BTS Skytrain

From Wikipedia, the free encyclopedia

Bangkok Skytrain
Locale Bangkok, Thailand
Transit type elevated metro
Began operation December 5, 1999
System length 23 km
No. of lines 2
No. of stations 23(12+)
Daily ridership 400,000
Track gauge 1,435 mm (4 ft 8½ in) (standard gauge)
Operator(s) Bangkok Mass Transit System Public Company Limited

Bangkok Mass Transit System (BTS) or Skytrain (Thai: รถไฟฟ้า) is the elevated metro system in Bangkok, Thailand, operated by Bangkok Mass Transit System Public Company Limited (BTSC) under a concession granted by the Bangkok Metropolitan Administration (BMA). With 23 stations along 2 lines, it was opened on December 5, 1999 by HRH Princess Maha Chakri Sirindhorn. The Sukhumvit line runs northwards and eastwards, terminating at Mo Chit and On Nut respectively; the Silom line plies Silom and Sathon, the Central Business District of Bangkok, terminating at the National Stadium and Saphan Taksin (Taksin Bridge). The lines interchange at Siam station and have a combined route distance of 23 km. The Skytrain is formally known as the Elevated Train in Commemoration of HM the King's 6th Cycle Birthday (รถไฟฟ้าเฉลิมพระเกียรติ 6 รอบ พระชนมพรรษา) because it was opened to the public on HM King Bhumibol Adulyadej's 72nd birthday.

Bangkok also has an underground railway system called the MRT or unofficially the Metro.

Contents

[edit] History

Skytrain approaching Sala Daeng Station
Skytrain approaching Sala Daeng Station
Interior of a Bangkok Skytrain.
Interior of a Bangkok Skytrain.


The MRT system was initially referred to as the Lavalin Skytrain because it was to be designed using the Vancouver SkyTrain as a model adopting the technology developed by SNC Lavalin. Due to political interference, the concession with Lavalin was cancelled in 1992, in spite of Bangkok's chronic traffic congestion. The Thai Government focused on increasing road and expressway infrastructure in an attempt to combat congestion. However, this had less than the desired impact as the number of cars on the road increased dramatically. The lines considered under the skytrain project became later the basis for the Bangkok Metro system and interesting enough are mainly underground.

In the early 1990s, foundations for the Lavalin Skytrain were constructed in the middle of two bridges spanning the Chao Phraya river. The Taksin bridge now supports the under-construction Silom line to Thon Buri, scheduled be completed by June 2007 [1]. The supports at Phra Pokklao bridge remain unused but may be utilised as part of the MRT's future Purple Line.

Shortly after the it became clear that the Lavalin Skytrain was stalled, then-governor Major-General Chamlong Srimuang asked his deputy Krisda Arunvongse na Ayutthaya to create a new feeder system with a route along Sukhumvit and Silom Rd. Krisda, who in the same period was elected governor, and his team from BMA managed to find an investor to build it. Krisda also convinced all to let the city supervise the project. The investor founded Bangkok Transit System Corporation and this company successfully financed the system and grew it from a feeder system to a full mass transit project. Siemens as supplier of the railway technology and the Thai contractor Italian Thai Development built the system for BTSC.

The 'Skytrain' name was given to the system later by the press. It stuck and will likely be kept even though the portion of system through the historic Rattana Kosin island will one day be below grade.

Originally, the Skytrain depot was to be built in Lumphini Park, but due to widespread objections from Bangkok residents it was constructed on a parcel of land located along Phahon Yothin Road, replacing the old Northern/Northeastern bus terminal (Mo Chit). The current depot at Mo Chit is a part of the proposed 'Bangkok Terminal' project, where a large complex comprising a new regional bus terminal, park & ride facility and other commercial development can be built directly above it.

Thanayong Public Company Limited (Thai บริษัท ธนายง จำกัด (มหาชน)) had a 28.21% stake in BTSC when the Skytrain began, and therefore in its early days the system was sometimes referred to as the "Thanayong Skytrain".

The Skytrain initially had lower-than-predicted ridership, with 200,000 passenger trips per day. Ticket revenue was only enough to meet the trains' operating cost, and not sufficient to service construction loans. However, the Skytrain's daily passenger numbers have steadily increased since then. On December 9, 2005, more than 500,000 single trips were made on the Skytrain in a single day for the first time. BTSC is currently planning to purchase more trains and is studying the possibility of putting 6-car trains into service. The company will implement a contactless ticketing system in 2006, allowing both BTS and MRT passengers to use their RFID smart cards as joint tickets starting in 2007.

