From Wikipedia, the free encyclopedia
The Eolica Grǎdina Wind Farm is an proposed wind power project in Constanta County, Romania. It is consisted out of two individual wind farms conected together. It will have 31 individual wind turbines[1] with a nominal output of around 2 MW which will deliver up to 62 MW of power, enough to power over 41,000 homes, with a capital investment required of approximately US$75 million.
[edit] References
Power stations in Romania with more than 100 MW installed capacity |
|
Thermal power stations: |
|
|
Hydro power stations: |
|
|
Nuclear power stations: |
|
|
Wind power farms: |
|
|