Docklands Light Railway

From Wikipedia, the free encyclopedia

Docklands Light Railway
Colour on map Double Turquoise stripe
Year opened 1987
Line type Primarily elevated
Rolling stock DLR B Stock
Stations served 39
Length (km) 31
Length (miles) 19
Depots Poplar
Beckton
Journeys made 65,000,000[1] (per annum)
Rail lines of
Transport for London
London Underground lines
  Bakerloo
  Central
  Circle
  District
  Hammersmith & City
  Jubilee
  Metropolitan
  Northern
  Piccadilly
  Victoria
  Waterloo & City
Other lines
  Docklands Light Railway
  Tramlink
  Overground
DLR roundel
DLR roundel

The Docklands Light Railway (DLR) is a light rail system serving the redeveloped Docklands area of East London, England. It opened on August 31, 1987 and after extensions reaches north to Stratford, south to Lewisham, west to Bank in the City of London financial district, and east to Beckton and North Woolwich. DLR track and trains are not compatible with those of London Underground, but the two systems share a ticketing system and the DLR is shown on the London Underground Tube map.

The trains are computer-controlled and normally have no driver: a Passenger Service Agent (PSA)[1][2] on each train is responsible for patrolling the train, checking tickets, making announcements and controlling the doors. PSAs can also take control of the train in certain circumstances including equipment failure and emergencies. Stations are generally unstaffed except those below ground, which are required to be staffed in case evacuation is needed.

The DLR has been operated and maintained by a franchisee since 1997. The current franchise, due to expire in April 2013, is held by Serco Docklands Ltd., a company formed jointly by Serco and the former DLR management team.

The DLR system has 39 stations and is expanding. In 2006 it carried over 60 million passengers.[3] The Docklands Light Railway was 20 years old on 31 August 2007.[4]

Contents

[edit] History

The docks east of London began to decline in the early 1960s as international freight became containerised. The opening of the Tilbury container docks, further east in Essex, rendered the old docks redundant and in 1980 control of them passed to the British government.

Tower Gateway station was the DLR’s original link to central London.
Tower Gateway station was the DLR’s original link to central London.

The Jubilee Line of the London Underground had opened in 1979 from Stanmore to Charing Cross, intended as the first stage of a cross-town tube line beyond Charing Cross to various places in south-east London. Although land, for example at Ludgate Circus and at Lewisham, had been reserved for the second stage, the rising cost for that Jubilee Line extension led in the early 1980s to the project's indefinite postponement.[5]

The London Docklands Development Corporation, needing to provide public transport cheaply for the former docks area to stimulate regeneration, chose a light-rail scheme using still existing docks railway infrastructure to link the West India Docks to Tower Hill and to a northern terminus, for which Stratford station, using a track alongside the Great Eastern lines out of London, was preferred over Mile End where the need for tram-like street-running was at variance with the plan to have a fully automated railway. At Stratford a disused bay platform at the west of the station was advantageous and there was interchange with the Central Line and main lines. The growth brought to Docklands later enabled the Jubilee Line to be extended in 1999 to East London, by a more southerly route than originally proposed, through Surrey Quays/Docks, Canary Wharf, the Greenwich peninsula (which was the next regeneration area) to Stratford.
The initial system, costing only £77 million, from Tower Gateway and from Stratford to Island Gardens was opened by Her Majesty Queen Elizabeth II.

[edit] Initial system

The initial system was constructed by Balfour Beatty between 1985 and 1987.[6]

As originally conceived, the system was to be entirely above ground and comprise three branches, with their termini at Tower Gateway, Stratford and Island Gardens. Most of the track was elevated, either on new lightweight concrete viaducts or on disused railway viaducts, with some use of disused surface-level railway right of way.

The system was lightweight, with stations and trains only a single articulated vehicle long. The three branches together totalled 13 km,[7] were connected by a flat triangular junction near Poplar. Services ran Tower Gateway-Island Gardens and Stratford-Island Gardens, meaning that the north side of the junction was not used in regular passenger service.

The stations on the initial system were mostly to a common design and were constructed out of a standard set of parts. The principal distinguishing feature of the stations was a relatively short half cylindrical glazed blue canopy to provide shelter from the rain.

