Talk:Engineering Change Order
From Wikipedia, the free encyclopedia
There is nothing special about the chip industry in the way that a change is tracked. The information about the chip industry should move to a topic about the chip industry. More information about document control would be helpful since ECO are relevant to all manufacturing and relevant to all document control.
Should Engineering Change Order and Engineering Change Notice be merged?