Charles M. Braga Jr. Memorial Bridge

From Wikipedia, the free encyclopedia

Braga Bridge
Braga Bridge
The Braga Bridge as seen from Somerset, MA
Official name Charles M. Braga Jr. Bridge
Carries I-195
Crosses Taunton River
Locale Somerset and Fall River, Massachusetts
Design Cantilever bridge
Longest span 840 ft (256.0 m)
Total length 5,780 ft (1761.7 m)
Width 101.3 ft (30.88 m)
Clearance below 135 ft (41.1 m)
Opening date 1965, 1989
Coordinates 41°42′23.62″N, 71°09′56.51″W

At just over a mile long, the Braga Bridge , also known as the Charles M. Braga Jr. Memorial Bridge, is one of the longest bridge structures in Massachusetts. It carries Interstate 195 over the Taunton River between the town of Somerset and the city of Fall River. It is a Cantilever bridge with a Warren Truss-type main span.

Construction of the bridge started in 1959 and finished in the spring of 1966. The bridge was constructed to carry I-195 across the Taunton River on its way west to Providence. The total span of the bridge is 5,780 feet and it goes 135 feet over high water in the Taunton River to accommodate a high-traffic shipping lane in the river. It is approximately 101 feet wide, wide enough to accommodate six lanes of traffic. It is named after Charles M. Braga, a Fall River native of Portuguese American descent who died in the attack on Pearl Harbor.

Bridge and Fall River Waterfront
Bridge and Fall River Waterfront

As the Braga Bridge approached its 25th anniversary in 1989, the Massachusetts Department of Public Works (MassDPW) undertook a comprehensive two-year rehabilitation of the span and approaches. The project included the replacement of the existing deck with a new lightweight deck overlaid with bituminous concrete. Construction crews repaired and repainted structural steel along the length of the mile-long span, a new concrete Jersey barrier was built in the center median, and "suicide fences" were built along the span.

In 2003, the Massachusetts Highway Department began what was to be a three-year, $9 million rehabilitation of the Braga Bridge. The scope of the work was similar to that of the 1989-1990 project, but the new top concrete layer of roadway was given a latex additive that resists water seepage and thus reduces cracking. Originally scheduled for completion in 2005, the end of the project was first re-scheduled for 2006 because of delays associated with the nearby Government Center project along I-195 in Fall River. As of May 2007, the Braga Bridge rehab remains far from complete, as does the Government Center rehab that delayed it.