[edit] First extensions

The view from Tower Gateway looking east shows Fenchurch Street approach tracks to the left, the original DLR line in the centre, and DLR train emerging from the tunnel to Bank to the right
The view from Tower Gateway looking east shows Fenchurch Street approach tracks to the left, the original DLR line in the centre, and DLR train emerging from the tunnel to Bank to the right

The initial system proved to have insufficient capacity as the Docklands area developed into a major financial centre and employment zone. Additionally, the Tower Gateway terminus, situated at the very edge of the City of London, attracted criticism for its poor connections.

In response to this, all stations and trains were extended to two-unit lengths, and the system was extended into the heart of the City of London with a tunnel to Bank underground station, which opened in 1991. This extension diverged from the initial western branch, leaving Tower Gateway station on a limb. It also rendered the initial car fleet obsolete, as its construction was not suitable for use underground (see the Rolling Stock section, below, and the main article Docklands Light Railway rolling stock).

At the same time, the areas in the east of Docklands needed better transport connections to encourage development. This resulted in a fourth branch being constructed, from Poplar via Canning Town transport interchange to Beckton, running along the north side of the Royal Docks complex. Early designs showed several options through the Blackwall Area.[8] As part of this extension, one side of the original flat triangular junction was replaced with a grade-separated junction west of Poplar, and a new grade-separated junction was created at the divergence of the Stratford and Beckton lines east of Poplar. Poplar station was rebuilt to provide cross-platform interchange between the Stratford and Beckton lines.

The growth of the Canary Wharf office complex required the redevelopment of Canary Wharf DLR station from a small wayside station to a large complex with six platforms serving three tracks, beneath a large overall roof and fully integrated into the malls below the office towers. The original DLR station was never completed and was, in fact, dismantled before the line officially opened. The automatically-operated trains continued to stop at this location.

[edit] Second stage extensions

Early in the days of the DLR's operation, the London Borough of Lewisham commissioned a feasibility study of extending the DLR under the Thames to Lewisham. The outcome of the study led the South London borough to push the case for an extension, and eventually a line to Greenwich, Deptford and Lewisham joined the roster of extensions.

The line was planned to leave the original DLR route south of Crossharbour turn-back sidings, dropping gently to Mudchute, a street level station replacing the high-level Mudchute on the former London & Blackwall viaduct. Immediately after, the line would drop into tunnel, tracing the route of the viaduct to Island Gardens, a just-below-surface station reached by a staircase. Crossing the Thames, the line would have a station in the centre of Greenwich, thereafter rising to the surface in deep tunnel and then cut-and-cover to a stop at the mainline Greenwich station, the southbound DLR track offering convenient cross-platform interchange with the city-bound mainline. From here, the line would snake across concrete viaducts to Deptford, Elverson Road (at street level on a road close to Lewisham town centre), terminating in two platforms lying directly under the mainline platforms at Lewisham, in walking distance of the town shopping centre, and bus services stopping directly outside the station.

The Lewisham extension, authorised as above, opened in 1999. With the opening of the extension, DLR took its first steps from being a local people-mover to a truly important backbone of the east/south-east London transport system.

On 2 December 2005, a new eastward branch, running along the southern side of the Royal Docks complex, opened from Canning Town to King George V, via London City Airport. Further extension to Woolwich, already being shown on London tube maps, and to be built at or close to the future stop on the Crossrail line to Abbey Wood via West India and Royal Docks, will contribute to this growth.[7]

[edit] Current system

A Docklands Light Railway train enters Canary Wharf from the south.
A Docklands Light Railway train enters Canary Wharf from the south.

The DLR now includes routes extending for a total of 31 km.[7] There are five branches: to Lewisham in the south, Stratford in the north, Beckton and King George V in the east, and to Central London, splitting to serve Bank and Tower Gateway. Although the system allows many different combinations of routes, at present the following four are operated in normal service:

  • Stratford to Lewisham
  • Bank to Lewisham
  • Bank to King George V
  • Tower Gateway to Beckton

Trains during peak times on the Stratford line turn back at Crossharbour rather than continuing to Lewisham. There are also occasional trains from Tower Gateway to Crossharbour and Lewisham. There are no limited-stop trains on the DLR: every train serves every station on its route.

