Talk:Harmelen train disaster

From Wikipedia, the free encyclopedia

This article is within the scope of WikiProject Trains, an attempt to build a comprehensive and detailed guide to rail transport on Wikipedia. If you would like to participate, you can visit the project page, where you can join the project and/or contribute to the discussion.
See also: WikiProject Trains to do list
Start This article has been rated as start-Class on the quality scale. (assessment comments)
??? This article has not yet received a rating on the importance scale within the Trains WikiProject.

While the ladder crosser at the junction increase the length of conflicting trackage by a small amount, it is really doesn't make much difference.

More important are:

  • length of overlap from red signal to fouling point at junction.
  • for moderate cost there could have been two warning signals approaching junction, say a double yellow and a yellow.
  • in view of lack of ATP or ATB, there could have been two red signals protecting the junction, with a really long overlap from the first red to the fouling point.
  • special rules when there is fog, although this is really only required with kerosine lit mechanical signals.

Syd1435 09:30, 2004 Dec 1 (UTC)