Danbury and Norwalk Railroad
From Wikipedia, the free encyclopedia
Danbury and Norwalk Railroad | |
---|---|
Locale | Danbury, CT to Norwalk, CT |
Dates of operation | 1852–1887 |
Predecessor line | Fairfield County (1835-1850) |
Successor line | Danbury Branch of: Housatonic (1887-1892) NYNH&H (1892-1969) Penn Central (1969-1976) ConnDOT (owner 1971-) MNCR (passenger 1983-) Conrail (pass. 1976-1983)[1] |
Track gauge | 4 ft 8½ in (1435 mm) (standard gauge) |
Headquarters | South Norwalk[2] |
D&N R.R. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Info | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Type | Pass. & freight (steam) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operation | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | D&N | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Danbury and Norwalk Railroad was an independent American railroad that operated between its namesake cities in Connecticut from 1852 until its absorption by the Housatonic Railroad in 1887. The right of way established by the D&N continues in operation and is now known as the Danbury Branch of the New Haven Line of the Metro-North Railroad.
Contents |
[edit] History
[edit] 1835-1852
The Danbury and Norwalk Railroad was chartered May 1835 as the Fairfield County Railroad[3]. The objective of the railroad was to build from Danbury to somewhere on Long Island Sound. The backers wanted to end Danbury's isolation.[3] Professor Alexander C. Twining of Yale University was hired to conduct a survey. Several options were researched, and Professor Twining recommended the route following the Norwalk River. This route would come through Norwalk and South Norwalk, and terminate on the shores of the Long Island Sound at Belden's Point. It was longer than other options, but the total travel time to New York City was shorter, because less travel over water was needed. The railroad was initially planned as a horsedrawn railroad.[3] As financing the project was a problem, attention was paid to the area north of Danbury, along the Housatonic River. If these places would be connected, more options would come available to financing the railroad. A survey was performed By Mr. E H. Broadhead. This route would connect Danbury by a 70 mile route with the Western Railroad at West Stockbridge, Massachusetts. Then in 1836 the Housatonic Railroad Company was chartered in Bridgeport. Danbury was offered a subscription to the new railroad for $100,000, but Danbury declined. The Housatonic Railroad started building its railroad, bypassing Danbury, and going north along the route that was surveyed for the Fairfield County Railroad. On May 29, 1850 the charter of the Fairfield County Railroad was again renewed, but the name was changed to the Danbury and Norwalk Railroad. On June 7, 1850 the company was organized with Eli T. Hoyt as president. The surveyed route to Norwalk from Danbury was built, but not the extension to Belden's Neck. The railroad would connect to the New York & New Haven in South Norwalk. On February 25, 1852 the railroad opened to regular service. A simple schedule of two trains in each direction was run each day, one mixed and one passenger train. The initial dividend at the end of the first year was 5.25%.
[edit] 1853-1872
An additional passenger round trip was added to the schedule. The railroad was making a good profit. The railroad did not have any competitors along its road. These resulted in slow speeds and high profits. In 1862 the Norwalk Horse Railway Company was formed with Edwin Lockwood as president. This company would connect South Norwalk with Norwalk. This would take revenue away from the railroad. The response of the D&N was to compete. To make its track suitable for horse drawn carriages, boards were placed between tracks. In April 1862 operation between Norwalk (Wall Street) and South Norwalk started with small cars. The next year, nine steam or horse-drawn trains would run between these two stations. But by 1863 the horse railway was operational and was a major success. Higher frequencies, lower fares and more stops were pleasing the public. The D&N withdrew its service quickly thereafter.
In 1864 Edwin Lockwood became president of the D&N. The Lockwoods were major stockholders in the railroad and natives of Norwalk. A line from Danbury to Brookfield was considered. It would have given the D&N an important connection. But another railroad was already organised to build along the right of way needed by the D&N. The New York, Housatonic & Northern was opened between Danbury and Brookfield in 1868. During construction there was a connection between the D&N and the NYH&N, but it was torn up after construction finished.
In 1869 construction of the branch from Branchville (formerly Ridgefield) to Ridgefield started. The 4 mile branch was very difficult to construct due to the steep climb needed to reach Ridgefield. On June 25, 1870 the first trains started running, and the official opening was held on July 1, 1870.
In Spring 1872 a branch between Bethel and Hawleyville was started. It allowed for connections with the Shepaug Valley Railroad, Housatonic Railroad, and eventually the Boston, Hartford and Erie Railroad once it was completed through Hawleyville. There were plans in which the D&N would be a link in a railroad connecting New York and Boston, but these died with LeGrande Lockwood, the nephew and financial backer of Edwin Lockwood, in 1872.
