background

A high-speed rail line, LGV Nord, has been in operation between the Channel Tunnel and the outskirts of Paris since the Tunnel's opening in 1994. This has enabled Eurostar rail services to travel at 300 km/h (186 mph) for this part of their journey. A similar high-speed line from the French border to Brussels, HSL 1, opened in 1997. However, in Britain Eurostar trains had to run at much lower speeds on existing tracks between London and the Channel Tunnel. These tracks were shared with local traffic, limiting the number of services that could be run, as well as their timings. The elderly nature of some of this rail infrastructure caused a disproportionate number of delays, reducing the appeal of the Eurostar service.

The original plan for the Channel Tunnel Rail Link involved a tunnel reaching London from the south-east, and an underground terminus in the vicinity of Kings Cross station. However a late change in the plans, principally driven by the then deputy prime minister Michael Heseltine's desire for urban regeneration in East London, led to a change of route, with the new line approaching London from the east. This opened the possibility of reusing the underused St Pancras station as the terminus, with access via the North London Line that crosses the throat of the station.[3]

The idea of using the North London line proved illusory, and it was rejected in 1994 by the then transport secretary, John MacGregor, as difficult to construct and environmentally damaging. However the idea of using St Pancras station as the core of the new terminus was retained, albeit now linked by 20 km (12 miles) of specially built tunnels to Dagenham via Stratford.[3]

London and Continental Railways (LCR) was selected by the UK government in 1996 to undertake construction of the line, as well as the reconstruction of St Pancras station as its terminus, and to take over the British share of the Eurostar operation, Eurostar (UK). The original LCR consortium members were National Express Group, Virgin Group, S. G. Warburg & Co, Bechtel and London Electric. Whilst the project was under development by British Rail it was managed by Union Railways, which became a wholly owned subsidiary of LCR.

Originally, the whole route was to be constructed as a single project. However, in 1998 it ran into serious financial difficulties and with its future looking uncertain the project was split into two separate phases, to be managed by Union Railways (South) and Union Railways (North). A recovery programme was agreed whereby LCR sold government-backed bonds worth £1.6bn to pay for the construction of section 1, with the future of section 2 still looking in doubt. The original intention had been for the new railway, once completed, to be run by Union Railways as a separate line to the rest of the British railway network. However as part of the 1998 rescue plan it was agreed that, following completion, section 1 would be purchased by Railtrack, along with an option to purchase section 2. In return, Railtrack was committed to operate the whole route as well as St Pancras railway station which, unlike all other former British Rail stations, was transferred to LCR/Union Railways in 1996.

In 2001, Railtrack announced that, due to its own financial problems, it would not undertake to purchase section 2 once it was completed. This triggered a second restructuring. The 2002 plan agreed that the two sections would have different infrastructure owners (Railtrack for section 1, LCR for section 2) but with common management by Railtrack. Following yet further financial problems at Railtrack its interest in the CTRL was sold back to LCR who then sold the operating rights for the completed line to Network Rail, Railtrack's successor. Under this arrangement LCR will become the sole owner of both sections of the CTRL and the St Pancras property, as per the original 1996 plan.

As a consequence of the project's restructuring the LCR consortium is, as of 2006, construction firms Arup, Bechtel, Halcrow and Systra (who form Rail Link Engineering (RLE)), transport operators National Express Group and SNCF (who operate the Eurostar (UK) share of the Eurostar service with the National Railway Company of Belgium and British Airways), electricity company EDF and UBS Investment Bank. On completion of section 1 by RLE, the line was handed over to Union Railways (South), who then handed it over to London & Continental Stations and Property (LCSP) who are the long term owners of the line. Once section 2 of the line had been completed it was handed over to Union Railways (North) who handed it over to LCSP. Management, operation and maintenance of the entire line, including St Pancras, is undertaken by Network Rail.

In February 2006 there were strong rumours that a 'third party' (believed to be a consortium headed by banker Sir Adrian Montague) had expressed an interest in buying out the present partners in the project.[4] LCR shareholders subsequently rejected the proposal,[5] and the Government, who effectively could overule shareholders' decisions as a result of LCR's reclassification as a state-owned body,[6] decided that discussions with shareholders would not take place imminently, effectively backing shareholders' views on the proposed takeover.[5]

[edit] The project

Model showing the current redevelopment of the King's Cross area with the new extension to the barrel-vaulted St Pancras Station on the left.
Model showing the current redevelopment of the King's Cross area with the new extension to the barrel-vaulted St Pancras Station on the left.

The legal framework for the new railway line lies in the Channel Tunnel Rail Link Act 1996 providing construction powers that ran for the following 10 years. Amendments were made in 2001 for the new station at Stratford International and through connections to the West-Coast Main Line.

Section 1 of the Channel Tunnel Rail Link, opened on 28 September 2003, is a 74 km (46 mile) section of high-speed track from the Channel Tunnel to Fawkham Junction in north Kent. The section's completion cut the London–Paris journey time by around 21 minutes, to 2h 35mn. The line includes the Medway Viaduct, a 1.2 km (¾ mile) bridge over the River Medway and the North Downs Tunnel, a 3.2 km (2 mile) long, 12 m (40 ft) diameter tunnel. In safety testing on the section prior to opening, a new UK rail speed record of 334.7 km/h (208.0 mph) was set.[7] Much of the new high-speed line runs alongside the M2 and M20 motorways through Kent. After completion, Eurostar trains continued to use suburban lines to enter London, arriving at Waterloo International.

