Bellaire Bridge
From Wikipedia, the free encyclopedia
The Bellaire Interstate Toll Bridge over the Ohio River was constructed by J.E. Greiner and Company. Taking 18 months to construct, the total cost came to be about $1.5 million. Over seven million tons of structural steel was used in the construction of the bridge.
[edit] Overview
When the bridge opened on December 22, 1926, over 7,000 vehicles crossed it. A toll was required to cover the costs. A one-way trip cost 5 cents. For nearly 45 years, the toll remained unchanged. In 1971, the toll was increased to 25 cents one-way, 40 cents round trip. The bridge began losing money in 1984, so the toll was increased to 50 cents one-way, one dollar round trip.
The Ohio River crossing was closed to traffic on May 1, 1991. This was because the Ohio Department of Transportation (ODOT) needed to demolish the Ohio approach ramp to the crossing for a relocated state route 7 expressway.