GO Transit
From Wikipedia, the free encyclopedia
GO Transit | |
---|---|
click on map to enlarge |
|
Reporting marks | GOT |
Locale | Greater Toronto and Hamilton Area (GTHA) plus environs |
Dates of operation | 1967–present |
Track gauge | 1435 mm (4 ft 8½ in) (standard gauge) |
Headquarters | Toronto, Ontario |
GO Transit (AAR reporting marks GOT) is the interregional public transit system serving the conurbation in Ontario, Canada referred to by Metrolinx as the "Greater Toronto and Hamilton Area" (GTHA)[1] and extending to several communities beyond it. GO carries over 50 million passengers a year using an extensive network of train and bus services; rail service is provided by diesel locomotives pulling trains of unpowered double-deck passenger cars, while most bus service is provided by inter-city coaches.
Canada's first such system, GO Transit began regular passenger service on May 23, 1967 under the auspices of the Ontario Ministry of Transportation. Over time it has been constituted in a variety of public-sector configurations, today existing as a provincial crown agency legally known as the Greater Toronto Transit Authority (GTTA). GO is headed by a board consisting of appointees of the province and GTHA municipalities. The Greater Toronto Transportation Act, 2006 provides for the eventual transfer of responsibility for GO Transit to Metrolinx, after the applicable sections of the Act are proclaimed in force. [2]
Contents |
GO Train lines | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
[edit] Service area
The Greater Toronto and Hamilton Area (GTHA) consists of the City of Toronto, the City of Hamilton, and the surrounding Regions of Halton, Peel, York, and Durham. Each of these cities or regional municipalities has representation in GO's governance structures. GO Transit also reaches beyond the GTHA into Simcoe, Dufferin, and Wellington Counties, although service to these jurisdictions is generally less extensive, and with the exception of Barrie and Bradford, bus-based only.
In total, GO trains and buses serve a population of 7 million in an 8,000 km² (3,000 sq.mi.) area radiating in places more than 100 km (60 mi) from downtown Toronto. Present extrema are Hamilton and Guelph to the west; Orangeville, Barrie, and Beaverton to the north; and Port Perry and Newcastle to the east.
The GO system map shows seven train routes, all departing from Toronto's Union Station and mostly named respectively after the outer terminus of train service. Although colours and letters, noted below, are assigned in a consistent fashion to each line in all official media, in practice lines are rarely referred to by anything other than their names.
A | Lakeshore West line (to Hamilton) |
B | Lakeshore East line (to Oshawa, with buses to Newcastle) |
C | Milton line |
D | Georgetown line (to Georgetown, with buses to Guelph) |
E | Barrie line |
F | Richmond Hill line |
G | Stouffville line (to Stouffville, with buses to Uxbridge) |
The Lakeshore East and West rail lines frequently operate on an interlined basis: most off-peak and some peak-period trains provide through service between stations east and west of Toronto. With this exception, however, direct movement between the various "legs" is quite limited. While several GO buses run on orbital routes that connect multiple legs, all rail-based interchange from one line to another (with the aforementioned exception of the Lakeshore lines) requires switching trains at Union Station. (Trains on multiple routes pass through or by each of the Bloor, Danforth and Scarborough railway stations, but each station is assigned to a single corridor and only accordingly-routed trains stop there.)
[edit] Rail
GO trains are easily identifiable; all rolling stock is green and white, and the carriages are double-decked and shaped like elongated octagons. These Bombardier BiLevel carriages were originally designed for GO in the 1970s, and are now used by a number of other commuter railways across the continent. GO Trains generally operate in a push-pull configuration.
Most of the GO Train route network operates only in peak rush-hour periods and then only in the primary direction of travel. For example, as of February 2006, the Milton line service consists of six trains leaving Milton each weekday between 6:25 and 7:58 a.m.[3], and six trains leaving Toronto each weekday between 4:30 and 7:00 p.m[4].
There is off-peak train service on parts of the Lakeshore and Georgetown lines. Hourly trains operate on weekdays off-peak hours and weekends between Aldershot and Oshawa. The Georgetown line has a more limited off-peak train service between Toronto and Bramalea.
Although it owns its locomotives and carriages, GO contracts out the operation of its trains to the Canadian Pacific Railway on the Milton line, and to CN on all others. As a result, GO Train service has been previously disrupted by non GO Transit related labour disputes.
A five-year contract with Montreal-based Bombardier Inc. means 160 unionized engineers, conductors and newly coined "customer service ambassadors" will replace Canadian National crews now operating the trains on six of GO's seven lines. CN, which owns most of the tracks, switches and signals, will be training the new crews to take over in June 2008. Canadian Pacific Railway will continue to operate GO's Milton line. Bombardier will continue to run trains with three-person crews, but their functions will change a bit. Traditionally, the conductor focuses on safe operation, but also does customer service. Bombardier will put two engineers on each train, each driving in just one direction. When not driving, the spare engineer will handle operations. The crew person stationed in the accessible coach, formerly the conductor, will be a customer service ambassador.[5]
[edit] Bus
Founded | 1970 |
---|---|
Headquarters | Toronto, Ontario |
Service area | Greater Toronto and Hamilton Area (GTHA) and environs |
Service type | Intercity coach service |
Fleet | 305 [6] |
Operator | GO Transit |
Web site | Official Web site |
Each train route has a corresponding GO Bus service for the times (and directions) when the trains are not operating. These accept the same tickets as the trains and in many cases serve the same stations. For example, buses operate from Toronto to Milton, and from Aldershot station in West Burlington to Hamilton, at all times except the weekday evening peak when trains are available. Some train routes are similarly extended by buses at all times, as noted in the list of routes, with through buses when the trains do not run. Thus buses to Guelph operate from Georgetown in the evening peak, and from Toronto at other times.
