Eridge railway station
From Wikipedia, the free encyclopedia
Eridge | |||
Location | |||
---|---|---|---|
Place | Eridge | ||
Local authority | Wealden | ||
Operations | |||
Station code | ERI | ||
Managed by | Southern | ||
Platforms in use | 1 (soon to be 3) | ||
Live departures and station information from National Rail | |||
Annual Rail Passenger Usage | |||
2004/05 * | 35,428 | ||
2005/06 * | 60,839 | ||
History | |||
Key dates | Opened 3 August 1868 | ||
National Rail - UK railway stations | |||
* Annual passenger usage based on sales of tickets in stated financial year(s) which end or originate at Eridge from Office of Rail Regulation statistics. | |||
|
Eridge railway station serves a rural district around Eridge in East Sussex. Train services from the station are provided by Southern, and the station is on the Uckfield branch of the Oxted Line. There are good opportunities for walks from the station into the High Weald.
The station has a small car park (charges Monday - Saturday), and there is a pub outside the station entrance.
Contents |
[edit] Services
The typical off-peak service is one train per hour to London Bridge, and one train per hour to Uckfield.
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
Ashurst | Southern Oxted Line Uckfield branch |
Crowborough |
[edit] History
At the time the station was opened, there was no village of Eridge, the station being named after nearby Eridge Park, seat of the Earls of Abergavenny.
The station used to be a junction for services running towards Tonbridge via Tunbridge Wells West (closed 1985). The line remains in situ and is connected to the Spa Valley Railway, a preserved railway company currently operating passenger services from Tunbridge Wells West to Birchden. The Spa Valley Railway plan to run services in late 2008, or early 2009.
There is also a campaign, by the Wealden Line to attempt to re-open the railway between Uckfield and Lewes as a part of the National Rail network.
Eridge was also the station where Cuckoo Line services towards Eastbourne diverged from the Uckfield and Lewes line. The lines diverged a short distance south of the station, at Redgate Mill Junction, but the Eastbourne line was closed in the 1960s.
[edit] Future
August Bank Holiday is the delivery date for the Eridge Project, however it is not expected for the Grand Opening to be until the beginning of the 2009 timetable.
It is believed that the Spa Valley Railway will allow connections to London and Uckfield by basing times on the arrivals of trains. The passenger usage of Eridge is thought by some to rise sharply also with the new link with the Spa Valley Railway.
Preceding station | Heritage railways | Following station | ||
---|---|---|---|---|
Groombridge | Spa Valley Railway | Terminus |
[edit] External links
- Spa Valley Railway
- Wealden Line Campaign
- Train times and station information for Eridge railway station from National Rail