The northern and southern branches terminate at the National Rail (main line) stations at Stratford and Lewisham. Other direct interchanges between the DLR and National Rail are at Limehouse and Greenwich.

[edit] Map

A geographically-accurate map of the Docklands Light Railway

[edit] Stations

An eastbound train leaving Westferry Station.
An eastbound train leaving Westferry Station.

Many DLR stations are elevated, with others at street level, in a cutting, or underground. Access to the platforms is normally by staircase, very few stations having escalators. The DLR network from the outset has been fully accessible to wheelchairs. The stations have high platforms, matching the floor height of the cars, allowing easy access to the trains for passengers with wheelchairs or pushchairs.

Most of the stations are of a modular design dating back to the initial system, albeit extended and improved over the years. This design has two side platforms, each with separate access from the street, and platform canopies with a distinctive rounded roof design. Most stations are unstaffed, although for safety reasons the three stations below ground, Bank, Island Gardens, and Cutty Sark, are staffed, as are a few of the busier interchange stations.

See List of Docklands Light Railway stations for stations on the system.

[edit] DLR Art

On the 3 July 2007, DLR officially launched[9] their own art programme similar to that in place on the London Underground, Platform for Art. Alan Williams was appointed to produce Docklands Light Railway's first temporary commission. Known as "sidetrack" the project portrays the ordinary and extraordinary sights, often unfamiliar to passengers, along the route of the Docklands Light Railway and was displayed throughout the network.

[edit] Fares and ticketing

Ticketing is part of the London Fare zone system, and Travelcards that cover the correct zones are valid.

There are also one-day and season DLR-only "Rover" tickets available, plus a one-day DLR "Rail and River Rover" ticket for use on the DLR and on City Cruises river boats. Oyster Pre-Pay is also available on the DLR — passengers need to both touch in and touch out their Oyster cards on the readers at the entrance / exit to the platforms, or pass through the automatic gates at selected stations.

Tickets must be purchased from ticket machines at the entrance to the platforms, and are required before the passenger enters the platform. There are no ticket barriers in DLR-only stations, and correct ticketing is enforced by on-train checks by the Passenger Service Agent. Exceptions to this rule are Bank, Canning Town and Stratford stations, where the DLR platforms are located within the barrier lines of a London Underground or National Rail station.

The DLR is used by up to a hundred thousand people daily, with around 60 million journeys yearly.[10]