Still other GO Buses are independent of rail services. Some parts of the route network use expressways (such as the frequent Toronto–Hamilton express bus via the Queen Elizabeth Way) while others are more local in character. Toronto Pearson International Airport is served by a route from Brampton to Yorkdale and York Mills subway stations. In April, a new route serving Toronto Pearson International Airport will be inaugurated- it will run from Mississauga City Centre to Richmond Hill City Centre via the airport. Buses serving downtown Toronto operate to a terminal adjacent to Union Station.
Most GO buses are of inter-city coach design, and carry approximately 50 passengers. Double-decker coaches will debut in April 2008, exclusively operating on GO's Highway 407 and Highway 403 corridor on the Oakville GO Station branch.[7]They will feature reclining seats, 12-volt AC outlets, and other amenities.[7] However, once GO receives more, it will provide usage to York Region.[7] GO also operates several Orion V buses, which more closely resemble conventional urban transit buses. These vehicles are used primarily on routes that are more local in nature, such as the Yonge Street and Highway 2 (Kingston Road) corridors. When York Region Transit took over most of the service on Yonge Street, a number of these Orion Vs were sold to them. All GO Buses are diesel-powered.
[edit] Connections
GO connects with every municipal transit system in the Greater Toronto and Hamilton Area, plus Barrie Transit and Guelph Transit.
[edit] TTC connections
The Toronto Transit Commission (TTC) provides the most connections with GO Trains and convenient connections can be made between the trains and TTC buses, streetcars, and subway trains.
Immediately adjacent to the GO concourse at Union Station is the Union subway station on the TTC's Yonge-University Spadina line. The Union subway station also includes the terminus for the TTC's Harbourfront (509) and Spadina (510) streetcar lines.
Four subway stations on the TTC's Bloor-Danforth line either are close to or directly connect to GO Train stations:
- Kipling subway station has a direct connection to Kipling GO Station (on the Milton line),
- Kennedy subway station has a direct connection to the Kennedy GO Station (on the Stouffville line).
- Dundas West subway station is near Bloor GO Station (on the Georgetown line), and
- Main Street subway station is near Danforth GO Station (on the Lakeshore East line)
The Leslie subway station on the Sheppard subway line does not currently connect with the nearby Oriole GO Station on the Richmond Hill line, but there has been consideration given to building a connection to TTC Leslie Station in the future as the platform at Oriole was recently moved further north to allow for it.
Additionally, three GO bus terminals are on the Yonge-University-Spadina subway line, at Finch, York Mills, and Yorkdale, and one is located on the Scarborough RT at Scarborough Centre.
All GO Train stations within the City of Toronto except Exhibition are adjacent to TTC bus routes, and Danforth, Exhibition, Bloor, and Long Branch stations are also on streetcar routes.
[edit] Connections elsewhere in the GTHA
Municipal transit systems outside Toronto remain purely bus-based to date. Buses operated by Durham Region Transit, York Region Transit, Brampton Transit, Mississauga Transit, Milton Transit, Oakville Transit, Burlington Transit and the Hamilton Street Railway connect with GO stations and stops in their respective jurisdictions.
York Region's Viva bus rapid transit system interchanges with the GO Train system at two stations. Viva Blue connects with Langstaff GO Station on the Richmond Hill line, and the peak-only Viva Pink connects with Unionville GO Station on the Stouffville line.
[edit] Ridership
GO runs 180 train trips and 1,430 bus trips daily, carrying about 190,000 passengers on a typical weekday — 160,000 on the trains and 30,000 by bus. GO says that their ridership growth has continually exceeded expectations. In 1967, the first year of operation, 2.5 million passengers were carried. The combined rail and bus system today handles more than 50 million riders annually[8], and GO Transit achieved its one billionth passenger mark on October 11, 2006.
At least 96% of the train ridership is to and from Union Station in downtown Toronto, while about 70% of all bus passengers travel to and from the City of Toronto.
Number of Passenger Trips (2006) [6] | |||
---|---|---|---|
Rail lines | |||
Lakeshore West | 13,561,100 | ||
Milton | 6,049,400 | ||
Georgetown | 3,821,300 | ||
Bradford | 2,310,200 | ||
Richmond Hill | 2,042,100 | ||
Stouffville | 2,675,000 | ||
Lakeshore East | 10,767,200 | ||
Subtotal - Rail lines | 41,226,300 | ||
Bus routes | |||
All GO Bus Service | 7,065,700 | ||
Total - GO System | 48,292,000 |
[edit] History
[edit] Creation of GO Transit
GO Transit was created and funded by the provincial government in 1967 as Government of Ontario Transit (hence the acronym 'GO') and was financed entirely by the Province of Ontario until the end of 1997. The Province subsidized any operating costs that were not recovered through revenue, as well as all capital costs. Responsibility for the system was then transferred to the Toronto Area Transportation Operating Authority (TATOA) and later to the Greater Toronto Services Board as part of the province's 'downloading' initiative, before finally returning to the province as a Crown Agency under Greater Toronto Transit Authority (GTTA).
