Bukit Panjang LRT Line

From Wikipedia, the free encyclopedia

Bukit Panjang LRT Line
Info
Type Light rail
System Light Rapid Transit (Singapore)
Status Operational
Terminals Choa Chu Kang
Ten Mile Junction
No. of stations 14
Service routes 2
Operation
Opened 6 November 1999
Owner Land Transport Authority
Operator(s) SMRT Corporation
Rolling stock CX-100
Technical
Line length 7.8 km (4.8 mi)
Electrification Third rail
Senja LRT Station.
Senja LRT Station.
Working map of the whole Bukit Panjang Light Rapid Transit (LRT) Line
Working map of the whole Bukit Panjang Light Rapid Transit (LRT) Line

Bukit Panjang Light Rapid Transit is a 7.8 km light rail line opened on 6th November 1999 and part of Singapore's light rapid transit system. It is fully automated, and the project was contracted to Adtranz, Keppel Corporation and Gammon Construction. The line uses the CX-100 rolling stock supplied by Bombardier, and is similar to the ones used in the Singapore Changi Airport's peoplemover service during the 90s'. It is currently operated by SMRT Light Rail, a subsidiary of SMRT Corporation. A complete loop journey on the line (excluding Ten Mile Junction Station) takes 28 minutes and all stations, except Choa Chu Kang and Ten Mile Junction Stations have two opposing side platforms, like Dover and Fernvale Stations.

Contents

[edit] Stations

Station Number Station Name Notes
BP1 / NS4 Choa Chu Kang Interchange with North South Line
BP2 South View  
BP3 Keat Hong  
BP4 Teck Whye  
BP5 Phoenix  
BP6 Bukit Panjang Interchange with Downtown Line (future)
BP7 Petir  
BP8 Pending  
BP9 Bangkit  
BP10 Fajar  
BP11 Segar  
BP12 Jelapang  
BP13 Senja  
BP14 Ten Mile Junction (Shuttle Station)

[edit] Service

There are three services operating along the Bukit Panjang Line. Trains designated on Service A will ply the outer loop (clockwise) via Senja first whereas trains designated on Service B will ply the inner loop (anti-clockwise) via Petir first. Service C runs between Bukit Panjang and Ten Mile Junction. The service frequency for Service C is 20 minutes.

[edit] Issues

The operation of the Bukit Panjang LRT has experienced a lot problems. Software glitches during initial running means that there were constant delays in service (On 6th November 1999, the trains were unable to move as planned and frequently halted in between stations.), and were sometimes severe. There have been two serious accidents since its opening:

  • In 2000, two LRT trains crashed head-to-back at Phoenix Station causing minor injuries. The operator was fined S$10,000.
  • In 2002, a dislodged train wheel caused the entire shutdown of the system for six days, as it crippled the power system and the rail at the incident was damaged and had to be repaired.

There have also been over a hundred disruptions in service which stills continues today, the most recent being on 7 May 2008. The poor operation had no bearing on the operation of the Sengkang LRT Line and Punggol LRT Line being awarded to rival company SBS Transit and rival manufacturer Mitsubishi Heavy Industries as those contracts were placed pior to Bukit Panjang LRT commencing operation. Most of the problems have been addressed and ironed out since.

The Bukit Panjang LRT was operating at a loss for the first five years. This has raised complaints from the public who argue that the system is a white elephant.

It was also reported that residents were unhappy with the withdrawal of feeder bus services operating in the area since the opening of the Bukit Panjang LRT, and were further aggravated by the unreliability of the service. After lobbying to Members of the Parliament, 2 feeder services, Services 920 and 922, were reinstated.

[edit] Future Plans

Plans by the Land Transport Authority have been approved to construct a Mass Rapid Transit Station at Bukit Panjang Station as part of the Downtown MRT Line, to connect Marina Bay and the eastern corridor of Singapore. The station is slated to be complete by 2015.

Wikimedia Commons has media related to:

[edit] External links