Docklands Light Railway
(all stations have step-free access)
utINTa
Bank
utSTR uINTa
Tower Gateway
uTUNNELe uSTR
( Tower Hill) ( Fenchurch Street)
uSTRlf uABZlg
uINT
Shadwell
uINT
Limehouse
uWBRÜCKE-ELEVa
Regent's Canal
uWBRÜCKE-ELEV
Limehouse Cut
uHST-ELEV
Westferry
uABZlf-ELEV uHELEV uSTRlg-ELEV
ueABZlf-ELEV ueSTRlg-ELEV uELEV
uSTRrg-ELEV uHELEV ueABZrd-ELEV ueELEVd uELEV
North Quay Junction
uELEV ueSTRrg-ELEV ueKRZ-ELEV ueSTRrf-ELEV uELEV
uHST-ELEV ueELEVd uELEV uELEV
West India Quay
ueABZrg-ELEV ueSTRrf-ELEV uELEV uELEV
uWBRÜCKE-ELEV uELEV uELEV
West India Docks
uINT-ELEV uELEV uELEV
Canary Wharf
uWBRÜCKE-ELEV uSTRlf-ELEV uHELEV uABZlg-ELEV
West India Docks
ueHST-ELEV uELEV
Heron Quays (original site)
uINT-ELEV uELEVe
Heron Quays ( Canary Wharf)
uWBRÜCKE-ELEV uSTR
West India Docks
uHST-ELEV uSTR
South Quay
ueHST-ELEV uSTR
South Quay under construction
uWBRÜCKE-ELEVe uSTR
Millwall Inner Dock
uHST uSTR
Crossharbour
uABZlf uSTRlg uSTR
ueHST uHST uSTR
Mudchute (relocated 1999)
uxENDEe uTUNNELa uSTR
ueKBFe-ELEV utHST uSTR
Island Gardens (relocated 1999)
utWASSER uSTR
River Thames
utHST uSTR
Cutty Sark for Maritime Greenwich
uTUNNELe uSTR
uINT uSTR
Greenwich
uWBRÜCKE-ELEVa uSTR
Deptford Creek (four crossings)
uHST-ELEV uSTR
Deptford Bridge
uELEVe uSTR
uHST uSTR
Elverson Road
uWBRÜCKE uSTR
River Ravensbourne
uTUNNELa uSTR
utINTe uSTR
Lewisham
uSTRrg uHSTR uHSTR uSTRrf
uBHF
Poplar
uSTR uKDSa
Poplar Depot
uABZlf uABZ3lf uHSTR uSTRlg
uELEVa uSTR
uHST-ELEV uSTR
Blackwall
uHST-ELEV uSTR
East India
uWBRÜCKE-ELEVe uSTR
River Lee/Lea
uSTRrg uSTRrf uHST
All Saints
uSTR uexSTRrg ueHSTR uexSTRlg uHST
Langdon Park
uINTCPICl uexINTCPICr ueSTR uSTR
Canning Town
ueABZrg uexABZrf uexHST uSTR
Star Lane opens 2010)
uSTR ueSTR uexINT uSTR
West Ham (opens 2010)
uSTR ueSTR uexHST uSTR
Abbey Road (opens 2010)
uSTR ueSTR uexHST uSTR
Stratford High Street (opens 2010)
uSTR ueSTR ueSTR uHST
Devons Road
uSTR ueSTR ueSTR uINT
Bow Church ( Bow Road)
uSTR ueSTR ueSTR uHST
Pudding Mill Lane
uSTR ueSTR uexINT uINTe
Stratford
uSTR ueSTR uexINTe
Stratford International for High Speed 1 (opens 2010)
uABZlf ueABZ3lf uSTRlg
uELEVa uSTR
ueHST-ELEV uSTR
Thames Wharf (proposed)
uHST-ELEV uSTR
West Silvertown
uHST-ELEV uSTR
Pontoon Dock
ueHST-ELEV uSTR
Silvertown (proposed)
uHST-ELEV FLUG uSTR
London City Airport
uELEVe uSTR
uxKBFe uSTR
King George V
uexTUNNELa uSTR
utexWASSER uSTR
River Thames
utexINTe uSTR
Woolwich Arsenal (opens 2009)
uHST
Royal Victoria
uHST
Custom House for ExCeL Exhibition Centre
uHST
Prince Regent
uHST-ELEV
Royal Albert
uHST
Beckton Park
uHST
Cyprus
uSTR uKBFa
Beckton
uHST uSTR
Gallions Reach
uABZld uSTRrf
uxKDSe
Beckton Depot
uexHST
Beckton Riverside (proposed)
uexWTUNNEL1
River Roding
uexHST
Creekmouth (proposed)
uexHST
Barking Riverside (proposed)
uexHST
Dagenham Vale (proposed)
uexKBFe
Dagenham Dock (proposed)


[edit] Accidents and incidents

[edit] Overrun of station buffers

Prior to the public opening of the railway, on 10 March 1987, a train crashed through station buffer stops at the original high-level terminus Island Gardens station and was left hanging from the end of the elevated track. The accident was caused by unauthorised tests being run before accident-preventing modifications had been installed. The train was being driven manually at the time.[11][12][13]

[edit] Service difficulties with the Royal train

In July 1987, a series of minor incidents marred the operation of the royal train (number E2R) carrying Queen Elizabeth II as part of the ceremonies marking the opening of the line. The train had been manually dispatched from its starting point at Island Gardens station five minutes early because of the early arrival of the royal party. The train was on automatic control and so, being ahead of schedule, was held at the next station (Mudchute) for a few minutes before the driver reverted to manual control "to speed the Royal passage" and continued on to Poplar station, where the royal party were to disembark. At the station, a member of the royal security detail used the emergency exit to leave the train ahead of the Queen before it had fully stopped. This caused the train to make an emergency stop in the station, short of its normal position and out of range of the docking beacon that marked its arrival point. The train doors would not open, impeding the Queen's exit for several minutes.[14][15][16]