[edit] 1872-1886
In 1873 the railroad was running six locomotives, which all were running on coal. Three of them were new and three were converted from wood. On June 18th, 1873 Roswell Pettibone Flower became president of the railroad. Even through the depression the railroad was kept into good shape and investments were being made. The railroad remained a very modern one. Plans for further extensions were put aside, and focus was on improving the lines already present. 56 Pound steel was replacing iron rails. The best iron rails were being used to relay yards and sidings. Also the branches were improved with the old iron rails. In 1879 all passenger cars were equipped with air brakes. In 1880 a tract of land in Redding was bought. It was already used for religious camps. The railroad promoted it as an ideal place for a day in the country. The summer resort attracted quite a lot of passengers, most of which were moved on regular trains. The schedule called for three passenger trains and a freight train in each direction on the mainline. Three trips were made on the Ridgefield Branch. The Hawleyville branch was operated by the Shepaug Valley Railroad. An additional train started running between Bethel and Danbury, which provided service for the large number of commuters between these two towns, working in the factories near the Danbury yard. In 1881 James W. Hyatt succeeded Roswell P. Flower as president. Just before the take over plans were started to build the final stretch from South Norwalk to Belden's Point. This would give the railroad a direct connection with New York City and other points along the Sound by means of ferries. Construction started quickly and on July 4th, 1882 the pier was opened. The new pier was an enormous boost to traffic on the line. Trains were running 24 hours a day. Just after completion of the pier James W. Hyatt was succeeded by F. St. John Lockwood. The new pier made the D&N a very interesting railroad to take over. On October 1st, 1886 the D&N would become the Danbury & Norwalk Division of the Housatonic Railroad, by means of a 99 year lease. This was 8 years after the first proposal by the Housatonic Railroad.
[edit] 1886 and later
The Housatonic Railroad relayed tracks between Hawleyville and Bethel with steel track. Housatonic trains were now routed towards Wilsons Point instead of Bridgeport. The D&N division was getting busier every year. Especially when the NY & NE started diverting its traffic towards Wilsons Point after it lost its original connection with New York City. The Housatonic Railroad leased the D&N starting July 21, 1887. Around 1891 the Long Island Rail Road and the New York and New England Railroad started running the Long Island and Eastern States Express which connected the LIRR's Oyster Bay Branch via ferry to the D&N at Belden's point and proceeded to Hawleyville for connections to the New York and New England Railroad with service to Boston.[4][5]
On July 21, 1892 the Housatonic Railroad was taken over by the New York, New Haven and Hartford Railroad. The D&N was subsequently leased to the NYNH&H. Later on there was an exchange in stocks, and the NYNH&H owned the D&N outright. The NYNH&H merged into Penn Central in 1969. On January 1, 1971, the State of Connecticut leased passenger and freight operations on the Danbury Branch to Penn Central.[6] The state contracted with the federally formed Consolidated Rail Corporation (Conrail) to operate freight and passenger service on the line from 1976 until the cessation of Conrail passenger service in 1983.[1] Conrail freight service on the line ended in 1993.[1]
The Connecticut Department of Transportation now owns the D&N line. Freight service is provided by the Providence and Worcester Railroad since 1993 also by a newly formed Housatonic Railroad. With the formation of Metro-North Railroad in 1983 the D&N became the Danbury Branch of that railroad's New Haven Line.[7]
[edit] Rolling Stock
[edit] Locomotives
The D&N owned a total of 13 locomotives, all of which were 4-4-0. There were never more than 7 locomotives operated at a given time.
Number | Name | Date built | Builder | Builder Number | Cylinder size | Driving Wheel | Sold/Retired | Housatonic Number | NYNH&H Number | |
---|---|---|---|---|---|---|---|---|---|---|
1 | 1 | Danbury | September 15 1851 | Hinkley Locomotive Works (Boston Locomotive Works) | 337 | 14x20" | 60" | Sold 1868 | ||
2 | 2 | Norwalk | September 24 1851 | Hinkley Locomotive Works (Boston Locomotive Works) | 343 | 14x20" | 60" | Retired 27 June 1873 | ||
3 | 3 | Winnepauk | February 28 1853 | Hinkley Locomotive Works (Boston Locomotive Works) | 427 | 15x20" | 60" | Retired before 1882 | ||
4 | 4 | Ridgefield | 1859 | unknown | unknown | unknown | unknown | Retired 1876 | ||
5 | 5 | Bethel | 1866 | Danforth Locomotive & Machine Works | 15x22" | 66" | Retired 1884 | |||
6 | 6 or 7 | Lockwood | Mid summer 1868 | Danforth Locomotive & Machine Works | 15x22" | 66" | Number 6 became 45 | Number 6 became 495 | ||
7 | 7 or 6 | Wilton | 1869 | Danforth Locomotive & Machine Works | 15x22" | 60" | Number 6 became 45 | Number 6 became 495 | ||
8 | 4 | Norwalk | June 27 1873 | Danforth Locomotive & Machine Works | 893 | 15x24" | 43 | 493 | ||
9 | 3 | R. P. Flower | 1876 | Danforth Locomotive & Machine Works | 1054 | 16x24" | 63" | 42 | 492 | |
10 | 1 | Emma | Probably 1882 | Danforth Locomotive & Machine Works | 63" | 40 | 490 | |||
11 | 2 | James W. Hyatt | Mid 1882 | Cooke Locomotive and Machine Works | 1367 | 17x22" | 63" | 41 | 491 | |
12 | 5 | Eli T. Hoyt | 1884 | Cooke Locomotive and Machine Works | 1595 | 18x24" | 44 | 494 | ||
13 | 7 | Danbury | Spring 1886 | Cooke Locomotive and Machine Works | 1714 | 17x24" | 69" | 46 | 496 |
[edit] Passenger Cars
In 1858 the railroad had 4 coaches. It went up to 6 in the early 1870s and finally reached 8 in the 1880s. Number 5 of these had a monitor roof. The road had 2 baggage cars in 1870. The number of merchandise cars had risen from 48 to 62 in 1870.