GO began as a three-year experiment on May 23, 1967[9] running single-deck diesel multiple units on a single rail line along Lake Ontario's shoreline. All day GO Train service ran from Oakville to Pickering with limited rush hour train service to Hamilton. Lakeshore GO trains carried 2.5 million riders that first year and was considered to be a success. GO Bus service, which started out in 1970 as an extension of the original Lakeshore train line, has since become a full-fledged network in its own right. It feeds the rail service and serves communities that trains do not reach.
[edit] Expansion in the 1970s and 1980s
Expansion continued in the 1970s with the introduction of the Georgetown line in 1974 and the Richmond Hill line in 1978. Also in 1978 the GO Transit bi-level railcars were introduced, although many of the bi-level trains had to run with a single level cab car at first. Finally in 1979 the current GO Train concourse at Union Station was built.
The 1980s proved to be the most exciting time for GO Transit as in 1981 the Milton GO Train line opened. Then just one year later in 1982 the Bradford line and Stouffville line opened after the newly created VIA Rail Canada cut passenger rail service to these corridors.
[edit] Proposed GO ALRT System
Towards the end of 1982 came GO Transit's moment of truth, as the Ontario Minister of Transportation and Communications, James Snow, announced the launching GO ALRT, an interregional rapid transit program.[10] This is a transit system that would have allowed computer controlled trains to run at a maximum frequency of two minutes instead of the usual twenty minutes during rush hour. One line would have replaced the Lakeshore GO Train line and would have run from Hamilton to Oshawa. The other would have connected Oakville with downtown Mississauga, Pearson Airport, downtown North York and the Scarborough Town Centre before finally terminating at Pickering. A short lived third line would have run north-south connecting Brampton with Mississauga. The rail cars (designed by The Urban Transportation Development Corporation) started out as an ICTS train similar to the Scarborough RT later evolved in 1983 to the length of roughly a Toronto subway train. Further redesign in 1984/85 indicated that greater carrying capacity was going to be required resulting in cars similar in length to VIA's LRC coach car. Meanwhile Hamilton residents were strongly opposed to the plan which caused the proposal to go under in 1985 which was also a result of long time Ontario PC premier Bill Davis being replaced by the late Ontario PC leader Frank Miller who served only a few months in office.
With the end of GO ALRT and the creation of a coalition provincial government between the Ontario NDP and Ontario Liberals, it was decided that certain parts of the GO ALRT proposal would live on, in the form of a GO Train extension of all-day GO Train service to Whitby and Burlington. The tracks between Pickering and Whitby were originally built for the GO ALRT system but were soon converted to handle conventional GO Trains. All day GO Train service was brought to Whitby in 1988.
[edit] Reduction of service in the 1990s
In the 1990s, the era of continuous growth came to end. Ridership shrank as a result of a recession in the early part of the decade. In spite of this, GO extended limited rush hour GO Train service to Barrie, Guelph, Acton and Oshawa in 1990. In the same year, GO also introduced off-peak train service on the Milton line, much of which only operated as far west as Erindale. In May, 1992, while GO Transit celebrated its 25th birthday, all-day GO Train service was extended to Burlington with the building of a new station at Aldershot. However, in 1993 former Ontario premier Bob Rae announced the Social Contract, which would see a "temporary" reduction in spending on services. Consequentially GO Train service to Barrie, Guelph and Acton was eliminated. All day GO Train service to Whitby and Burlington was reduced to rush hours only (while limited rush hour train service to Oshawa and Hamilton remained in place). All day Lakeshore train service existed only between Pickering and Oakville. In 1995 a new set of tracks and a station were built in Oshawa, allowing for frequent rush hour GO Train service to Oshawa. In 1996, off-peak service ceased on the Milton line.
With the election of former Ontario premier Mike Harris in June 1995, plans for expanding GO Transit were put on hold as part of an overall reduction in government spending.
[edit] Shifting of responsibilities
In January 1997, the province announced it would hand over funding responsibility for GO Transit to the Greater Toronto Area municipalities (which consist of the City of Toronto, and the Regions of Halton, Peel, York, and Durham) and the neighbouring Region of Hamilton-Wentworth (which became the new City of Hamilton on 1 January 2001). In exchange, the province would assume certain other funding responsibilities from municipal governments.
A year later, on 1 January 1998, the GTA municipalities and Hamilton-Wentworth (now the city of Hamilton) began to fund GO Transit, cost-sharing all of GO's capital expenses and any operating costs that are not recovered through passenger fares and other revenue. On 1 January 1999, a new municipal agency created by the province came into being: the Greater Toronto Services Board (GTSB), composed of regional chairs, municipal mayors, and local councillors from the GTSB's service area. GO Transit transferred over to the municipal sector as an arm of the GTSB (Toronto Area Transit Operating Authority) on August 7, 1999, thus completing the process that had begun with the funding change of 1998.
In 2000, all day GO Train service was restored from Burlington to Whitby and finally brought to Oshawa (although weekend & holiday Lakeshore GO Train service would still only see service between Pickering and Oakville).
