Beijing National Stadium
From Wikipedia, the free encyclopedia
This article or section contains information about expected future buildings or structures. Some or all of this information may be speculative, and the content may change as building construction begins. |
Beijing National Stadium | |
---|---|
Bird's Nest | |
Location | Beijing, People's Republic of China |
Broke ground | December 2003 |
Opened | March 2008 |
Owner | Government of the People's Republic of China |
Surface | Grass |
Construction cost | 4 billion yuan (~USD $500 million) |
Architect | Herzog & de Meuron ArupSport CAG |
Tenants | Chinese Olympic Committee 2008 Summer Olympics |
Capacity | Olympic Capacity: 91,000 Post Olympic Capacity: 80,000 |
The Beijing National Stadium (traditional Chinese: 北京國家體育場; simplified Chinese: 北京国家体育场; Hanyu Pinyin: Běijīng Guójiā Tǐyùchǎng; Tongyong Pinyin: Běijīng Guójiā Tǐyùchǎng), also known as the National Stadium,[1] or the "Bird's Nest" (鳥巢) for its architecture, is a stadium finished for the Olympic Green in Beijing, China that has so far been completed as of March 2008.[2] The stadium will host the main track and field competitions for the 2008 Summer Olympics, as well as the opening and closing ceremonies. It is located east of the Beijing National Aquatics Centre.
Contents |
[edit] Design
In 2002, Government officials engaged architects worldwide in a design competition. Pritzker Prize-winning architects Herzog & de Meuron collaborated with ArupSport and China Architecture Design & Research Group to win the competition. Contemporary Chinese artist, Ai Weiwei, is the Artistic Consultant for design.[3] The ground was broken on Christmas Eve December 2003, and construction started in March 2004, but was halted by the high construction cost in August 2004 and continued again. In January 2008, concerns about construction working conditions arose when it was revealed that 2 workers had died during the stadium's construction.[4]
[edit] Capacity
The stadium can seat as many as 91,000 spectators during the Olympics. The capacity will then be reduced to 80,000 after the Games. It has replaced the original intended venue of the Guangdong Olympic Stadium[citation needed]. The stadium is 330 metres long by 220 metres wide, and is 69.2 metres tall. The stadium uses 258,000 square metres of space and has a usable area of 204,000 square metres. It was built with 36 km of unwrapped steel[citation needed], with a combined weight of 45,000 tonnes. The stadium has some 11,000 square metres of underground rooms with waterproof walls. The stadium will cost up to 3.5 billion yuan (≈423 million USD).
Upon completion, this stadium will boast a state of the art Solar PV system produced by Suntech Power[citation needed].
[edit] Events
Date | Event Held |
---|---|
May 22-25, 2008 | "Good Luck Beijing" 2008 Sohu.com China Athletics Open |
[edit] See also
[edit] References
- ^ The National Stadium - The Official Website of the Beijing 2008 Olympic Games
- ^ Photo:The Official Website of the Beijing 2008 Olympic Games
- ^ Merewether, Charles, Editor.~Essays by Jonathan Napack and Chin-Chin Yap. Ai Weiwei, Works: Beijing 1993-2003. Beijing: Timezone 8 Ltd., 2003.
- ^ China hushes up Olympic deaths - Times Online
[edit] External links
- Design competition finalists
- Design partner project site
- Beijing National Stadium Info & Gallery
- Arthur Lubow. "The China Syndrome", The New York Times Magazine, May 21, 2006. Details the architect's experience working on the stadium.
- Details of current construction
- Construction update by BCI Asia
- Stadium in Construction on Google Maps
- Hydraulics helps the Beijing’s “Bird’s Nest” to stand on its own feet
- Bird’s Nest; Herzog & de Meuron in China Documentary DVD
- Gallery
- Goldberger, Paul (June 2, 2008), “Out of the Blocks”, The New Yorker, <http://www.newyorker.com/arts/critics/skyline/2008/06/02/080602crsk_skyline_goldberger?currentPage=all>
|