East Coast Expressway

From Wikipedia, the free encyclopedia

E 8
E8 expressway




MTD Prime Sdn Bhd
Length (kilometres) Total length
338 km

Phase 1
Karak-Jabur
169 km

Phase 2
Jabur-Chendering
169 km
Direction WestNorth
Start Karak, Pahang
Main destinations Karak
Lanchang
Temerloh
Chenor
Maran
Gambang
Kuantan
Jabur
Bukit Besi
Jerangau
Ajil
Kuala Terengganu
End Chendering, Terengganu
Construction dates 2001 - 2004
Road/Expressway joined E 8 Karak Expressway
2 Federal route 2
98 Federal route 98
83 Federal route 83
222 MEC Highway
-- Gebeng Bypass
14 Jerangau Highway
126 Federal route 126
124 Federal route 124
122 Ketengah Highway
132 Bukit Besi Highway
145 Second East-West Highway
Asian Highway Network none
Technical specifications
Number of lanes 4 lanes
Interchanges 18
Toll plazas 15
P Layby 6
R&R Rest and Service Area 4
R&R Overhead Bridge Restaurant none
V Vista Point none
Highway tunnels none
Type of roads Tarmac
Toll systems Closed toll systems
This box: view  talk  edit

The East Coast Expressway, ECE or (Malay: Lebuhraya Pantai Timur) (LPT) E 8 is an expressway in Malaysia. It is an extension of Karak Expressway, which starts from Kuala Lumpur to Karak. It provides a link from the West Coast of Peninsular Malaysia to the East Coast of Peninsular Malaysia. It features a closed toll system like the North-South Expressway. The speed limit on the expressway is 110 km/h (68 mph).

Contents

[edit] Background

The East Coast Expressway is a 338 km (210 mile)-long, closed toll, 4-lane expressway (2 per direction) beginning from the end of the Karak Expressway at the Karak Toll Plaza in Pahang through Lanchang, Mentakab, Temerloh, Chenor, Maran, Sri Jaya, Gambang, Kuantan, Jabur, Bukit Besi, Ajil and ending in Chendering in Terengganu.

[edit] History

Construction of the East Coast Expressway began in 2000, with Phase 1 opened in 22 April 2004. Phase 2 of the expressway, which will extend the highway to Terengganu, is under construction.

The second part of Phase 1, the Sri Jaya and Jabur was opened 15th July 2007

[edit] Sections

[edit] Phase 1 (Pahang): Karak - Jabur

The length of this phase is 169 km and will begin from Karak Expressway through Lanchang, Mentakab, Temerloh, Chenor, Maran, Kuantan and ends at Pahang - Terengganu border near Jabur. The tunkey contract has been awarded to MTD Capital Bhd.

[edit] Phase 2 (Terengganu): Jabur - Kuala Terengganu

The next section will begin from Jabur, Bukit Besi, Ajil, Kuala Terengganu until Chendering.

[edit] Future sections

[edit] Phase 3 (Kelantan): Kuala Terengganu - Kota Bharu

Phase 3 will connect from Kampung Gemuruh to Kota Bharu via Kota Bharu-Kuala Krai Highway. Phase 3 will cover 171 kilometers. The project will be put on fast track basis and expected to complete by 2010.[1]

[edit] Phase 4 (East Coast of Johor): Gambang - Johor Bahru

Phase 4 will be a 270 km coastal highway and will link between Gambang and Johor Bahru. Construction is expected to be done by 2015.[2]

[edit] Facilities

  • Closed Toll System
  • Two Lane Dual Carriageway
  • 52 Bridges (including underpasses)
  • 4 Rest and Service Areas
  • 6 Layby
  • 85 VBC (Vehicular Box Culvert)
  • Special entry/exit lane for motorcycles

[edit] Current events

  • 14 December 2007 - The streches of the East Coast Expressway from Karak to Lanchang was flooded.