On September 27, 2001, Ontario Premier Mike Harris announced that the Provincial government would be taking back responsibility for GO Transit, and putting $3 billion into public transit in Ontario. For the practically impoverished GO, it was a welcome funding commitment.
The GO Transit Act, 2001 was passed by the Ontario Legislature on December 5, 2001. As of January 1, 2002, GO Transit is no longer the responsibility of the municipalities of the Greater Toronto Area and Hamilton. GO has returned to provincial responsibility as a Crown Corporation, and the Greater Toronto Services Board no longer exists.
[edit] Recent developments
On December 30, 2006, the GO Train service was fully restored along the Lakeshore East line to Oshawa, having service include weekends and holidays.
On September 4, 2007, much of the weekday train service on the Lakeshore West line was extended to Aldershot station, although many rush hour trains continue to originate and terminate at Burlington for the time being.
On October 28, 2007, GO Train service was fully restored along the Lakeshore West line to Aldershot, having service include weekends and holidays.
On December 17, 2007, the Bradford line was extended to Barrie South GO Station, restoring GO Train service to Barrie for the first time in 15 years.
On April 8, 2008, Run 151 on the Milton line saw the first revenue service for 12 car trains. Cab car 248 was in the lead with 605 pushing it by itself. Only two of six trips in both directions are scheduled to be operated with 12 car trains at this time.
On May 2, 2008, all trips on the Milton line were served with 12 car trains for the first time, and this is now permanent.
[edit] Future expansion
The majority of GO Transit expansion projects presently underway fall under the funding umbrella of the GO Transit Rail Improvement Plan, or GO TRIP. This initiative, though seen as substantial at the time of its initial proposition in the mid-2000s, has since been dwarfed by a further slate of new GO infrastructure proposed in MoveOntario 2020, the provincial transit plan announced in 2007.
[edit] GO TRIP
GO TRIP is a jointly-funded plan, with the federal, provincial, and municipal governments contributing to the costs on a one-third/one-third/one-third cost-sharing basis. Federal funding was committed by the then-Liberal federal government through their Canada Strategic Infrastructure Fund; since the election of Stephen Harper's Conservatives, there have been no further federal funding commitments for new infrastructure. Detailed information on these expansion projects can be found on the GO TRIP website.
GO TRIP's priority was augmenting the capacity and reliability of the existing GO rail network, but not substantively expanding the catchment area or adding new corridors. The majority of spending was allocated to reducing the interface between GO Trains and growing volumes of CP and CN freight traffic. This included rail-to-rail grade separations where GO's north-south lines cross east-west freight lines: the Snider Diamond, where the Barrie/Bradford line crosses the CN York Subdivision, saw an overpass completed in Fall 2007; work on the Hagerman Diamond (the Stouffville line's CN crossing) began in July 2006 and work at the West Toronto Diamond (to take the CN tracks on the Georgetown line under the CP's midtown Toronto tracks) began in November 2006.
Other capital projects included adding increased track capacity on the CN and CP-owned railway lines so that more GO Train trips would be possible. A third track from Burlington to Bayview Junction (between Aldershot and Hamilton) on the Lakeshore West line, and one from downtown Cherry Street to Scarborough on the Lakeshore East, were built to facilitate improved schedule reliability and increased service. New track is under construction on the Georgetown line's busy section between Brampton and northwest Toronto to allow more frequent train movements as well. Track upgrades on the Milton line to run more peak and off-peak trains were planned, but remain uninitiated. GO TRIP also attempted to curtail GO's need to move deadheaded trains back to its main Willowdale Yard in the evening and then out to the suburbs in the early morning by constructing train layover facilities at the periphery of its rail network. New train layover facilities were built in Milton, Barrie and near Mount Pleasant station, while plans to build one in downtown Hamilton have been stalled.
GO TRIP's one substantial extension of rail service involved restoring train trips to the Barrie, Ontario area, using trackage beyond the then-terminus of Bradford owned by the City of Barrie (who acquired the right of way following CN's abandonment.) Two new infill stations were built as well: Lisgar Station on the Milton line opened in 2007, and though construction of the Mount Pleasant Station on the Georgetown line (Bovaird Drive and Creditview Road) continues, the station has been open for service since February 2005. Current work is to make the station wheelchair accessible and to add an extra track, allowing more service. At existing stations, passenger capacity was increased, primarily by expanding parking. Plans for decked parking at Ajax, Aurora, Burlington, Centennial, Clarkson, Erindale, Oakville, Unionville and Whitby stations have been drafted, though none has been built. Platforms on Lakeshore and Milton corridor stations were lengthened to permit 12-car train sets in 2008.
Finally, construction is underway on a new GO Station, at 10th Line and Bethesda Road in Stouffville-Whitchurch, to be named Lincolnville GO Station, where the current layover facility is located. Opening is estimated for June, 2008.
[edit] Other expansion initiatives
Improvements to Union Station's platforms, train shed and signalling system, has been an ongoing process for GO Transit. A major redevelopment plan involving the station's owner, the City of Toronto, has been developed but awaits private capital. Fleet expansion is also ongoing, including buses and Bombardier Bi-Level Rail Cars, and the replacement of old locomotives with more reliable and powerful models. GO will be a key user of the Presto Card, a unified smartcard-based payment system for the entire Greater Toronto and Hamilton Area similar to the Octopus Card used in Hong Kong.
