Engineering laboratory (Marshall University)
From Wikipedia, the free encyclopedia
This article or section contains information about expected future buildings or structures. Some or all of this information may be speculative, and the content may change as building construction begins. |
The Engineering Laboratory at Marshall University will be located near the corner of 3rd Avenue and Hal Greer Blvd. in Huntington, West Virginia [1].
Contents |
[edit] History
On April 20, 2007, the Engineering Laboratory design was unveiled at Marshall University's Alumni Weekend [1]. Construction on the $3.5 million facility is expected to begin in August and be completed by fall 2008. It is part of Phase I of the future Engineering Complex.
It will consist of 16,000 sq. ft. and feature,
- a control lab,
- an envrionmental lab,
- a structures lab,
- a materials lab,
- a soils lab,
- a machine shop,
- a balance Room,
- and a visualization center.
The Engineering Laboratory is Phase I of the future Engineering Complex that will be constructed north of 3rd Avenue. Another larger structure is planned east of the Laboratory.