East Coast Expressway
From Wikipedia, the free encyclopedia
E 8 E8 expressway |
|
MTD Prime Sdn Bhd |
|
Length (kilometres) | Total length 338 km Phase 1 Karak-Jabur 169 km Phase 2 Jabur-Chendering 169 km |
---|---|
Direction | West→North |
Start | Karak, Pahang |
Main destinations | Karak Lanchang Temerloh Chenor Maran Gambang Kuantan Jabur Bukit Besi Jerangau Ajil Kuala Terengganu |
End | Chendering, Terengganu |
Construction dates | 2001 - 2004 |
Road/Expressway joined | E 8 Karak Expressway 2 Federal route 2 98 Federal route 98 83 Federal route 83 222 MEC Highway -- Gebeng Bypass 14 Jerangau Highway 126 Federal route 126 124 Federal route 124 122 Ketengah Highway 132 Bukit Besi Highway 145 Second East-West Highway |
Asian Highway Network | none |
Technical specifications | |
Number of lanes | 4 lanes |
Interchanges | 18 |
Toll plazas | 15 |
P Layby | 6 |
R&R Rest and Service Area | 4 |
R&R Overhead Bridge Restaurant | none |
V Vista Point | none |
Highway tunnels | none |
Type of roads | Tarmac |
Toll systems | Closed toll systems |
The East Coast Expressway, ECE or (Malay: Lebuhraya Pantai Timur) (LPT) E 8 is an expressway in Malaysia. It is an extension of Karak Expressway, which starts from Kuala Lumpur to Karak. It provides a link from the West Coast of Peninsular Malaysia to the East Coast of Peninsular Malaysia. It features a closed toll system like the North-South Expressway. The speed limit on the expressway is 110 km/h (68 mph).
Contents |
[edit] Background
The East Coast Expressway is a 338 km (210 mile)-long, closed toll, 4-lane expressway (2 per direction) beginning from the end of the Karak Expressway at the Karak Toll Plaza in Pahang through Lanchang, Mentakab, Temerloh, Chenor, Maran, Sri Jaya, Gambang, Kuantan, Jabur, Bukit Besi, Ajil and ending in Chendering in Terengganu.
[edit] History
Construction of the East Coast Expressway began in 2000, with Phase 1 opened in 22 April 2004. Phase 2 of the expressway, which will extend the highway to Terengganu, is under construction.
The second part of Phase 1, the Sri Jaya and Jabur was opened 15th July 2007
[edit] Sections
[edit] Phase 1 (Pahang): Karak - Jabur
The length of this phase is 169 km and will begin from Karak Expressway through Lanchang, Mentakab, Temerloh, Chenor, Maran, Kuantan and ends at Pahang - Terengganu border near Jabur. The tunkey contract has been awarded to MTD Capital Bhd.
[edit] Phase 2 (Terengganu): Jabur - Kuala Terengganu
The next section will begin from Jabur, Bukit Besi, Ajil, Kuala Terengganu until Chendering.
[edit] Future sections
[edit] Phase 3 (Kelantan): Kuala Terengganu - Kota Bharu
Phase 3 will connect from Kampung Gemuruh to Kota Bharu via Kota Bharu-Kuala Krai Highway. Phase 3 will cover 171 kilometers. The project will be put on fast track basis and expected to complete by 2010.[1]
[edit] Phase 4 (East Coast of Johor): Gambang - Johor Bahru
Phase 4 will be a 270 km coastal highway and will link between Gambang and Johor Bahru. Construction is expected to be done by 2015.[2]
[edit] Facilities
- Closed Toll System
- Two Lane Dual Carriageway
- 52 Bridges (including underpasses)
- 4 Rest and Service Areas
- 6 Layby
- 85 VBC (Vehicular Box Culvert)
- Special entry/exit lane for motorcycles
[edit] Current events
- 14 December 2007 - The streches of the East Coast Expressway from Karak to Lanchang was flooded.
