User:C.Fred/Sandbox

From Wikipedia, the free encyclopedia

Contents


[edit] Georgia 400-Series Route Table

SR Signed as Notes
400 Georgia 400
401 I-75
402 I-20
403 I-85
404 I-16
405 I-95
406 I-59
407 I-285
408 I-475
409 I-24
410 US 78 / Georgia 410 Cosigned with US 78 until the merge with Georgia 10 near Stone Mountain, where 410 ends.

Was to have extended to the connector with an interchange where Freedom Parkway intersects today. The Carter Presidential Library stands in the intended path of the freeway.

411 I-185
412 ? ?
413 I-675
414 ? ?
415 I-520
416 ? ?
417 I-575 / Georgia 5 Cosigned with Georgia for its entire length.
418 ? ?
419 I-985 Cosigned with US 23 for nearly the entire route.
420 ? ?
421 I-516 Signed as Georgia 421 prior to being given Interstate status.
422 Georgia 10 Loop

[edit] Interchanges experiments

Exit Road(s) intersected Destination(s) Notes
? N.C. State Road 54 Under construction. Exit numbers for these interchanges unknown at this time.
? N.C. State Road 55
1 Image:Interstate 40.svg Interstate 40 Raleigh / Durham Westbound only - End of freeway, all traffic exit at 1A (I-40 East)
2 Aviation Parkway RDU Airport
3 Lumley Rd North Cargo, General Aviation (RDU Airport)
4 U.S. Route 70 Raleigh / Durham
7 Leesville Road
9 N.C. State Road 50 Raleigh, Creedmoor
16 U.S. Route 1 Capital Blvd Raleigh, Wake Forest Eastbound only
17 Triangle Town Blvd Eastbound only - End of freeway, all traffic exit
19 U.S. Route 401 Rolesville Under construction
21 Buffaloe Rd Under construction
24
U.S. Route 64 Bypass
U.S. Route 264
Raleigh / Knightdale
Under construction

[edit] Association football referee event summary statistics

Event games
Copa Libertadores 2006 2 9 0 2
CONMEBOL 2006 WC qualifiers 9 28 0 1
World Cup 2006 1 7 0 1
Total 12 44 0 4

[edit] I-75 citation

FIHS System Map. Florida Department of Transportation (January 1, 2006). Retrieved on 2008-02-09.