Anchor (climbing)

From Wikipedia, the free encyclopedia

In rock climbing, an anchor can be any way of attaching the climber, the rope, or a load to rock, ice, steep dirt, or a building by either permanent or temporary means. The goal of an anchor depends on the type of climbing under consideration but usually consists of stopping a fall, or holding a static load.

Contents

[edit] Types of anchors

Depending on the material being climbed, there are many types of protection that can be used to construct the anchor, including natural protection such as boulders and trees, or artificial protection such as cams, nuts, bolts or pitons.

[edit] Natural anchor

A natural anchor is one that does not require man-made climbing gear. Such anchors may consist of trees, chockstones already lodged in a crack, horns and protrusions, etc.

[edit] Artificial anchor

An artificial anchor consists of man-made climbing gear placed in the rock. Such gear may be spring loaded camming devices, aluminum chockstones, steel expansion bolts, pitons, etc.

[edit] Belay anchor

A belay anchor is used as a sole attachment to the cliff face, to support a belay or toprope. It should ideally be essentially foolproof, consisting of multiple redundant components (natural and/or artificial), none of which are likely to fail, and none of which in the event of failure would cause the entire anchor to fail. Any one component of a good anchor should be able to support the entire system by itself.

[edit] Running belay anchor

A running belay anchor is used as a safeguard in the event of a fall while lead climbing. Often hastily placed in the stress of the moment, these anchors are not as secure, or bombproof as belay anchors and cannot be relied on as sole attachment points to the rock. Running belay anchors must be backed up by other running belay anchors below should they fail.

[edit] Ice anchors

The ice picket is used as an anchor in mountaineering. It is driven into the snow and used to arrest falls.

Ice picket.
Ice picket.

[edit] Attachment to the anchor

[edit] Indirect

When the rope goes from the climber to the belayer. Most often used under controlled circumstances at climbing walls or when the climber doesn't have the weight advantage on the belayer during bottom roped climbs. It is impossible to escape from the system.

[edit] Semi-direct

When the rope comes from the climber to the belayer, but the belayer is attached separately to an anchor. Often used when multi pitching and the belayer is on a stance. Or when top roping and it is possible that if the climber falls the belayer will be pulled from the stance above the climber. The belayer can, with a little effort then remove themselves from the system if required. it is essential that the belayer is attached to the anchor via the belay loop at the front of the harness. Attaching the belayers harness to the anchor via the back of the harness can cause the harness, when placed under strain constrict inwards elongating front to back, rather than side to side. This can result in crushed pelvis' and serious harm to the belayer.

[edit] Direct

When the rope comes from the climber to an anchor. A hanging belay device may be used, although it is common in this instance to just use an Italian hitch. The belayer is totally free of the system.

[edit] References

  • Long, John (1993). How to Rock Climb: Climbing Anchors. Chockstone Press, Evergreen, Colorado. ISBN 0-934641-37-4