[edit] Collision at West India Quay bridge

On 22 April 1991, two trains collided at a junction on the West India Quay bridge during morning rush hour, requiring a shutdown of the entire system and evacuation of the involved passengers by ladder.[17][18] One of the two trains was traveling automatically, operating without a driver, while the other was under manual control.[19]

[edit] South Quay bombing

The Docklands Light Railway has also been the scene of a terrorist attack. On 9 February 1996, the Provisional Irish Republican Army exploded a lorry under a bridge near South Quay DLR station, killing 2 people and injuring many others. This number would have been higher if not for advance warning. The blast did £85 million damage and marked an end to the IRA ceasefire. Significant disruption was caused to DLR services, and a train was left stranded at Island Gardens station, unable to move until the track was rebuilt.

[edit] Rolling stock

A DLR train is headed by B2K stock car 96, shown at Tower Gateway station
A DLR train is headed by B2K stock car 96, shown at Tower Gateway station

The DLR is operated by high-floor, bi-directional, single-articulated cars with four doors on each side, each train consisting of two cars. The cars have no driver’s cab, although there is a small driver’s console concealed behind a locked panel at each car end from which the Passenger Service Agent (PSA) can drive the car when necessary. Other consoles at each door opening allow the PSA to control door closure and make announcements whilst patrolling the train. Because of the absence of a driver’s position, the fully-glazed car ends provide an unusual forward (or rear) view for passengers. The current stock has a top speed of 50 mph (80 km/hour).

Despite having high floors and being highly automated, the cars are derived from a German light-rail design intended for use in systems with elements of street running. All the cars that have operated on the system to date look similar, but there have been several different types, some still in service and others sold to other operators. A further car type, with quite different styling, is to be introduced in 2007.

[edit] Signalling technology

Originally, the DLR used signalling based on a fixed-block technology developed by GEC-General Signal and General Railway Signal.[6] This was replaced in 1994 with a moving-block system developed by Alcatel, called SelTrac.The SelTrac system was bought by Thales in 2007 and current updates are being provided by Thales Signalling Solutions. The same technology is used for some other rapid transit systems, including Vancouver's SkyTrain,Toronto's SRT, San Francisco's Municipal Railway (MUNI) and Hong Kong's MTR. Transmissions occur between each train's onboard computer and the control centre at Poplar. If this link is broken, the train stops until it is authorised to move again. If the whole system fails the train can run at only 20 km/h for safety until the system is restored. Also, emergency brakes can be applied if the train breaks the speed limit during manual control, or if the train leaves the station when the route has not been set.[20]

[edit] Recent developments

[edit] New platforms at Stratford

Status - both platforms have opened
New platforms 4a and 4b at Stratford
New platforms 4a and 4b at Stratford

The DLR originally only had one narrow two-car platform at Stratford, which limited capacity and hindered interchange with other services at the station. This closed on 15 June 2007 and has been replaced by two new three-car platforms: the first new platform opened on 18 June 2007[21] and the second opened on 9 December 2007.[22]

[edit] Langdon Park station

Status - Opened

A station at Langdon Park in-between All Saints and Devons Road stations opened on December 9, 2007.[23]

[edit] Future developments

With the development of the eastern Docklands as part of the ‘Thames Gateway’ initiative and London’s successful bid for the 2012 Summer Olympics, several extensions and enhancements are under construction, being planned or being discussed:[24]

[edit] Woolwich Arsenal extension

Status - Under Construction

This will extend the London City Airport branch from King George V to Woolwich Arsenal and is due to open on 28 February 2009.[25] The projected cost of £150 million, due to a required second DLR tunnel crossing of the River Thames, is being met by Private Finance Initiative funding. Construction began in June 2005, and the tunnel was completed on 23 July 2007.[26]

[edit] Upgrading Bank - Lewisham route to 3-car trains

Status - Under Construction

The stations between Bank and Lewisham will be upgraded to allow operation of 3-car trains to increase capacity. More frequent trains were considered as an alternative, but it was found that the necessary signalling changes would be as expensive as upgrading to handle longer trains but would provide fewer benefits.[27]

The work involves the lengthening of platforms at most above-ground stations together with viaduct-strengthening works to support the additional weight of lengthened trains, as much of this section dates from the initial system originally built for single-car operation.

