Fowler Ridge Wind Farm
From Wikipedia, the free encyclopedia
This article or section contains information about a planned or proposed power plant, or power plant under construction. It may contain information of a speculative nature and the content may change as the construction and/or completion of the power plant approaches, and more information becomes available. |
The Fowler Ridge Wind Farm is currently under construction in Benton County, Indiana, around 90 miles northwest of Indianapolis. The wind farm will be completed in two phases and will have a maximum generating capacity of 750 MW total. The first phase of the project, consisting of 222 wind turbines, 182 Vestas V82-1.65MW turbines and 40 Clipper C-96 2.5MW[1] turbines, will bring the first 400 MW on-line by the end of 2008. Phase 2 (350 MW) could begin in early 2009.[2]