[edit] Station layout

Bangkok rail network (including BTS MRT and AirportLink) in the near future
Bangkok rail network (including BTS MRT and AirportLink) in the near future
A train at the platform of Saphan Taksin station.
A train at the platform of Saphan Taksin station.
The upper platform at Siam interchange station, for trains heading towards National Stadium on the Silom Line and Mo Chit on the Sukhumvit Line.
The upper platform at Siam interchange station, for trains heading towards National Stadium on the Silom Line and Mo Chit on the Sukhumvit Line.

All the stations to the skytrain are elevated. The platforms are built to accommodate trains of six cars, but trains of only three cars are in operation.

The first elevated level of the stations is accessed with stairs and often escalators, and contains the ticket booths, some small kiosk-like shops and access control gates. The second level (and third at Siam station) is again accessed with stairs and escalators and contains the platforms and rails. Siam station is unique in the way that it is the only BTS station with island platforms, to facilitate transfer between lines. All of the other stations have side platforms. Additionally, many stations have ramps and elevators to allow wheelchair-bound passengers to access the ticketing hall and platform from the street. The distance between doors is equal throughout the train, regardless of whether they are in the same or different cars and the locations where the doors will be after the train has stopped are marked on the platform. For security and safety, security personnel are stationed at every platform and all ticketing halls.

Three Skytrain stations, Sala Daeng, Asok and Mo Chit, are interchanges with the MRT. Saphan Taksin station is connected to the adjacent Sathon pier where the Chao Phraya Express river boat services call. Many stations are linked by 'Skybridges' (overhead pedestrian walkways) to neighbouring buildings and public amenities.

Consumption of food or drink is forbidden past the ticketing gate or on the Skytrain.

[edit] Ticketing

For single-trip and store-value ticket holders fares are calculated according to distance, but adult / student / tourist passes for limited / unlimited train rides are also available. Next to the magnetic farecards, which require replacement once every two years, the Skytrain has adopted near-field contactless technology in its ticketing system, with the intent of becoming compatible with the system presently used in the MRT.[citation needed]

[edit] Stations

[edit] Sukhumvit Line

In the table below, an italicized name on a pink background indicates that the station is the extension to current line and not yet in operation.

Code Station Name Transfer coordinates
Sukhumvit Line
N21 Saphan Mai (2010-2012)  
N20 Phaholyothin 50 (2010-2012)  
N19 Bangkhen (2010-2012)  
N18 Wat Prasri Mathadhat (2010-2012)  
N17 the 11th Infantry Regiement (2010-2012)  
N16 Bang Bua (2010-2012)  
N15 Forestry Depot (2010-2012)  
N14 Kaset (2010-2012)  
N13 Senanikhom (2010-2012) footbridge of viaduct to Meyo Hospital
N12 Ratchayothin (2010-2012) footbridge or viaduct to Major Cineplex Ratchayothin
N11 Phaholyothin 24 (Satree Warranat) (2010-2012) viaduct to Supalai condo's & Chang (Elephant) Building
N10 Lat Phrao (2010-2012) footbridge to Central Plaza Lat Phrao, Tesco Lotus & viaduct to Ho Wang highschool
N9 Vibhavadee (2010-2012)  
N8 Mo Chit Image:AB-Kreuz.svg Bangkok Metro Blue Line (Chatuchak Park Station) 13°48′9.30″N, 100°33′13.80″E
N7 Saphan Khwai 13°47′37.68″N, 100°32′59.03″E
N6 Sena Ruam (Planned)
N5 Ari 13°46′46.93″N, 100°32′40.71″E
N4 Sanam Pao 13°46′21.44″N, 100°32′31.53″E
N3 Victory Monument
(Anutsawari Chai Samoraphum)
อนุสาวรีย์ชัยสมรภูมิ
footbridge to Century Movie Plaza 13°45′45.88″N, 100°32′13.51″E
N2 Phaya Thai Image:AB-Kreuz.svg Suvarnabhumi Airport Link (2009) 13°45′24.99″N, 100°32′1.84″E
N1 Ratchathewi footbridge to the Asia Hotel 13°45′6.75″N, 100°31′53.67″E
CS Siam Image:AB-Kreuz.svg BTS Silom Line
3-level station with island platforms, named for its proximity to Siam Square; footbridge to Siam Paragon, Siam Center and Central World Plaza shopping complexes
Tourist information office
13°44′44.23″N, 100°32′3.22″E
E1 Chit Lom footbridge to Central Chitlom department store, Gaysorn (Keson) shopping mall and Central World Plaza 13°44′38.79″N, 100°32′35.15″E
E2 Phloen Chit footbridge to Wave Place 13°44′35.09″N, 100°32′56.47″E
E3 Nana Tourist information office 13°44′26.17″N, 100°33′19.43″E
E4 Asok Image:AB-Kreuz.svg Bangkok Metro Blue Line (Sukhumvit Station)

footbridge to the Sheraton Grand hotel, Times Square shopping center and Robinson department store.