GO is also developing a bus rapid transit (BRT) system that will provide extensive east-to-west express service across the GTA, using transit priority measures and park-and-ride stations with links to local transit. GO's already popular Highway 407 express buses, launched in the fall of 2000, are the BRT's precursor, showing that demand for such service is already there. It has grown and flourished, with greatly improved services and new park & ride lots. The GO 407 service is now one of GO Transit's fastest growing services, yielding 12,000 rides on a typical day. As part of this service, GO Transit is collaborating with the City of Mississauga to build new, exclusive bus lanes along Highway 403. Mississauga's BRT website has more information on this new project.
[edit] MoveOntario 2020
MoveOntario 2020 was announced by Dalton McGuinty in the leadup to the 2007 provincial election as a provincially-initiated transit plan for the Greater Toronto and Hamilton Area. Unlike previous plans, there is to be no expectations of municipal contributions for capital costs, with a two-thirds/one-third funding arrangement between the province and the federal government foreseen. As of the 2008 federal budget, however, there have been no federal monies committed to MoveOntario 2020 project.
Of the estimated $17.5 billion worth of projects, a significant portion are to involve GO expansion. These include a number of new train corridors.
[edit] Proposed train routes
[edit] Bolton line
This line would follow a CP rail line from Union Station through western Toronto and Woodbridge to the suburban community of Bolton, replacing a bus service that currently encompasses two inbound and two outbound trips. Because of a rapidly growing population in the area and stronger transit connections that have been developed in last few years between Brampton and Vaughan, it is quite likely that train service on this route will be introduced within the next few years.
[edit] Seaton line
This line would use CP's Belleville subdivision to run from Toronto through northern Scarborough and east to Brock Road in Pickering. The line would likely be introduced after futher development of the Seaton new town in Pickering. GO Trains originating at Union might reach the Belleville subdivision by potentially using disused CP Trackage in the lower Don Valley or by following the existing Stouffville line then shifting onto Belleville subdivision trackage via a new connection structure near Kennedy and Sheppard. Alternately, trains might originate along the Midtown Corridor (see below).
[edit] North Pickering line
This line, like the Seaton line, would use CP's Belleville subdivision, then branch at the Agincourt yard onto CP's Havelock subdivision and continue northeast to Brock Road in the small community of Claremont, within the city of Pickering. This line would serve the growing community of Cornell in Markham, as well as the established Morningside Heights subdivision in Toronto; a potential primary purpose of the line would be to serve the proposed Pickering International Airport, set to open sometime after 2012.
Although it was not been proposed in MoveOntario 2020, it is possible that trains on this line may eventually run to Peterborough, as the growing city has previously stated that it only wants GO service if it is by train.
[edit] Midtown Corridor
MoveOntario 2020 also proposes adding passenger service on the CP freight mainline that cuts through Toronto to the north of the downtown area. The midtown corridor runs from the Junction (intersection of many CN and CP lines, as well as the GO Georgetown and Milton routes) to the Don Valley. Service could involve an extension of the Seaton and North Pickering routes westward, or a combination of trains from the Georgetown and Milton lines. Passenger service would need to be restored to the former North Toronto Station on Yonge Street, or a new station would likely be built adjacent to the Dupont TTC Station at Spadina Road.
While this proposal would take pressure off of Union Station, it faces many roadblocks. Canadian Pacific has not been very willing to operate GO trains on its tracks, and this line would use its most congested route, the mainline. Also, the proposed transfer points to the Yonge-University-Spadina subway are disadvantageous. Passengers transferring at Union Station are moving "counterflow" and take advantage of some rare rush-hour spare capacity on the line, whereas the new station would only add to the growing congestion on the Yonge and University segments.
[edit] Pearson rail connection
MoveOntario 2020 re-proposes to provide train service between the Pearson Airport and Union Station via the Georgetown line. Because the Airport is located some 5 km from the line, a proposed spur line would need to be constructed to connect the trains to the LINK Train currently serving the terminal facilities. It is uncertain how this service would be coordinated with GO Transit, which uses the same Georgetown line. Extensive track upgrades along this line would be required.
A controversial proposal to provide a high-speed rail link on this corridor was announced as a transportation priority by the previous federal Liberal government in 2000, and a contract to build Bombardier diesel cars for this purpose was awarded in 2003, with the expectation of project completion by 2008. This line was to be operated by a private operator and named "Blue22," for the number of minutes the trip would take between Pearson and Downtown. The project was opposed by residents in places like Weston and its future is presently unclear.
Despite the absence of train service, GO has expanded its bus routes to the Airport, adding a GO bus service on April 26, 2008. This bus operates at 1/2 hour intervals, 21 hours a day from Pearson on a route that goes between its Square One Bus Terminal in Mississauga and theRichmond Hill Centre Terminal at Hwy. 7 & Yonge St. with connections there to the Viva (bus rapid transit) network, which operates in York Region north of Toronto.
[edit] Expansions beyond GO's present service area
Although not provided for in MoveOntario 2020, previous government announcements and proposals have foreseen expanding GO's service area as follows:
- Introducing commuter bus services to Niagara Region, and to Waterloo Region to build the market for train service. Both Waterloo and Niagara regional governments are strongly in favour of GO Trains service being brought to these areas. Service expansion to Peterborough has also been proposed, but GO has expressed no interest in providing it. The City of Peterborough is also strongly in favour of having GO service there, but only by rail. The federal government announced funding for a commuter train route to Peterborough in its 2008 budget, but it is uncertain who will operate it. Neither GO Transit nor VIA Rail, which is owned by the federal government, have expressed any interest.
- In the Fall of 2007, GO Transit added a new Bus service between the University of Guelph and Cooksville, with additional stops at Aberfoyle and Square One. Additionally, the Highway 407 express route servicing the Meadowvale and Bramalea GO stations and York University was extended to the University of Guelph. A new park and ride facility will also be built in Aberfoyle at Brock and McLean roads near the 401. [1]
- Beginning June 28, 2008, train-meet service will be added between Burlington and Stoney Creek[citation needed].
Theoretically, GO Transit can serve any region in Ontario and set up service in other areas as well, as it is a provincial agency; however, there is no real market for inter-regional service in other regions (such as in/near the larger cities in Southwestern Ontario and in the National Capital Region) that is not provided by private agencies or VIA Rail.
[edit] Recent service disruptions
In recent years, since initiating a major infrastructure renewal program in 2005, GO Transit has been plagued with frequent service disruptions, often leading to trip cancellations, and stranding passengers at GO stations. In addition to several major service disruptions, GO trains also routinely arrive at their destinations late. GO has blamed many of the disruptions on long-delayed construction projects it has recently undertaken. It cites underfunding by previous Ontario governments for delaying critical infrastructure improvements necessary to handle GO's growing passenger volumes. Passengers though, are more likely to fault GO directly, alleging that the agency shows little concern for their schedules, and fails to provide accurate information when major delays occur and be accountable for frequently delayed and cancelled train rides with no compensation.
On Monday February 11 2008, rider Patricia Eales launched an online petition demanding better service and rebates to compensate riders for delays and cancellations. The petition was presented to the Board of Directors at their monthly meeting on Friday, March 14, 2008; while Eales' request for rebates was declined, her deputation did lead to the creation of a Customer Service Committee, which is currently being started by GO Transit.
[edit] Vehicles
Vehicles: 328 buses, 52 locomotives, 394 coaches, of which 49 are cabcars (2008)
[edit] Locomotives
[edit] Retired engines
Year | Manufacturer | Model | Numbers | Notes |
---|---|---|---|---|
General Motors Diesel Division EMD | FP7A & F7B locomotives | used as power cars | ||
General Motors Diesel Division | GP40TC locomotive | |||
General Motors Diesel Division | GP40-2L locomotive | |||
General Motors Division | F40PH locomotive | |||
General Motors Diesel Division | GP40U locomotive | |||
1990 | EMD | F59PH IV | 565-568 | Sold to Trinity Railway Express in Irving, Texas, USA. |
[edit] Active engines
All F59PH locomotives operated by GO Transit have been manufactured by EMD in London, Ontario.
All MP40PH-3C locomotives operated by GO Transit have been manufactured by Wabtec MotivePower Industries in Boise, Idaho.
Year | Manufacturer | Model | Numbers | Notes |
---|---|---|---|---|
1988 | EMD | F59PH I | 520-535 | |
1989-1990 | EMD | F59PH II | 536-547 | |
1990 | EMD | F59PH III | 548-561 | |
1990 | EMD | F59PH IV | 562-564 | |
2007-2008 | MPI | MP40PH-3C | 601-608 | |
600, 609-627 | Undergoing building or testing |
Notes:
- The first 27 engines received by Motive Power will be used on the Milton line, and in Express Service on the Lakeshore lines. (Source on page 3)
- GO Transit's 45-engine F59PH roster will possibly be sold to Minnesota's proposed Northstar Corridor Commuter Rail Service that will start in 2009. (Source on page 6)
[edit] Multiple units
Year | Manufacturer | Model | Numbers | Notes |
---|---|---|---|---|
1967 | Hawker Siddeley Canada | RTC-85/85C SP (Single-level self-propel unit) | retired MU were manufactured at the HS transit shops in Thunder Bay, Ontario, now owned by Bombardier Transportation Limited |
[edit] Coaches
Manufacturer | Model | Numbers | Notes | |
---|---|---|---|---|
HSC | Bi-Level I coach | 2002-2079 | No | |
HSC | Bi-Level II coach | 2100-2155, 200-214 | No | |
UTDC | Bi-Level III coach | 2200-2253, 215-222 | No | |
UTDC | Bi-Level IV coach | 2300-2341, 225-241 | No | |
Bombardier Transportation | Bi-Level V coach | 2400-2455, 2499 | No | |
Bombardier Transportation | Bi-Level VI coach | 2500-2521 | No | |
Bombardier Transportation | Bi-Level VII coach | 2522-2544, 2600-2661, 242-250 | Yes | |
Bombardier Transportation | Bi-Level coach | No | leased from Tri-Rail | |
Bombardier Transportation | Bi-Level coach | leased from West Coast Express | ||
Pullman-Standard | Bi-level coaches | No | leased from CPR Montreal commuter rail service (1974) and CN&W (1976) |
[edit] Buses
GM buses were manufactured at the Diesel Division in London, Ontario and Orion/Ontario Bus buses in Mississauga, Ontario:
[edit] Retired
Year | Make | Model | Length | Engine | Numbers | |
---|---|---|---|---|---|---|
1970 | GMDD | T8H-5305A | 40 ft (12.2 m) | No | Detroit Diesel 8V71 | 1000-1019 |
1973 | GMDD | T8H-5307A | 40 ft (12.2 m) | No | Detroit Diesel 8V71 | 1020-1029 |
1974 | GMDD | T8H-5307A | 40 ft (12.2 m) | No | Detroit Diesel 8V71 | 1030-1039, 1120-1123 |
1975 | GMDD | T8H-5307A | 40 ft (12.2 m) | No | Detroit Diesel 8V71 | 1045-1056 |
1976 | GMDD | S8H-5304A | 40 ft (12.2 m) | No | Detroit Diesel 8V71 | 1060-1099 |
1977 | GMDD | T8H-5307A | 40 ft (12.2 m) | No | Detroit Diesel 8V71 | 1100-1119 |
1985 | Ontario Bus | Orion I 01.508 | 40 ft (12.2 m) | No | Detroit Diesel 6V92TA | 1125-1129 |
1987 | Ontario Bus | Orion I 01.508 | 40 ft (12.2 m) | No | Detroit Diesel 6V92TA | 1130-1141 |
2000 | Orion Bus | Orion V 05.501 | 40 ft (12.2 m) | Yes | Detroit Diesel S50 | 1150-1163 |
2002 | Orion Bus | Orion V 05.501 | 40 ft (12.2 m) | Yes | Detroit Diesel S50 | 1164-1173 |
1975 | MCI | MC-8 | 40 ft (12.2 m) | No | Detroit Diesel 8V71 | 1250-1262 |
1978 | MCI | MC-8 | 40 ft (12.2 m) | No | Detroit Diesel 8V71 | 1270-1281 |
1980 | MCI | MC-9 | 40 ft (12.2 m) | No | Detroit Diesel 8V71 | 1290-1294 |
1981 | MCI | MC-9 | 40 ft (12.2 m) | No | Detroit Diesel 8V71 | 1300-1324 |
1986 | MCI | 102A2 | 40 ft (12.2 m) | No | Detroit Diesel 6V92TA | 1400-1416 |
1987 | MCI | 102A2 | 40 ft (12.2 m) | No | Detroit Diesel 6V92TA | 1417-1425 |
1988 | MCI | 102A2 | 40 ft (12.2 m) | No | Detroit Diesel 6V92TA | 1426-1435 |
1989 | MCI | 102A2 | 40 ft (12.2 m) | No | Detroit Diesel 6V92TA | 1436-1445 |
1990 | MCI | 102A2 | 40 ft (12.2 m) | No | Detroit Diesel 6V92TA | 1446-1458 |
1991 | MCI | 102A2 | 40 ft (12.2 m) | No | Detroit Diesel 6V92TA | 1459-1468 |
1990 | MCI | 102A3 | 40 ft (12.2 m) | No | Detroit Diesel 6V92TA | 1500-1514 |
1993 | MCI | 102C3 | 40 ft (12.2 m) | No | Cummins L10 | 1520-1531 |
1991 | New Flyer | D40S | 40 ft (12.2 m) | No | Detroit Diesel 6V92TA | 1900-1950 |
[edit] Active
GO Transit MCI D4500 2109 at York University |
Year | Make | Model | Length | Engine | Numbers | |
---|---|---|---|---|---|---|
1999 | Prevost | XL LeMirage | 40 ft (12.2 m) | Yes | Detroit Diesel Series 60 | 1600-1619 |
2000 | Orion | V 05.501 | 40.71 ft (12.41 m)[11] | Yes | Detroit Diesel Series 50 | 2000-2007 |
2001 | Orion | V 05.501 | 40.71 ft (12.41 m) | Yes | Detroit Diesel Series 50 | 2008-2017 |
2001 | MCI | D4500 | 45.42 ft (13.84 m)[12] | Yes | Detroit Diesel Series 60 | 2100-2113 |
2002 | MCI | D4500 | 45.42 ft (13.84 m) | Yes | Detroit Diesel Series 60 | 2114-2148 |
2003 | MCI | D4500 | 45.42 ft (13.84 m) | Yes | Detroit Diesel Series 60 | 2149-2184 |
2004 | MCI | D4500 | 45.42 ft (13.84 m) | Yes | Detroit Diesel Series 60 | 2185-2215 |
2004 | Orion | V 05.501 | 40.71 ft (12.41 m) | Yes | Detroit Diesel Series 50 | 2018-2029 |
2004 | MCI | D4500 | 45.42 ft (13.84 m) | Yes | Caterpillar Adam III C13 | 2216-2266 |
2005 | MCI | D4500 | 45.42 ft (13.84 m) | Yes | Caterpillar Adam III C13 | 2267-2286 |
2006 | MCI | D4500 | 45.42 ft (13.84 m) | Yes | Caterpillar Adam III C13 | 2287-2317 |
2007 | MCI | D4500 | 45.42 ft (13.84 m) | Yes | Caterpillar Adam III C13 | 2318-2353 |
2008 | Alexander Dennis | Enviro 500 | 42 ft (12.8 m) | Yes | Cummins Celect | 8000-8011 |
2008 | MCI | D4500 | 45.42 ft (13.84 m) | Yes | Caterpillar Adam III C13 | 2354-2365 |
[edit] Staff
GO has a workforce of 1,447. (2007)[13] All staff are employees of GO Transit with the exception of conductors and engineers on trains, who are contracted from Canadian National Railway and Canadian Pacific Railway, and train maintenance personnel, who are employees of Bombardier Transportation under contract. Unionized staff are part of Amalgamated Transit Union Local 1587, and the International Association of Machinists and Aerospace Workers Local 235, and generally based in Toronto. Train crewing on all lines currently crewed by CN is to be taken over by Bombardier Transportation beginning in June, 2008.
[edit] Special Constables
GO Transit has Special Constables patrolling the transit agencies' properties and vehicles. As well as enforcing the Criminal Code and related violations of GO Transit By-law # 2. They are also known as Transit Enforcement Officers. The GO Transit Special Constables are appointed by the Ontario Provincial Police and have police authority for a variety of federal and provincial acts. These officers patrol the GO system and can arrest and enforce a variety of laws. Their authority is essentially no different than that of a police officer during certain situations. Jurisdictional police are actively involved in the safety and security of the GO system and work together with GO Special Constables. GO Transit also operates on railway tracks owned by CN and CP Rail. Railway police (CN or CP) also assist GO Special Constables in the security and safety of the GO system. GO Transit also employs Provincial Offences Officers (internally known as Customer Attendants) to enforce and assist with the proof of payment system. They are not to be confused with a GO Special Constable.
[edit] Contractors
- Bombardier Transportation - Responsible for GO Train maintenance.
- Gray Coach Lines - defunct
- Travelways
- Charterways Transportation Limited
- Penetang-Midland Coach Lines (PMCL)
- CN engineers and conductors operate all GO Trains excluding those operated on Milton line.
- CP engineers and conductors operate GO Trains on Milton line only.
- Exclusive Advertising - Represents 3,950 interior poster faces and 790 digital displays throughout the GO Train fleet.
[edit] Terminals
GO Bus service uses 15 bus terminals, with numerous intermediate stops and ticket agencies, in addition to providing off-peak and express services to GO Train stations. [6] The terminals have a wide range of owner/operator/user relationships; GO owned facility with exclusive use or shared with local service; municipal transit operation shared by GO; intercity terminal shared with Greyhound, Coach Canada, etc. During the school year there are also thousands of rides a day to the York University Bus Loop, one of the biggest transit hubs in the GTA. [14]
- Ajax Bus Terminal
- Barrie Bus Terminal
- Bramalea City Centre Terminal
- Brampton Bus Terminal
- Finch Bus Terminal - former GO York Region Terminal
- Guelph Bus Terminal
- McMaster University Bus Terminal
- Newmarket Bus Terminal
- Oshawa Bus Terminal
- Richmond Hill Centre Terminal
- Scarborough Centre Bus Terminal
- Square One Bus Terminal
- Union Station Bus Terminal
- Yorkdale Bus Terminal
- York Mills Bus Terminal
[edit] Facilities
- GO Transit Willowbrook Yard- covering 17 hectares of land and 13,000 m² of workshops.
- Don Yard, a layover facility for trains. Formerly, CNR Don Sorting Yard.
- North Bathurst Yard 1987 - a layover facility for trains. Formerly CN
- Georgetown, a layover facility for trains.
- Milton, a layover yard for trains.
- Stouffville, a layover facility for trains.
- Steeprock Bus Garage 1979 - stores 130 buses, 70 bus staging areas, 20 bus repair bays.
- West Region Office- Wolfedale (Mississauga)
- East Region Office - Middlefield Road and McCowan Road
- GO Buses are also stored and serviced in Bramalea, Guelph, Beaverton, Milton, Oshawa, Ajax, Oakville, Barrie, Caledon, Bowmanville and Hamilton.
[edit] References
- ^ Metrolinx About Us
- ^ Metrolinx Initiatives
- ^ GO TRANSIT Public Schedule: Milton to Toronto
- ^ GO TRANSIT Public Schedule: Toronto to Milton
- ^ GO deal swaps CN crews with Bombardier personnel, Toronto Star Nov 09, 2007
- ^ a b c GO Transit, the year in review 2006-07
- ^ a b c Pearce, Sean. "Stacking the deck for transit service", Markham Economist and Sun, 9 April 2008. Retrieved on 2008-04-11.
- ^ GO Transit celebrates 50 million riders
- ^ GO celebrates 40 years of success
- ^ Drost, Peter (2006-11-10). The GO-ALRT Program. Transit Toronto. Retrieved on 2007-07-21.
- ^ Orion V, Technical Specifications
- ^ MCI Commuter Coach Dimensions
- ^ Wyatt, David A.. History of Regional Transit in Toronto, Ontario. Retrieved on 2007-07-21.
- ^ GO 407's one millionth rider at York University
- Burnet, R. G.. Significant Dates in GO Transit. Retrieved on 2007-07-21.
- Sergeant, Wilfred (2004). Building GO-Transit: The Rail Commuter Initiative of The Government of Ontario & Canadian National Railways, People in the project 1965-1969. HTA PRESS.
[edit] External links
- GO Transit
- GO Transit Rail Improvement Program (GO TRIP)
- Amalgamated Transit Union Local 1587
- FindTheWay.ca
- Exclusive Advertising (representing GO Train interior advertising)
- Drawings and photos of GO Transit buses
|
|
|
|