Akhmeteli-Varketili Line

From Wikipedia, the free encyclopedia

Akhmeteli-Varketili Line
Akhmetelis Teatri
Sarajishvili
Guramishvili
Ghrmaghele
Didube
Elektrodepo
Nadzaladevi
Vagzlis Moedani
Marjanishvili
Rustaveli
Tavisuplebis Moedani
Avlabari
300 Aragveli
Isani
Samgori
Varketili
edit

The Akhmeteli-Varketili (formerly known as Didube-Samgori and Gldani-Varketili) is a line of the Tbilisi Metro. The line was part of the first stage of the Metro and currentely cuts the city on a north-south axis. The line currentely has 16 stations and 19.6 kilometres of track.

Contents

[edit] History

Segment Date opened
Dibude-Rustaveli January 11, 1966
Rustaveli-300 Aragveli November 6, 1966
300 Aragveli-Samgori May 5, 1971
Samgori-Varketili November 9, 1985
Dibude-Guramishvili November 16, 1985
Guramishvili-Akhmetelis Teatri January 7, 1989

[edit] Name changes

Station Previous name(s) Years
Akhmetelis teatri Gldani 1989-1992
Guramishvili TEVZ 1985-1992
Nadzaladevi Oktomberi 1966-1992
Tavisuplebis Moedani Leninis Moedani 1967-1992
Avlabari 26 Komisari 1967-1992

[edit] Transfers

# Transfer to At
2 Saburtalo Line Vagzlis Moedani

[edit] Rolling stock

The line is served by the Nadzladevi depot (№1), currently 19 four carriage trains are assigned to it. A mix of Е, Еzh3, Еma-502, Еm-508T as well as the newer 81-714.5, 81-717.5. All of the trains are undergoing major repairs and there is also a large carriage reserve park.

[edit] Recent developments and future plans

Due to the fact that some of the stations have been operative for over four decades, as well as neglect caused by the lack of funding during the 1990s, most of them require a major facelift and some severe repairs on hydroisolation and structure. Recently there has been progress in both directions. There are unconfirmed proposals of additional proposals, but so far Tbilisi has other projects to be realised.