Image:Bridge6.jpg

From Wikipedia, the free encyclopedia

[edit] Summary

The view of Penang Bridge. The bridge is located between the peninsula Malaysia and the Penang island of Malaysia. Year Built : 1982

Year Completed : 1985

Project Duration : 3¾ Years

Bridge Design Name : Cable Stay Concrete Girder

Main Contractor : Hyundai Engineering & Construction. Co. Ltd, Korea

Consulting Engineer : Howard Needles & Tammen,

                              Bergendoff Intl. Inc. SA/JK(SEA)

[edit] Licensing

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeDimensionsUserComment
current09:09, 28 December 2006175×214 (12 KB)Yong1986 (Talk | contribs) (The view of Penang Bridge. The bridge is located between the peninsula Malaysia and the Penang island of Malaysia. Year Built : 1982 Year Completed : 1985 Project Duration : 3¾ Years Bridge Design Name : Cable Stay Concrete Girder Main Contractor : H)

The following pages on the English Wikipedia link to this file (pages on other projects are not listed):