[edit] 1970s
- 1972
- Royal Air Force (RAF) issues Air Staff Target 396 (AST-396), a requirement for a STOVL aircraft to replace the Harrier and Jaguar fleets.
- AST-403, specification revised for an air superiority fighter. STOVL requirement dropped and AST-409 lead to the development of Harrier GR5.[1]
- Mid-1970s
- France, Germany and UK initiate the European Combat Aircraft programme (ECA).
- 1979
- Following differing requirements (particularly French requirement for carrier compatibility,) BAe and MBB propose the European Combat Fighter (ECF)
[edit] 1980s
- 1981
- Development of different national prototypes and continued differences over specification lead to cancellation of ECF programme.
- Panavia partners (Germany, Italy and UK) launch Agile Combat Aircraft (ACA) programme. Following failure of Germany and Italy to fund development the UK MoD pays £80m prototype, the Experimental Aircraft Programme (EAP).
- 1983
- May - Contract for production of EAP prototype signed.
- The UK, France, Germany, Italy and Spain launch Future European Fighter Aircraft (F/EFA) programme. Aircraft to have Short Take Off and Landing (STOL) and Beyond Visual Range (BVR) capabilities.
- 1984
- France reiterates requirement for carrier capable version. The UK, Germany and Italy opt out and establish new EFA programme.
- 1985
- France officially withdraws, commences ACX project.
- October 27 - EAP demonstrator rolled out at BAe Warton.
- 1986
- June - Eurofighter GmbH established.
- August 8 - EAP makes its first flight. Configuration closely matches final Eurofighter design.
- Rolls-Royce, MTU Aero Engines, FiatAvio (now Avio) and ITP form EuroJet Turbo GmbH for development of EJ200.
- 1988
- November 23 - Contracts signed for production of demonstrator engines and airframes.
[edit] 1990s
- 1990
- EuroRADAR formed for development of ECR-90 (CAPTOR) radar (right).
- 1991
- May 1 - Last flight of EAP demonstrator.
- 1992
- EuroDASS formed for development of Defensive Aids Sub System (DASS.) Initially only UK and Italy participate. When Eurofighter enters service only RAF aircraft will exploit all capabilities of DASS.
- July - Germany announces intention to withdraw from the DASS element. Negotiations begin to reduce costs. As a single engine aircraft is ruled out Germany decides to fit cheaper systems, e.g., F/A-18's APG-65 in place of ECR-90, and delay its service entry by two years. Germany eventually participates in all systems.
- December - Renamed Eurofighter 2000.
- 1994
- 1995
- June 4 - Maiden flight of Italian DA3, the first with EJ200 engines.
- 1996
- August 31 - Spanish DA6 becomes the first two-seater to fly.
- 1997
- January 27 - First flight of DA7 from Turin.
- February 24 - Maiden flight of German DA5, first aircraft to be fitted with ECR-90.
- March 14 - Maiden flight of UK's DA4, the second two-seater and last of the seven development aircraft.
- 1998
- January - First aerial refuelling trials, involving DA2 and an RAF VC10 tanker.
- January 30 - NETMA and Eurofighter GmbH sign production and support contracts for 620 aircraft.
- September - Typhoon name adopted, announced as strictly for export contracts. There is some controversy as the last aircraft to bear the name was the Hawker Typhoon, a World War II aircraft.[2]
- December 18 - Tranche 1 contract signed.
- 1999
- Eurofighter International established as single contracting/management company to handle all export sales.
[edit] 2000s
- 2000
- March 8 - First export sale, 60 ordered and 30 options by Greece (but delayed, maybe cancelled).
- May 16 - UK commits to MBDA Meteor BVRAAM, leading to significant benefits for export prospects.
- July 7 - DA2 emerges from ten month stand down with latest avionics. Finished in black (see below) to reduce cosmetic effect of 490 pressure transducers applied to airframe.
- 2002
- April 5 - Instrumented Production Aircraft (IPA2) makes maiden flight from Turin.
- April 11 - IPA 3 makes maiden flight from EADS Military Aircraft, Manching, Germany.
- April 15 - IPA 1 makes maiden flight from BAE Warton.
- July 2 - Austria announces acquisition of 24 Typhoon's, later reduced to 18.
- July 23 - "Typhoon" name officially adopted as in-service name by four partner nations.
- November 21 - DA6, flying out of Getafe crashes. Twin engine failure is blamed. .[3]
- 2003
- February 13 - First Series Production Aircraft, GT001 flies from Manching. This is the first of Germany's 180 aircraft.
- February 14 - In the space of just over an hour Italy's IT001 and Britain's BT001 make their maiden flights.
- February 17 - Spain's ST001 flies from EADS Military Aircraft, Getafe, Spain.
- June 30 - "Type Acceptance" signed, marking formal delivery of aircraft to the partner nations.
- October - Integration of Meteor begins
- 2004
- June 27 - Two RAF Typhoon T1s depart UK for Singapore for marketing and training
- December 15 - UK confirms purchase of second batch of 89 aircraft, the last nation to commit to "Tranche 2" production of 236 aircraft.
- 2005
- April - Singapore drops the Typhoon from its shortlist to supply the country's next generation fighter.
- December 16 - The Aeronautica Militare Italiana (Italian Air Force) declares the Typhoon's Initial Operational Capability and sets it on Quick Reaction Alert from Grosseto Air Base.
- December 21 - Saudi Arabia agrees a purchase of an unspecified number of Typhoons with the UK Ministry of Defence.
- 2006
- January - First AMI operational squadron formed
- February - First operational mission undertaken by the Italian Air Force as Eurofighter Typhoon defends the airspace over Turin during the 2006 Winter Olympics
- March 31 - First RAF operational squadron formed [4]
- August 18 - Announcement of Saudi Arabia signing a contract to buy 72 planes from the UK. [5]
- October 03 - 100th production aircraft delivered. [6]
- 2007
- 2008
- January 16 - The first Tranche 2 Eurofighter Typhoon has made its first flight. [8]
[edit] References
- ^ http://www.flug-revue.rotor.com/FRHeft7X/FRHeft79/FRH7906/FR7906b.htm AST-403: ENGLANDS KAMPFFLUGZEUG-PROJEKT
- ^ "Storm over 'Typhoon' name for Eurofighter", BBC News, 1998-09-02. Retrieved on 2006-10-28.
- ^ "Eurofighter crashes in Spain", BBC News, 2002-11-21. Retrieved on 2006-10-26.
- ^ "Formation of first operational Typhoon squadron ushers in new era for the RAF", www.raf.mod.uk, Royal Air Force, 2006-03-31. Retrieved on 2006-10-26.
- ^ "Saudi Arabia buys 72 Eurofighters", BBC News, 2006-08-18. Retrieved on 2006-10-26.
- ^ "100th Typhoon arrives at RAF Coningsby", www.raf.mod.uk, Royal Air Force, 2006-10-09. Retrieved on 2006-10-26.
- ^ "Eurofighter Typhoon Delivered To Five Nations", www.eurofighter.at, Eurofighter GmbH, 2007-07-12. Retrieved on 2008-04-12.
- ^ "First Tranche 2 Eurofighter Typhoon Has Flown", http://www.eurofighter.com, Eurofighter GMBH, 2007-01-16. Retrieved on 2007-01-16.