13°44′13.32″N, 100°33′37.51″E
E5 Phrom Phong footbridge to The Emporium shopping mall 13°43′49.58″N, 100°34′11.03″E
E6 Thong Lo 13°43′27.28″N, 100°34′42.81″E
E7 Ekkamai Image:AB-Kreuz.svg Eastern Bus Terminal 13°43′10.41″N, 100°35′6.63″E
E8 Phra Khanong 13°42′54.70″N, 100°35′28.62″E
E9 On Nut footbridge to Tesco Lotus 13°42′20.20″N, 100°36′3.90″E
E10 Bangchak (2011?)
E11 Punnawithi (2011?)
E12 Udom Suk (2011?)
E13 Bang Na (2011?)
E14 Bearing (2011?)

[edit] Silom Line

Code Station Name Transfer coordinates
Silom Line
W1 National Stadium

(Suphachalasai Stadium)
สนามกีฬาศุภชลาศัย

footbridge to MBK Center, Tokyu department store and Siam Discovery Centre 13°44′47.45″N, 100°31′44.79″E
CS Siam Image:AB-Kreuz.svg BTS Sukhumvit Line
3-level station with island platforms, footbridge to Siam Center, Siam Paragon, Central World Plaza
13°44′44.39″N, 100°32′3.19″E
S1 Ratchadamri 13°44′21.09″N, 100°32′21.87″E
S2 Sala Daeng Image:AB-Kreuz.svg Bangkok Metro Blue Line (Si Lom Station)

footbridges to Central Silom Complex, Robinson, Thaniya Center and J-City.

13°43′42.63″N, 100°32′2.88″E
S3 Chong Nonsi Transfer to BRT 13°43′25.63″N, 100°31′46.00″E
S4 Sueksa Witthaya (Planned)
S5 Surasak 13°43′9.26″N, 100°31′17.32″E
S6 Saphan Taksin Image:AB-Kreuz.svg Chao Phraya Express Boat (Sathorn pier)
Tourist information office
13°43′7.59″N, 100°30′50.78″E
S7 Charoen Nakhon (January 2009)
S8 Wongwian Yai (January 2009)
S9 Po Nimit (2011?)
S10 South Ratchadaphisek (2011?)
S11 Wutthakat (2011?)
S12 Bang Wa (2011?)
S13 Wat Pra Du (2011?)

[edit] Route extension

No Skytrain extensions have opened since the opening of the original system. Many accuse[citation needed] the government, until recently controlled by Prime Minister Thaksin Shinawatra's Thai Rak Thai party, of stalling the Skytrain extensions in order to punish the BMA, which is controlled by the opposition Democrat Party, by doing so hoping to prevent the Democrats from gaining popularity among Bangkok residents.

In 2002 the cabinet was requested to amend a law in order to allow a private firm to finance the cost of operating the train system, while the government takes care of all the civil engineering works. On October 18, 2005, with no approval from the central government forthcoming, the BMA decided to seek to complete the 2.2 km Silom Line route extension (S7 Charoen Nakhon & S8 Wongwian Yai) using its own budget. Construction began on December 13, 2005 with completion originally expected within a year, but problems with tendering for the signalling system have repeatedly pushed back the schedule, with the opening now planned for late 2008.

The extension plan for the BTS can be summarized as follows:

[edit] Phase I

  • On Nut – Samrong (terminating at Sukhumvit Soi 119) – 8.9 km, Now, shortened to Onnut - Bearing (terminating at Sukhumvit 107, the border pole of BMA) – 5.2 km. The rest has been pushed to Phase II
  • Saphan Taksin – Wong Wian Yai (terminating at Th. Somdet Chao Phraya) – 2.2 km
  • Mo Chit – Saphan Mai – 12 km

[edit] Phase II

  • Samrong – Samut Prakan – 7.9 km (Now Bearing - Samrong - Samut Prakarn - with total distance of 10.6 km)
  • Wong Wian Yai – Bang Wa (terminating at Th. Phetchakasem) – 4.5 km
  • National Stadium – Phran Nok (terminating at Th. Charan Sanit Wong) – 6.8 km

It is estimated that most of the extension plans above will be completed by 2010 or 2012 at the latest, though political bickering has got in the way in the past.

[edit] Maps of the existing lines and proposed extension plans

[edit] See also

[edit] External links

Wikimedia Commons has media related to: