Brightman Street Bridge

From Wikipedia, the free encyclopedia

Brightman Street Bridge
Brightman Street Bridge
Carries US 6
Rt. 138
Crosses Taunton River
Locale Somerset to Fall River, Massachusetts
Design two-leaf bascule bridge
Longest span 98 ft[1]
Total length 922 ft
Clearance below 27 ft
Beginning date of construction 1906
Completion date 1908
Opening date October 10, 1908
Coordinates 41°43′26.26″N, 71°09′20.51″W
The Brightman Street Bridge.
The Brightman Street Bridge.

The Brightman Street Bridge is a 922-foot long, four-lane wide drawbridge spanning the Taunton River between the town of Somerset and the city of Fall River, Massachusetts. It was authorized in 1903 by the state legislature, and building took place between 1906 and 1908, when it opened full time on October 10, 1908.

At the time of its completion, it was the widest bridge to span the Taunton River, as the Slade's Ferry Bridge, a steel swingspan bridge built in 1875 less than a quarter mile downriver, was barely a two lane bridge. It now serves as the pathway for Route 6 and Route 138 to cross the river into Fall River. Other than the one-lane Berkley-Dighton Bridge 8 1/2 miles to the north, it is the only non-highway bridge spanning the river between Fall River and Taunton. Along with the Braga Bridge, it is one of the two major crossings of the river. This has led to the bridge having vital importance anytime there is a problem on the Braga; since the northern detour takes approximately twenty miles and the southern detour (over the Mount Hope Bridge and the Sakonnet River Bridge) is over twenty-five miles, it immediately becomes the major path for people coming in and out of the city, and vice versa.

[edit] Replacement and Controversy

With the age of the bridge becoming a problem, as well as the rising costs of necessary upkeep and maintenance, talk began circulating about replacing the bridge as early as the late 1970s and early 1980s. Starting in 1983,[2] plans were put in place to replace the bridge with a new, higher and wider span 1,500 feet upriver, which would span from a proposed flyover intersection with Route 79 on the Fall River side, to a new access road through the former site of Slade's Ferry Park in Somerset. A new "official" name has never been given to this bridge, although there has been a minor campaign by the area's Portuguese community to name the bridge for Miguel Corte-Real, the Portuguese explorer who many believe explored the area in the early 16th century (as evidenced by one of the theories explaining the markings on Dighton Rock upstream).[3]

Plans were put on hold in 1989, when the Coast Guard protested the size of the opening of the bridge. Once details were worked out, work began in the late 1990s, but again with delays. This was due to money being taken away from the project for the well-over budget Big Dig project in Boston.[4] Again the work was delayed until costs could be met. A third problem arose a few years later, when inspectors questioned the quality of the cement used in the main pilings for the bridge. This caused yet more delays as inspections and tests were needed on the piers.

The most recent controversy involving the bridge does not involve the bridge work at all, but rather involves the proposed building of a LNG terminal at Weaver's Cove, just to the north of the new bridge. This project has met with fierce opposition from the surrounding community, as well as federal, state and local leaders, including Representatives James McGovern and Barney Frank, as well as Senators John Kerry and Edward Kennedy, all of whom have made appearances at various opposition rallies. The problems are twofold:

  • For one, there is the belief that LNG tankers could be targets of terrorism, as an explosion of a tanker, whether on route or in port, could cause catastrophic damage and loss of life in the community.
  • There is also the concern about LNG transportation requirements, which would involve the closing of not just the new bridge, but also the Braga Bridge, for several hours at a time, thus cutting off vital trade routes in the area.

All of this has led to a rather ironic campaign to keep the original bridge standing after the new one is completed.[5] So far the campaign has been successful in keeping the old bridge standing, but whether or not it stops the LNG terminal from being built is still undetermined.