The Galloway hydro-electric power scheme is a network of dams and hydro-electric power stations in Galloway, south west Scotland. It was built between 1930 and 1936.

The generating stations draw water from the River Ken, River Dee and River Doon through reservoirs at Loch Doon, Kendoon, Carsfad, Clatteringshaws, and Tongland. The unusual modernist stations were designed by Scottish civil engineer, Sir Alexander Gibb.

The scheme, which is today operated by Scottish Power, can produce a total peak power of around 106 megawatts.

Contents

[edit] History

The scheme was authorized by the Galloway Water Power Act on 10 May 1929, by which the Galloway Water Power Company was incorporated. Chairman of the board was former colonial administrator Lord Meston. Also on the board was Robert Brand, managing director of the project's underwriter, Lazard Brothers and Company.

Design was carried out by William McLellan of Merz & McLellan. Construction began three years later in 1932 and was completed in 1936. The scheme was made viable by the recent formation of the National Grid which made generation of electricity in remote areas useful. Hydro power was particularly helpful to this grid because of its ability to be turned on and off very quickly to meet peak demands (in contrast to oil and coal stations), and to meet the natural increase during the more energy demanding winter months.

The total cost of the scheme was around three million pounds. At a cost of £29 per kilowatt of installed capacity, they were some of the least costly stations ever built in the UK.[1]

The scheme was extended in 1984 with the addition of the Drumjohn power station which made use of the existing needle valve where the water from Loch Doon and the Deuch feed into the Dee. This station has a capacity of just 2.3 megawatts, but was constructed largely using existing infrastructure.

[edit] Architecture

Tongland turbine hall
Tongland turbine hall

The stations are generally white, Modernist structures, highly glazed and with large airy turbine halls. The designs were stylistically advanced for their time and can be viewed as some of Scotland's earliest Modern buildings. The credit for the design is given to Alexander Gibb and Partners however is seems likely that the design received input from H. O. Tarbolton, the architectural advisor to the scheme's 'Amenities Committee'. This Committee was set up to "make to the Company such recommendations as they may think are reasonable and proper for the preservation ot the beauty of the scenery" (from the 1929 Galloway water power act). Tarbolton was designer of the Pitlochry power station which bears some striking similarities to the Galloway turbine halls. Whilst no direct credit for the design work can be given to him, it is unlikely that he had no influence on the outcome.

In their book 'Power from water' (1960), two partners of Alexander Gibb and Partners , A.O.L. Paton, and J Guthrie Brown (the latter of whom is known to have worked on the Galloway scheme) write that "The architecture of the power stations, under the watchful eye of the amenity committee...was given the most careful attention."

The buildings are now listed.

In great contrast to the bright pristine nature of the stations, the dams are organic and entwined with the natural rock. They are generally arch dams, curved in plan, bearing onto the side walls of the valleys except in those dams where only one side of the valley is suitable for bearing. In these latter cases, the end of the dam straightens out, and the last section of gravity dam (where the weight of the dam itself resists the force of the water) then acts like a buttress to the more efficient arch dam.

[edit] Perceptions of the scheme

Today the dams are well liked and a source of pride to the people of Galloway and of course are still generating environmentally friendly electricity. However they were not universally admired when they were first built, as local poet W.G.M. Dobie wrote:

This is our land of Galloway
Where in a more heroic day
The Bruce contrived to trap and slay
An army of invaders
Where Patrick Heron, Silver Sand
May Maxwell and the Smuggler band
Adventured as by Crockett's hand
Is Written in The Raiders

A raider comes today who kills
The glories of our glens and hills
With unheroic acts and bills
and "Private Legislation"
The Company promoters pen
Will Dam the Deugh and dam the Ken
and Dam the Dee - oh Dam the men
Who Plan such desecration!


[edit] Generating stations

The six generating stations, from north to south, are:

Name Year completed Output Location Head[1]
Drumjohn 1985 2 MW 55°14′54″N, 4°19′35″W
Kendoon 1936 24 MW 55°09′48″N, 4°11′28″W 150 feet
Carsfad 1936 12 MW 55°08′38″N, 4°11′25″W 65 feet
Earlstoun 1936 14 MW 55°06′38″N, 4°10′31″W 67 feet
Glenlee 1935 24 MW 55°05′57″N, 4°11′11″W 380 feet
Tongland 1935 33 MW 54°51′36″N, 4°02′02″W 106 feet