High-speed rail in Germany

From Wikipedia, the free encyclopedia

3rd Generation ICE
3rd Generation ICE

Construction on first German high-speed lines began shortly after that of the French LGVs. Legal battles caused significant delays, so that the InterCityExpress (ICE) trains were deployed ten years after the TGV network was established.[citation needed] The ICE network is more tightly integrated with pre-existing lines and trains as a result of the different settlement structure in Germany, which has almost twice the population density of France. ICE trains reached destinations in Austria and Switzerland soon after they entered service, taking advantage of the same voltage used in these countries. Starting in 2000, multisystem third-generation ICE trains entered the Netherlands and Belgium. The third generation of the ICE has a service speed of 330 km/h (205 mph) and has reached speeds up to 363 km/h (226 mph). Admission of ICE trains onto French LGVs was applied for in 2001, and trial runs completed in 2005. Since 2008, ICEs service Paris from Frankfurt and Saarbrücken via the LGV Est. Unlike the TGV or Shinkansen, a first generation ICE has had a fatal high speed crash (near Eschede), following numerous complaints of excessive shaking. Since the crash, the ICE wheels have been redesigned.

Germany has developed the Transrapid, a magnetic levitation train system. The Transrapid reaches speeds up to 550 km/h (340 mph). A test track with a total length of 31.5 km (19.5 mi) is operating in Emsland. In China, Shanghai Maglev Train, a Transrapid technology based maglev built in collaboration with Siemens, Germany, has been operational since March 2004.