South Quay station will be rebuilt to the east as nearby curves preclude lengthening. Mudchute will gain a third platform and all the platforms there will have a full-length canopy.[28] However, due to the cost and the risk to nearby historic buildings, the underground Cutty Sark station will not be extended, but use of Selective Door Operation (SDO) has been approved by the Railway Inspectorate at this station instead.

The £200m works contract was awarded on 3 May 2007.[29] The work is to be carried out during 2007-2009. Some work has already started resulting in partial weekend closures and a large portion of the work will be carried out in 2008 in concentrated periods of activity.

[edit] Other stations affected

Although not on the Bank – Lewisham route, two other stations are included in the plans so as to improve operational flexibility. Poplar station has already been lengthened in advance of the work elsewhere to confirm that the proposed method of construction is satisfactory. To enable use by 3-car trains, Tower Gateway will be converted from its current two-track terminal layout to a single line served by two platforms; the southern access for departures, the northern for arrivals.[30] It will be closed from 28 June 2008 until April 2009 to enable the work to be carried out.

[edit] Stratford International extension / North London Line conversion

Status - Under Construction

An extension is currently being built from Canning Town to the new Stratford International station. This takes over part of the closed section of the North London Line infrastructure and will link the Docklands area with domestic and international high-speed services on High Speed 1. It is projected to open early in 2010 and is an important part of the transport improvement package for the 2012 Olympic Games, which will largely be held on a site adjoining Stratford International.

Four new stations will be built: Star Lane (formerly known as Cody Road), Abbey Road, Stratford High Street (formerly known as Stratford Market) and Stratford International, as well as serving West Ham and Stratford stations. All stations will be able to accommodate 3-car trains. An important part of the project is to build new platforms at Stratford for the North London Line so that the site of the current platforms (1 and 2) is available for the new DLR platforms.

As part of the Transport & Works Act (TWA) application, the Beckton branch Royal Victoria station will be extended to accommodate 3-car trains. The opportunity will also be taken to provide a third platform to enable trains to reverse there. This now possible due to the closure of the eastern arm of the North London line which means the additional land necessary has become available.

The first contract for construction work was awarded on 10 January 2007[31] and construction work started in mid-2007.

[edit] Upgrading other lines to 3-car trains

Status - Transport & Works Act approval given[32]

When work to allow 3-car trains between Bank and Lewisham is complete, the only two parts of the network unable to take 3-car trains will be Poplar to Stratford and Poplar to Beckton. Approval has been given for upgrading those two sections between 2008 and 2010 and for further grade-separation at Delta Junction north of West India Quay to allow enable all routes to operate without the present conflict between services to Stratford and from Bank; however, southbound services from Bank will be unable to stop at West India Quay due to the removal of the outer platform. This will, however, permit possible new services from Beckton and Woolwich to terminate at Canary Wharf or Lewisham.

However TfL have stated that due to lack of committed funding the Beckton branch would not be upgraded to 3-car operation at the moment.[33]

[edit] Dagenham Dock extension

Status - TWA Submitted - Expected Completion - 2017

This proposed extension from Gallions Reach to Dagenham Dock via the riverside at Barking, would connect the Barking Reach area, a formerly industrial area now undergoing major redevelopment as part of the London Riverside, with the Docklands. It would cover major developments at Creekmouth, Barking Riverside, Dagenham Dock Opportunity Area, and five stations are planned at Beckton Riverside, Creekmouth, Barking Riverside, Goresbrook (formerly Dagenham Vale) and Dagenham Dock. The extension is key if English Partnerships' plan is to work. As shown in DLR's first consultation leaflet,[34] there are plans for the DLR to extend further than Dagenham Dock, possibly to Dagenham Heathway or Rainham.