[edit] Freight Cars
The following data is from the 1888 ORER, after the take over by the Housatonic Railroad.
Kind of Car | Numbers | Length | Width | Height | Capacity | Number of Cars |
---|---|---|---|---|---|---|
Box, even Nos * | 2 to 36 | 26 | 7.6 | 6.2 | 24000 | 16 |
Flat, odd Nos | 1 to 143 | 30 | 20000 | 73 | ||
Gondola | 145 | 30000 | 1 | |||
Stake Flat | 151, 155 | 2 | ||||
Gondola, odd Nos | 153, 157 to 197 | 30 & 36000 | 22 | |||
Derrick | 199 | 1 | ||||
Gondola, odd Nos | 201-225 | 30 | 8 | 3 | 45000 | 12 |
Gondola, odd Nos, Hopper Bottom | 227 to 255 | 24 | 8 | 3.6 | 46000 | 15 |
Total | 141 |
[edit] Routes
[edit] Main line
South to North
Stop | Type | Opened* | Description |
---|---|---|---|
Wilsons Point | Station | July 1882 | Pier giving transfer to ferries. |
South Norwalk | Station | Interchange with NY&NH until 1872, NYNH&H thereafter | |
Norwalk | Station | ||
Catherine Street | Flag stop | Norwalk Fairgrounds[1] | |
Winnepauk/Winnipauk | Station | ||
South Wilton | Flag stop | Appeared as "Kent", "Kent Road", or "Norwalk Mills" in some schedules[3] | |
Wilton | Station | Original station building was moved to the southeastern intersection of Rt. 7 and Rt. 33 to serve as a retail building[3] | |
Cannon/Cannondale | Station | ||
Georgetown | Station | The Gilbert and Bennett wire company (founded 1818) was a significant freight customer[8] | |
Branchville/Ridgefield (before branch opened) | Station | Interchange with the branch to Ridgefield. | |
Sanford/Sanford's Station | Flag stop | also known as Topstone[1] | |
Redding | Gave access to the resort | ||
Bethel | Station | Start of Hawleyville branch in 1872 | |
East Danbury | Flag stop | ||
Danbury | Union station | Interchange with NY&NE and the Housatonic |
- only if opened after rest of line in 1852.
[edit] Ridgefield Branch
This branch opened July 1, 1870 from Branchville on the main line and had one terminal station at Ridgefield as well as two flag stops along the way at Florida and Cooper. Trains generally consisted of two cars. One passenger car, plus a combination car for baggage, express and mail. Freight cars were added as needed. Ridgefield had a one stall engine house and a turntable. The Ridgefield Branch was abandoned by the NYNH&H in 1964.[1]
[edit] Hawleyville Branch
There was only one flag stop along this branch. It had a siding as well. At Hawleyville there was an interchange with the New York and New England Railroad. The Hawleyville interchange was in addition to the one at Danbury. At Hawleyville connections could be made to the rest of the Housatonic (Bridgeport to the south, Massachusetts to the north) as well as the Shepaug Railroad (to Litchfield northeast). The Hawleyville Branch was abandoned by the NYNH&H in 1911 and was one of the first line abandonments of that road.[1]
[edit] See also
- Danbury Branch discuss later operations on this line
- Fairfield County Railroad was the company that preceded the Danbury and Norwalk Railroad company
- List of New York, New Haven and Hartford Railroad precursors
[edit] References
- ^ a b c d e f g h Ronald Dale Karr (1995). The Rail Lines of Southern New England, A Handbook of Railroad History. Branch Line Press. ISBN 0-942147-02-2.
- ^ The New Haven Railroad Historical and Technical Association, The Danbury Line publications (English). Retrieved on 2008-03-04.
- ^ a b c d e L. Peter Cornwall (1987). In The Shore Line's Shadow, The six Lives of the Danbury & Norwalk Railroad, pp. 132. Littleton, MA: Flying Yankee Enterprises. ISBN 9780961557447
- ^ New York and New England Railroad
- ^ History of the Long Island Rail Road
- ^ http://www.prrths.com/Hagley/PRR1971%20Jun%2005.pdf PRR Chronology from June 2005
- ^ Danbury Branch Electrification Feasibility Study (English). Retrieved on 2008-03-03.
- ^ History of Gilbert & Bennett Manufacturing Co. in Pictures. Retrieved on 2008-04-29.
|