E2 Series Shinkansen

From Wikipedia, the free encyclopedia

E2 Series Shinkansen
E2 series Shinkansen at Ōmiya Station, December 2003
E2 series Shinkansen at Ōmiya Station, December 2003

In service 1997 - Present
Manufacturer Hitachi, Kawasaki HI, Nippon Sharyo, Tokyu Car
Number built 442 vehicles (47 sets)
Formation 8/10 cars per trainset
Operator JR East
Depots Sendai, Nagano
Lines served Tōhoku Shinkansen, Nagano Shinkansen
Specifications
Car body Aluminium
Car length 25,000 mm (intermediate cars), 25,700 mm (end cars)
Width 3,380 mm
Maximum speed 275 km/h (Tōhoku Shinkansen), 260 km/h (Nagano Shinkansen)
Traction system (AC) MT205 (24 x 300 kW per 8-car train, 32 x 300 kW per 10-car train)
Power output 7.2 MW (for 8-car train), 9.6 MW (for 10-car train)
Gauge 1,435 mm
Voltage 25 kV AC, 50/60 Hz overhead
Safety systems DS-ATC

The E2 Series Shinkansen are new trains built between 1995 and 2005 for Japan's Jōetsu, Tōhoku and Nagano Shinkansen high-speed dedicated rail lines. They are formed in 8- or 10-car sets, and the 10-car sets can be coupled to E3 Series Shinkansen Komachi sets using couplers hidden behind sliding nose doors. The 8-car sets are used on the Nagano Shinkansen, and the 10-car sets on Tōhoku Shinkansen services.

Their maximum speed is 275 km/h (170 mph), and 260 km/h (163 mph) on the Nagano Shinkansen.

An E2-1000 Series train (J56) broke the Japanese rail speed record for a production train (i.e. not a dedicated test train) in April 2003 when it reached a speed of 362 km/h during a series of late-night high-speed test runs between Urasa and Niigata on the Jōetsu Shinkansen.

[edit] Fleet

As of 2007, there are 47 E2 series sets (14 N sets and 33 J sets) in service.

[edit] Exports

Main article: CRH2

China ordered a number of 250 km/h (153 mph) trains based on the E2-1000 Series design, renamed it as CRH2, becoming the second Shinkansen train exported apart from the 700T series for Taiwan. These CRH2 trains consist of total 60 sets, the first 3 sets (2001-2003) were built in Japan, the next 6 sets were delivered in complete knock down (CKD) form and assembled by CSR Sifang Locomotive and Rolling Stock, the rest 51 sets were built by Sifang through technology transfer from Japan. The first train arrived at Qingdao port on March 8, 2006.