Construction is not expected to start until 2013 and the earliest expected completion date is 2017.[35]

[edit] Thames Wharf station

Status - Proposed

This station had been included as potential future development on the London City Airport extension since it was first planned. It would be between Canning Town and West Silvertown, due west of the western end of Royal Victoria Dock. Since the station's intended purpose is to serve the surrounding area (currently a mix of brownfield and run-down industrial sites) when it is regenerated, the development is indefinitely on hold due to the area being safeguarded for the Silvertown Link, a new Thames river crossing proposed for opening by 2015.[36]

[edit] Connaught Road / Silvertown Interchange station

Status - Proposed

A site near to London City Airport has been identified as a possible additional station on the London City Airport extension. It would be a possible interchange with Crossrail, between London City Airport and Pontoon Dock. However, no plans have emerged as to when this station is to be planned and built. The original extension was designed to allow a station to be built here. It may be located south of the Connaught Crossing.[37]

[edit] Charing Cross extension

Status - Proposed - 2026

In February 2006 a proposal to extend the DLR to Charing Cross station from Bank DLR branch was revealed.[38] The idea, originating from a DLR "Horizon Study", is at a very early stage at the moment, but would involve extending the line from Bank in bored tunnels under Central London to the Charing Cross Jubilee line platforms, which would be brought back to public use. These platforms are now on a spur off the current Jubilee line and are not used by passenger trains.

While not confirmed it is probable that the scheme would also use the existing overrun tunnels between the Charing Cross Jubilee platforms and a location slightly to the west of Aldwych. These tunnels were intended to be incorporated into the abandoned Phase 2 of the Fleet Line (Phase 1 became the original Jubilee Line, prior to the Jubilee Line Extension). However they would need some enlargement because DLR gauge is larger than tube gauge and current safety regulations would require an emergency walkway to be provided in the tunnel.

The two reasons driving the proposal are capacity problems at Bank, having basically one interchange between the DLR and the central portion of Underground, and the difficult journeys faced by passengers from Kent and South Coast between their rail termini and the DLR. Intermediate stations would be at City Thameslink and Aldwych, for future connection with the Cross River Tram.

[edit] Euston/King's Cross extension

Status - Proposed

During the last Horizon study, a possible extension was considered from Bank towards Euston or King's Cross.[39] The main benefit of this extension will be tapping into an area that doesn't have a direct link to the Canary Wharf site, either existing or proposed. This would create a new artery in central London and help relieve the Northern and Circle lines. There are no official plans for possible stations except towards Farringdon, possibly using some of the soon-to-be-disused Thameslink infrastructure.

[edit] Works contingent on Crossrail

Status - Proposed

If Crossrail is approved some of the track between Bow Church and Stratford would need to be moved to the south. The opportunity would then be taken to double the track throughout and eliminate the only significant section of single track on the system.[38]

The current route projections for the cross-London Crossrail Line 1 entail interchanges with the DLR at Custom House, Stratford, and the provision for interchanges at West India Quay (with Crossrail Isle of Dogs station) and London City Airport (with Crossrail Silvertown station). Another option would be to provide an interchange with a possible new station on the DLR (see Connaught Road/Silvertown Interchange station section above).[40]

[edit] Lewisham to Catford extension

Status - Proposed - 2026

This extension was looked at during the latest Horizon Study. The route would follow the Southeastern line and terminate between Catford station and Catford Bridge station. However early plans showed problems due to Lewisham DLR station being only marginally higher than the busy A20 road which impedes any proposed extension. The plan is however being revised.[41] When the Lewisham extension was first completed there were proposals to continue further to Beckenham to link it up with the Tramlink system. However, the way in which Lewisham DLR was built impeded this possible extension and would prove costly to redevelop.

