Florida State Road 56

From Wikipedia, the free encyclopedia

State Road 56
Length: 2.7 mi (4.3 km)
West end: SR/CR 54 near Land O' Lakes
Major
junctions:
I-75 near Land O' Lakes
East end: SR/CR 581 in Wesley Chapel
Florida State and County Roads
< SR 55 SR 57 >

State Road 56 is a six lane highway three miles in length that runs from Bruce B. Downs Boulevard in Southern Wesley Chapel in the east to State Road 54 in Land O' Lakes in the west. It was opened on March 28, 2002 after a construction period spanning 3 years. It allows direct access to Interstate 75 two miles north of the northern terminus of Interstate 275.

[edit] Future expansion

An extension to US 301 in Zephyrhills is being planned by the Florida Department of Transportation, and has been part of the plan since the highway's conception.[1] The first phase of expansion has already started as of March 2008 to mark the imminent opening of the Shops at Wiregrass. [2]

[edit] Sources