[edit] Toll systems
- For toll rates, See also Toll rates of the East Coast Expressway
[edit] Toll Plaza Abbreviations
- KAR (813) - KARAK
- LAN (816) - LANCHANG
- TEM (816) - TEMERLOH
- CHE (819) - CHENOR
- MAR (825) - MARAN
- SRI (827) - SRI JAYA
- GAM (830) - GAMBANG
- KUA (833) - KUANTAN
- JAB (836) - JABUR
[edit] List of Interchanges, Laybys and Rest and Service Areas: (Phase 1 and Phase 2)
Km | Exit | Interchange | To | Remarks | |
---|---|---|---|---|---|
WEST E 8 2KARAK EXPRESSWAY Kuala Lumpur Genting Highlands Bentong |
|||||
E 8 KARAK EXPRESSWAY | |||||
E 8 EAST COAST EXPRESSWAY (Phase 1) Karak-Jabur |
|||||
E 8 77 2 -- |
EXIT 813A EXIT 813B |
KARAK INTERCHANGE | EXIT 813A C138FELDA Mempaga Pusat Serenti Mempaga EXIT 813B 2Karak 9Mancis 9Kuala Pilah |
Trumpet interchange | |
Sungai Bentong Bridge | |||||
77.8 | EXIT 813C | KARAK INTERCHANGE | EXIT 813C 2Karak 9Mancis 9Kuala Pilah |
West Coast bound | |
E 8 78 |
|||||
PKarak toll plaza KAR |
TnG TAG i Customer Service Centre |
West Coast bound | |||
Karak toll plaza KAR RM (Cash) TnG TAG TAG TnG Transit Card Closed toll systems Collect transit card and pay a distance toll |
|||||
89.9 | PLanchang Layby | East Coast bound | |||
E 8 90 |
|||||
90.1 | PLanchang Layby | West Coast bound | |||
EXIT 816 | LANCHANG INTERCHANGE LAN |
2Lanchang 8Raub 8Kuala Lipis |
Trumpet interchange with toll plaza | ||
E 8 100 |
|||||
Bentong-Temerloh district border | |||||
Railway crossing bridge | |||||
E 8 126 |
|||||
126.4 | EXIT 819 | TEMERLOH INTERCHANGE TEM TnG TAG i Customer Service Centre |
98Temerloh 98Mentakab 98Jerantut 98Taman Negara |
Trumpet interchange with toll plaza | |
E 8 127 |
|||||
Kampung Tebing Tinggi | Kampung Tebing Tinggi Kampung Paya Jejawi Sanggang |
Special entry/exit lane for motorcycles Motorcycles only |
|||
Sungai Pahang Bridge Jambatan Sultan Ahmad Shah II (Semantan Bridge) |
|||||
Kampung Sanggang Seberang | C123 Kampung Sanggang Seberang C123 Rantau Makmur C123 Batu Sawar |
Special entry/exit lane for motorcycles Motorcycles only |
|||
R&R Temerloh rest and service area | Shell | East Coast bound | |||
R&R Temerloh rest and service area | Shell | West Coast bound | |||
Malaysian Road Transport Department (JPJ) Enforcement Stations | Malaysian Road Transport Department (JPJ) Enforcement Stations | East Coast bound | |||
Temerloh-Maran district border | |||||
EXIT 821 | CHENOR INTERCHANGE CEN |
83Bandar Pusat Jengka 2Kampung Awah C23Chenor |
Trumpet interchange with toll plaza | ||
PMaran Layby | East Coast bound | ||||
PMaran Layby | West Coast bound | ||||
Sungai Maran Bridge | |||||
EXIT 825 | MARAN INTERCHANGE MAR |
2Maran C21Lubuk Paku |
Trumpet interchange with toll plaza | ||
EXIT 827 | SRI JAYA INTERCHANGE SRI |
2Sri Jaya C19Belimbing C19Tasik Chini |
Trumpet interchange with toll plaza | ||
Maran-Kuantan district border | |||||
Sungai Lepar Bridge | |||||
Malaysian Road Transport Department (JPJ) Enforcement Stations | Malaysian Road Transport Department (JPJ) Enforcement Stations | West Coast bound | |||
R&R Gambang rest and service area | Petronas | East Coast bound | |||
R&R Gambang rest and service area | Petronas | West Coast bound | |||
EXIT 830 | GAMBANG INTERCHANGE GAM |
