Central Link
From Wikipedia, the free encyclopedia
This article or section contains information about a proposed, planned, or expected public transportation infrastructure in the United States. It may contain information of a speculative nature and the content may change dramatically as the construction and/or completion of the infrastructure approaches, and more information becomes available. |
Central Link | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
The first trains on a test run in the tunnel. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Info | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Light rail | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Link Light Rail | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Under construction | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Terminals | Sea-Tac Airport Westlake Center |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
No. of stations | 4 (10 under construction) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operation | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | July 2009 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Sound Transit | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Sound Transit | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | Underground, at grade, elevated | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 15.7 mi (25 km) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
No. of tracks | 2 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Gauge | 4 ft 8½ in (1,435 mm) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | Overhead catenary | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 55 mph (89 km/h) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Central Link is a 15.7-mile (25.3 km) light rail line running between downtown Seattle and Seattle-Tacoma International Airport in SeaTac, Washington. It is currently under construction, and represents the initial phase of the Sound Transit agency's Link Light Rail system.
Contents |
[edit] Routing
The southern terminus of Central Link at Sea-Tac Airport will be an elevated station lying north of the parking garage. The garage's return-to-terminal ramps have been demolished to make way for the light rail station.
The route travels north on a grade separated viaduct/bridge along the North Airport Expressway, crosses over State Route 518, travelling on the north side of the highway. It then runs alongside Interstate 5, SR 599, Interurban Blvd., and Boeing Access Rd..
Entering Seattle proper, the line becomes an at-grade surface route on Martin Luther King Jr. Way S through the Rainier Valley. When it nears Franklin High School the route again becomes grade separated, rising on an elevated bridge before entering a tunnel through Beacon Hill, leading to another elevated section through the SoDo district. The route then joins the E-6 Busway (formerly 5th Avenue S) as a grade separated surface route.
Central Link trains will then enter the transit tunnel, sharing the right-of-way with diesel-electric hybrid buses. The route ends at Convention Place Station near the intersection of Pine Street and 9th Avenue.
Future plans for Central Link call for extending the route north from Convention Place in a tunnel to the University of Washington, and then to Northgate, and eventually to Lynwood and Everett. In the south it would be extended to S. 200th Street, approximately 3,000 meters beyond the airport station, and eventually to Federal Way and Tacoma.
[edit] Stations
Name | Opening Year | City/Neighborhood | Location | Other | |
---|---|---|---|---|---|
Central Link (Airport-Downtown Seattle) | |||||
Elevated | |||||
Sea-Tac Airport | 2009 | Seatac | North of parking garage | pedestrian bridges to main terminal & kiss-and-ride center at Int'l Blvd | |
Tukwila Int'l Blvd | 2009 | Tukwila | SR 518 & Int'l Blvd | 600-space park & ride lot; free shuttles to/from the airport until Airport section is complete | |
Boeing Access Road | N/A | Tukwila | I-5 & Boeing Access Rd | station deferred indefinitely | |
Surface (Martin Luther King Jr. Way) | |||||
Rainier Beach | 2009 | Rainier Valley, Seattle | MLK Jr. Way & S Henderson St | ||
Othello | 2009 | New Holly, Seattle | MLK Jr. Way between S Othello St & S Myrtle St |
||
Columbia City | 2009 | Columbia City, Seattle | MLK Jr. Way between S Edmunds St & S Alaska St |
||
Elevated | |||||
Mount Baker | 2009 | Mount Baker, Seattle | MLK Jr. Way & Rainier Ave | ||
Tunnel | |||||
Beacon Hill | 2009 | Beacon Hill, Seattle | Underground station at Beacon Ave S & S Lander St |
||
Surface | |||||
SODO | 2009 | SoDo, Seattle | SODO Busway & S Lander St | ||
Stadium | 2009 | SoDo, Seattle | SODO Busway & S Royal Brougham Way |
larger platform to serve Safeco Field and Qwest Field | |
Downtown Seattle Transit Tunnel | |||||
International District | 1989 | International District / Chinatown, Seattle |
under Union Station | ||
Pioneer Square | 1989 | Pioneer Square, Seattle | under 3rd Ave & Cherry St | ||
University Street | 1989 | Downtown Seattle | under 3rd Ave & University St | ||
Westlake Station | 1989 | Downtown Seattle | under Pine St & 4th Ave | connections to monorail and streetcar. | |
End of line; future extension (University Link) |
[edit] Equipment
Kinkisharyo-Mitsui was chosen to design and manufacture low-floor light rail vehicles and provide additional equipment and support. Thirty-five Electric Multiple Units are to be delivered between November 2006 and September 2008. As of June 2008, twenty-five of these vehicles are at the facility and many are testing in Seattle, with additional vehicles in final assembly in Everett. Each vehicle is 95 feet (30 m) long, accommodate 200 people each (74 seated), and double-ended to allow travel in either direction. Two-car trains will be used initially, but as ridership increases, can run up to four-cars long. The maximum speed of the light rail vehicle is 65 mph (105 km/h). Sound Transit will operate these vehicles at a maximum and cruising speed of 55 mph (89 km/h), with an estimated end-to-end travel time of 30 minutes over the 15.7 mile route.[1][2]
[edit] See also
[edit] References
- ^ Link Light Rail Train Specifications. Sound Transit. Retrieved on 2008-03-18.
- ^ Link Light Rail Fact Sheet (pdf). Sound Transit (December 2007). Retrieved on 2008-03-18.
[edit] External links
- www.soundtransit.org
- Puget Sound Transportation Projects: Seattle Link
- System Map(Project) by Sound Transit
- Photos of Sound Transit
|