[edit] See also

[edit] References

  1. ^ Technology. Docklands Light Railway. Transport for London. Retrieved on 2007-08-29.
  2. ^ The Docklands Light Railway, London, UK. h2g2. BBC. Retrieved on 2007-08-29.
  3. ^ Transport for London (2007) Docklands Light Railway carries 60 million passengers Retrieved April 5, 2007
  4. ^ Transport for London (2007-08-07). "DLR 20th anniversary competition winners to get inside track". Press release. Retrieved on 2008-02-23.
  5. ^ Various route options for the London Underground dating from the 1960s to 1980s. London Docklands Development Corporation. Retrieved on 2007-04-17.
  6. ^ a b Docklands Light Railway Official Handbook, Stephen Jolly and Bob Bayman (1986) ISBN 0 904711 80 3
  7. ^ a b c Docklands Light Railway (2005). Facts, with 13 stations. Retrieved February 26, 2006.
  8. ^ Options for the DLR Beckton Extension route. Retrieved on 2008-02-23.
  9. ^ Transport for London (2007-07-03). "Docklands Light Railway draws up public arts strategy". Press release. Retrieved on 2008-02-23.
  10. ^ Transport for London (2007-04-04). "Docklands Light Railway carries 60 million passengers". Press release. Retrieved on 2008-02-23.
  11. ^ London Docklands Light Railway; Northern Line's Dot-Matrix Indicators RISKS Digest Volume 5 Issue 29 Article 3, 13 Aug 1987
  12. ^ Report on the Docklands Light Railway Accident Which Occurred at Island Gardens Station on 10 March 1987, Modern Railways, May 1987
  13. ^ "'Unauthorised Tests' Caused DLR Crash", Modern Railways, June 1987
  14. ^ Railway automation, Stephen Colwill, RISKS Digest Volume 5 Issue 23 Article 4, 31 Jul 1987
  15. ^ Computer's Normal Operation Delays Royal Visit, Mark Brader, RISKS Digest Volume 5 Issue 52 Article 2, 29 Oct 1987
  16. ^ "Opening of the Docklands Light Railway," Roger Ford, Modern Railways, September 1987
  17. ^ Another commuter train wreck in London, Jonathan I. Kamens, RISKS Digest Volume 11 Issue 52 Article 1, 23 Apr 1991
  18. ^ Computer-controlled commuter trains collide in east London, UPI report relayed by ClariNet news service, 22 Apr 1991
  19. ^ Re: Trains collide in east London, Ian G Batten, RISKS Digest Volume 11 Issue 54 Article 10, 25 Apr 1991
  20. ^ Railway Technology (2006) Docklands Light Railway (DLR) Extensions, London, United Kingdom Retrieved 23 November 2006
  21. ^ Press release on opening first new platform at Stratford
  22. ^ New Docklands Light Railway station opens at Langdon Park
  23. ^ New Docklands Light Railway station opens at Langdon Park
  24. ^ Docklands Light Railway (2005). DLR Development Projects Retrieved February 23, 2006.
  25. ^ Transport for London (2008-03-13). "Games transport legacy put in place as Mayor unveils new Docklands Light Railway carriages". Press release. Retrieved on 2008-03-13.
  26. ^ Tunnel extending Docklands Light Railway to Woolwich completed
  27. ^ Docklands Light Railway. (2005). DLR Capacity Enhancement. Retrieved February 26, 2006.
  28. ^ London Connections blog on work at Mudchute
  29. ^ Extra carriage on every DLR train
  30. ^ Plans submitted to the City of London
  31. ^ Major contract award signals start of work on DLR Stratford International Extension
  32. ^ Transport Briefing DLR platform extensions secure T&W Act approval
  33. ^ Docklands Light Railway to increase capacity by 50 per cent with three-car trains
  34. ^ DLR Barking Riverside consultation document (pdf). Retrieved on 2008-02-23.
  35. ^ TfL Board meeting papers February 2008 (pdf). Retrieved on 2008-02-13.
  36. ^ AlwaysTouchOut.com (2005). Silvertown Link Retrieved February 24, 2006.
  37. ^ AlwaysTouchOut.com (2006). DLR to City Airport. Retrieved February 26, 2006.
  38. ^ a b Ian Allan Publishing. Modern Railways. March 2006.
  39. ^ Chapter 5: Major Transport and Regeneration Projects, item 5.6.3
  40. ^ AlwaysTouchOut.com (2006). Crossrail. Retrieved February 23, 2006.
  41. ^ Always Touch Out DLR to Catford

[edit] External links

Wikimedia Commons has media related to:


West: Crossings of the River Thames East:
Greenwich foot tunnel Lewisham branch,
between Island Gardens
and Cutty Sark
Jubilee line
between Canary Wharf
and North Greenwich
Woolwich foot tunnel Woolwich branch,
between King George V
and Woolwich Arsenal
(under construction)
Thames Gateway Bridge
(planned)