SOUTH 222 MEC HIGHWAY 222 Bandar MEC 222 Gambang 82 Pekan 12 Bandar Muadzam Shah 12 Segamat Universiti Malaysia Pahang (UMP) Kolej Islam Pahang Sultan Ahmad Shah (KIPSAS) |
Trumpet interchange with toll plaza | ||
PKuantan Layby | West Coast bound | ||||
PKuantan Layby | East Coast bound | ||||
Malaysian Road Transport Department (JPJ) Enforcement Stations | Malaysian Road Transport Department (JPJ) Enforcement Stations | East Coast bound | |||
Sungai Kuantan Bridge | |||||
E 8 238 |
|||||
238.4 | EXIT 833 | KUANTAN INTERCHANGE KUA TnG TAG i Customer Service Centre Malaysian Highway Authority East Coast Regional Office |
C4 Kuantan C4 Bandar Indera Mahkota C4 Sungai Lembing 3 AH 18 Sultan Haji Ahmad Shah Airport 2 Teluk Cempedak |
Trumpet interchange with toll plaza Malaysian Highway Authority East Coast Regional Office |
|
E 8 239 |
|||||
Pahang Darul Makmur Kuantan district border |
|||||
Pahang-Terengganu border | |||||
Terengganu Darul Iman Kemaman district border |
|||||
EXIT 836 | JABUR INTERCHANGE JAB |
EAST -- GEBENG BYPASS 14 Jabur -- Gebeng 3 AH 18 Kuantan Port 3 AH 18 Cherating 2 Beserah -- Aspa Cottage |
Trumpet interchange with toll plaza | ||
E 8 EAST COAST EXPRESSWAY (Phase 2) Jabur-Kuala Terengganu Under construction |
|||||
EXIT 8-- | CHENIH INTERCHANGE Under construction |
14Bandar Chenih Baharu 126Bandar Cerul |
Trumpet interchange with toll plaza Under construction |
||
EXIT 8-- | AIR PUTIH INTERCHANGE Under construction |
T8Padang Air Putih T8Chukai (Kemaman) |
Trumpet interchange with toll plaza Under construction |
||
EXIT 8-- | BANDAR SRI BANDI INTERCHANGE Under construction |
14Bandar Sri Bandi 124Air Jernih 124Kemasik 3 AH 18Kerteh 3 AH 18Kijal |
Trumpet interchange with toll plaza Under construction |
||
Kemaman-Dungun district border | |||||
EXIT 8-- | BANDAR AL-MUKTAFI BILLAH SHAH INTERCHANGE Under construction |
14Bandar Al-Muktafi Billah Shah 122Bandar Ketengah Jaya 122Paka 128Pasir Raja |
Trumpet interchange with toll plaza Under construction |
||
EXIT 8-- | BUKIT BESI INTERCHANGE Under construction |
14Bukit Besi 14Jerangau 132Dungun |
Trumpet interchange with toll plaza Under construction |
||
Dungun-Hulu Terengganu district border | |||||
Hulu Terengganu-Kuala Terengganu district border | |||||
EXIT 8-- | AJIL INTERCHANGE Under construction |
14Ajil 14Wakaf Tapai 106Kuala Berang 145Gua Musang T2Marang 106Kenyir Lake T2Pulau Redang |
Trumpet interchange with toll plaza Under construction |
||
Bukit Payong toll plaza Under construction |
|||||
EXIT 8-- | BUKIT PAYONG INTERCHANGE Under construction |
14Bukit Payong 14Gong Kedak T2Marang |
Interchange | ||
Proposed Sungai Terengganu bridge | |||||
EXIT 8-- | CABANG TIGA INTERCHANGE Under construction |
T9Cabang Tiga 3 AH 18Kuala Terengganu |
Interchange | ||
E 8 EAST COAST EXPRESSWAY (Phase 2) Jabur-Kuala Terengganu Under construction |
|||||
EXIT 8-- | CHENDERING INTERCHANGE Under construction |
NORTH 3 AH 18Kota Bharu 3 AH 18Jertih (Besut) 3 AH 18Bandar Permaisuri (Setiu) SOUTHEAST 3 AH 18Kuala Terengganu 3 AH 18Seberang Takir |
T-junctions |
[edit] See also
[edit] References
[edit] External links
- MTD Prime - concessions of East Coast Expressway
- East Coast Expressway Project Phase 2 Project Page
|
|