Córdoba and Huatusco Railroad

From Wikipedia, the free encyclopedia

The Córdoba and Huatusco Railroad (Ferrocarril de Córdoba a Huatusco, FCCH) was built in an effort to provide rail service to the Veracruz town of Huatusco from the Ferrocarril Mexicano (FCM) at Córdoba. Julio Limantour was an investment partner in the banking firm of Hugo Scherer Jr. and Company for many years. He was well-known in Mexico City’s business circles and abroad. Along with engineer Juan Navarro and Carlos Moricard, Limantour joined in a society to build a railroad line in Veracruz. In 1900 Navarro had acquired the rights to a railroad concession granted in 1898 to build a railroad line to run from Córdoba to Huatusco. The line was surveyed by the son of Porfirio Díaz, and 33 kilometers of 2-foot gauge rails reached Coscomatepec in 1902.

The route across the flanks of Pico de Orizaba required expensive construction. The bridge at Tomatlán was 78 meters above a tributary of the Río Jamapa; and 7 kilometers of 3.7% grade with 19 degree curves were required to reach Coscomatepec from Tomatlán. The construction of the railroad as well as the transportation of passengers, products and supplies were affected by the weather, topography, and infectious diseases, which were more prevalent near the coast. Construction was also delayed by the need for specialized equipment, some of which had to be acquired from firms in the United States and overseas. Funds were unavailable to complete the final 19 kilometers to Huatusco, and the line was sold to the Ferrocarril Mexicano in 1909 after Limantour's death.

FCM purchased three new passenger coaches for their 2-foot gauge line and transferred a Shay locomotive from their Zacatlán Branch for use as a helper from Tomatlán to Coscomatepec. Mixed trains ran through 1951 with a 26-ton 2-6-0 pulling the coaches, a 4-door boxcar as a baggage car, and a flatcar with cloth roof to shade 3rd class seating on a longitudinal bench. Rails were removed in 1953, and the locomotives were scrapped in 1954.

[edit] Locomotives

Number Builder Type Date Works number Notes
1 Baldwin Locomotive Works 2-6-0 2/1902 20092 named Elena
2 Baldwin Locomotive Works 2-6-0 2/1902 20140 named Luisa
3 Baldwin Locomotive Works 2-6-0 3/1905 25368 named Beatriz
4 Lima Locomotive Works 28-ton Shay 12/1905 1616 ex-Ferrocarril Atlamaxac #3 acquired 1910 scrapped 1945


[edit] References

  • Best, Gerald M. (1968). Mexican Narrow Gauge. Howell-North. 
  • Moody, Linwood W. (1959). The Maine Two-Footers. Howell-North. 

Julio M. Limatour http://www.lib.utexas.edu/taro/utlac/00204/lac-00204.html