Section 2 of the project opened on 14 November 2007 and is a 39.4 km (24 mile) stretch of track from the newly built Ebbsfleet station in Kent to London St Pancras. Completion of the section cut journey times by a further 20 minutes (London–Paris in 2h 15m; London–Brussels in 1h 51m). The route starts with a 2.5 km (1.5 mile) tunnel which dives under the Thames near Dartford, then runs alongside the London, Tilbury and Southend Railway as far as Dagenham, where it enters a 19 km (12 mile) tunnel (51°31′36.9″N 0°8′13.9″E / 51.526917, 0.137194), before emerging over the East Coast Main Line near St Pancras. The tunnel is interrupted by the new Stratford International railway station where a 1 km stretch runs close to the surface, dividing the tunnel into London East and London West sections. Stratford International will serve the main site for the 2012 Summer Olympics. The new depot at Temple Mills, to the north of Stratford, replaces the North Pole depot in the west of London. In testing, the first Eurostar train ran into St Pancras on 6 March 2007.[8] Since the November 2007 opening of the section, all Eurostar trains run to St Pancras, and the Waterloo Terminal closed.

[edit] Engineering notes

The CTRL connection at St. Pancras Station in April 2007
The CTRL connection at St. Pancras Station in April 2007
  • The CTRL project was one of the United Kingdom's largest civil engineering projects, encompassing many new bridges and combined tunnels nearly as long as the Channel Tunnel itself.
  • Track and signalling technology (TVM-430 + KVB) are the same as those used on the French LGV Nord high-speed line. The areas around St. Pancras and Gare du Nord use KVB signalling with the whole of the high-speed route to Paris (CTRL, Channel Tunnel, LGV Nord) using TVM-430. Signalling tests before opening were performed by the SNCF-owned "Lucie" test car.[9]
  • The twin tunnels bored under London were driven from Stratford westwards towards St Pancras, eastwards towards Dagenham and from Dagenham westwards to connect with the tunnel from Stratford. The tunnel boring machines were 120 m long and weighed 1,100 tonnes. The depth of the tunnel varies from 24 m to 50 m.
  • At St. Pancras station, the new extension has doubled the length of the central platforms now used for Eurostar services. New platforms have been provided for existing domestic East Midlands Trains and future Southeastern high-speed services that will run along High Speed 1 to Kent. New platforms on the Thameslink line across London were built beneath the western margins of the station and the existing platforms at King's Cross were closed.

The construction works were complex and a large number of contractors have been involved in delivering them[10].

[edit] Additional information

CTRL North Downs Tunnel, country portal near Blue Bell Hill
CTRL North Downs Tunnel, country portal near Blue Bell Hill

After local protests, early plans were modified to put much more of the track into tunnel up until a point approximately 1-mile (2 km) from St. Pancras. For example, the Link now passes underneath in a tunnel, rather than alongside, the North London Line on approach into St. Pancras. Previously, an elevated section had been expected. The CTRL Section 2 construction works have been causing considerable disruption around the Kings Cross area of London, but are bringing in their wake much redevelopment. The huge redevelopment area includes the run-down areas of post-industrial and ex-railway land close to King's Cross and St Pancras, a conservation area with many listed buildings.

In 2002 the CTRL project was awarded the "Major Project Award" at the British Construction Industry Awards.

Section 2 of the rail link was a factor in London's successful 2012 Olympic Bid, promising a seven-minute journey time from Stratford to St. Pancras to be operated as Olympic Javelin by Southeastern.

On Tuesday 16 August 2005, a fire broke out on a maintenance train in the tunnel under the Thames. Darren Brown, (40) died at the scene,[11] while the train's driver Douglas Lynch suffered major burns and was taken to the hospital; he died the following Saturday.[12]. Despite this it holds the record for the fewest number of deaths caused by accidents during construction of any major railway line in Britain. The reason for this is modern health and safety standards - the CTRL is the only major railway line to have been constructed in Britain since the London Extension of the Great Central Railway (opened 1899).

On 4 September 2007, a train travelled from Paris Gare du Nord to St. Pancras in 2 hours 3 minutes and 39 seconds. [13]

On 19 September 2007, a train travelled from Brussels South to St. Pancras in 1 hour 43 minutes. [14]

[edit] See also

[edit] References

  1. ^ RailStaff (2006-11-14). High Speed One - and Only. Retrieved on 2006-11-14.
  2. ^ Eurostar (2006-11-14). Eurostar to launch passenger services at St Pancras International on Wednesday 14 November 2007. Retrieved on 2006-11-15.
  3. ^ a b How St Pancras was chosen. BBC (2007-11-14). Retrieved on 2007-11-19.
  4. ^ Times Online (2006-02-19). City grandee tries to grab tunnel link firm. Retrieved on 2006-11-15.
  5. ^ a b RailStaff (2006-03-31). LCR rejects takeover bid. Retrieved on 2006-11-15.
  6. ^ Guardian Unlimited (2006-02-21). Debt-laden Channel tunnel rail link is 'nationalised'. Retrieved on 2006-11-15.
  7. ^ EUROSTAR BREAKS UK HIGH SPEED RECORD. Erik's Rail News (2003-07-30). Retrieved on 2007-04-12.
  8. ^ Railway Herald on-line magazine, Issue 75
  9. ^ Certification of the TVM430 signalling system on the CTRL almost caused a delay in opening of section 1 in 2003. See Britain finally joins the high-speed club: the first section of CTRL opens on September 28, International Railway Journal, August 2003.
  10. ^ High Speed 1 List of Contractors
  11. ^ BBC News (2005-08-17). Man killed in rail tunnel blaze. Retrieved on 2006-11-15.
  12. ^ BBC News (2005-08-21). Channel Tunnel burns victim dies. Retrieved on 2006-11-15.
  13. ^ BBC News (2007-09-04). Eurostar set Paris-London record. Retrieved on 2007-09-04.
  14. ^ Daily Telegraph (2007-09-20). Eurostar sets new record from Brussels. Retrieved on 2007-09-20.

[edit] External links