[edit] Toll systems

For toll rates, See also Toll rates of the East Coast Expressway

[edit] Toll Plaza Abbreviations

A view of the Karak Toll Plaza, the end of the East Coast Expressway from the westbound lane.
A view of the Karak Toll Plaza, the end of the East Coast Expressway from the westbound lane.


[edit] List of Interchanges, Laybys and Rest and Service Areas: (Phase 1 and Phase 2)

Km Exit Interchange To Remarks
WEST
E 8 2KARAK EXPRESSWAY
Kuala Lumpur
Genting Highlands
Bentong
E 8 KARAK EXPRESSWAY
E 8 EAST COAST EXPRESSWAY (Phase 1)
Karak-Jabur
E 8
77

2
--
EXIT 813A
EXIT 813B
KARAK INTERCHANGE EXIT 813A
C138FELDA Mempaga
Pusat Serenti Mempaga

EXIT 813B
2Karak
9Mancis
9Kuala Pilah
Trumpet interchange
Sungai Bentong Bridge
77.8 EXIT 813C KARAK INTERCHANGE EXIT 813C
2Karak
9Mancis
9Kuala Pilah
West Coast bound
E 8
78
PKarak toll plaza
KAR
TnG TAG i
Customer Service Centre
West Coast bound
Karak toll plaza
KAR
RM (Cash) TnG TAG TAG TnG Transit Card
Closed toll systems
Collect transit card and pay a distance toll
89.9 PLanchang Layby East Coast bound
E 8
90
90.1 PLanchang Layby West Coast bound
EXIT 816 LANCHANG INTERCHANGE
LAN
2Lanchang
8Raub
8Kuala Lipis
Trumpet interchange with toll plaza
E 8
100
Bentong-Temerloh district border
Railway crossing bridge
E 8
126
126.4 EXIT 819 TEMERLOH INTERCHANGE
TEM
TnG TAG i
Customer Service Centre
98Temerloh
98Mentakab
98Jerantut
98Taman Negara
Trumpet interchange with toll plaza
E 8
127
Kampung Tebing Tinggi Kampung Tebing Tinggi
Kampung Paya Jejawi
Sanggang
Special entry/exit lane for motorcycles
Motorcycles only
Sungai Pahang Bridge
Jambatan Sultan Ahmad Shah II
(Semantan Bridge)
Kampung Sanggang Seberang C123 Kampung Sanggang Seberang
C123 Rantau Makmur
C123 Batu Sawar
Special entry/exit lane for motorcycles
Motorcycles only
R&R Temerloh rest and service area Image:AB-Tank.svg Shell East Coast bound
R&R Temerloh rest and service area Image:AB-Tank.svg Shell West Coast bound
Malaysian Road Transport Department (JPJ) Enforcement Stations Malaysian Road Transport Department (JPJ) Enforcement Stations East Coast bound
Temerloh-Maran district border
EXIT 821 CHENOR INTERCHANGE
CEN
83Bandar Pusat Jengka
2Kampung Awah
C23Chenor
Trumpet interchange with toll plaza
PMaran Layby East Coast bound
PMaran Layby West Coast bound
Sungai Maran Bridge
EXIT 825 MARAN INTERCHANGE
MAR
2Maran
C21Lubuk Paku
Trumpet interchange with toll plaza
EXIT 827 SRI JAYA INTERCHANGE
SRI
2Sri Jaya
C19Belimbing
C19Tasik Chini
Trumpet interchange with toll plaza
Maran-Kuantan district border
Sungai Lepar Bridge
Malaysian Road Transport Department (JPJ) Enforcement Stations Malaysian Road Transport Department (JPJ) Enforcement Stations West Coast bound
R&R Gambang rest and service area Image:AB-Tank.svg Petronas East Coast bound
R&R Gambang rest and service area Image:AB-Tank.svg Petronas West Coast bound
EXIT 830 GAMBANG INTERCHANGE
GAM
SOUTH
222 MEC HIGHWAY
222 Bandar MEC
222 Gambang
82 Pekan
12 Bandar Muadzam Shah
12 Segamat
Universiti Malaysia Pahang (UMP)
Kolej Islam Pahang Sultan Ahmad Shah (KIPSAS)
Trumpet interchange with toll plaza
PKuantan Layby West Coast bound
PKuantan Layby East Coast bound
Malaysian Road Transport Department (JPJ) Enforcement Stations Malaysian Road Transport Department (JPJ) Enforcement Stations East Coast bound
Sungai Kuantan Bridge
E 8
238
238.4 EXIT 833 KUANTAN INTERCHANGE
KUA
TnG TAG i
Customer Service Centre
Malaysian Highway Authority East Coast Regional Office
C4 Kuantan
C4 Bandar Indera Mahkota
C4 Sungai Lembing
3 AH 18 Sultan Haji Ahmad Shah Airport
2 Teluk Cempedak
Trumpet interchange with toll plaza
Malaysian Highway Authority East Coast Regional Office
E 8
239
Pahang Darul Makmur
Kuantan district border
Pahang-Terengganu border
Terengganu Darul Iman
Kemaman district border
EXIT 836 JABUR INTERCHANGE
JAB
EAST
-- GEBENG BYPASS
14 Jabur
-- Gebeng
3 AH 18 Kuantan Port
3 AH 18 Cherating
2 Beserah
-- Aspa Cottage
Trumpet interchange with toll plaza
E 8 EAST COAST EXPRESSWAY (Phase 2)
Jabur-Kuala Terengganu
Under construction
EXIT 8-- CHENIH INTERCHANGE
Under construction
14Bandar Chenih Baharu
126Bandar Cerul
Trumpet interchange with toll plaza
Under construction
EXIT 8-- AIR PUTIH INTERCHANGE
Under construction
T8Padang Air Putih
T8Chukai (Kemaman)
Trumpet interchange with toll plaza
Under construction
EXIT 8-- BANDAR SRI BANDI INTERCHANGE
Under construction
14Bandar Sri Bandi
124Air Jernih
124Kemasik
3 AH 18Kerteh
3 AH 18Kijal
Trumpet interchange with toll plaza
Under construction
Kemaman-Dungun district border
EXIT 8-- BANDAR AL-MUKTAFI BILLAH SHAH INTERCHANGE
Under construction
14Bandar Al-Muktafi Billah Shah
122Bandar Ketengah Jaya
122Paka
128Pasir Raja
Trumpet interchange with toll plaza
Under construction
EXIT 8-- BUKIT BESI INTERCHANGE
Under construction
14Bukit Besi
14Jerangau
132Dungun
Trumpet interchange with toll plaza
Under construction
Dungun-Hulu Terengganu district border
Hulu Terengganu-Kuala Terengganu district border
EXIT 8-- AJIL INTERCHANGE
Under construction
14Ajil
14Wakaf Tapai
106Kuala Berang
145Gua Musang
T2Marang
106Kenyir Lake
T2Pulau Redang
Trumpet interchange with toll plaza
Under construction
Bukit Payong toll plaza
Under construction
EXIT 8-- BUKIT PAYONG INTERCHANGE
Under construction
14Bukit Payong
14Gong Kedak
T2Marang
Interchange
Proposed Sungai Terengganu bridge
EXIT 8-- CABANG TIGA INTERCHANGE
Under construction
T9Cabang Tiga
3 AH 18Kuala Terengganu
Interchange
E 8 EAST COAST EXPRESSWAY (Phase 2)
Jabur-Kuala Terengganu
Under construction
EXIT 8-- CHENDERING INTERCHANGE
Under construction
NORTH
3 AH 18Kota Bharu
3 AH 18Jertih (Besut)
3 AH 18Bandar Permaisuri (Setiu)
SOUTHEAST
3 AH 18Kuala Terengganu
3 AH 18Seberang Takir
T-junctions

[edit] See also

[edit] References

  1. ^ Breaking the Proverty Cycle with NCER
  2. ^ Breaking the Proverty Cycle with NCER

[edit] External links

Languages