Aerotrain
Locale Kuala Lumpur International Airport, Malaysia
Transit type People mover
Began operation 1998
No. of lines 1
No. of vehicles 2 CX-100 trains
No. of stations 2
Operator(s) Malaysia Airports Holdings Bhd
The interior of a KLIA Aerotrain.
The interior of a KLIA Aerotrain.

Aerotrain is a driverless people mover system located within the Kuala Lumpur International Airport in Malaysia.

It began operations in 1998 transporting carrying passengers between the Main Terminal Building and Satellite Building A. It is due to be extended to Low Cost Carrier Terminal in 2007 and other new terminals in the future. It is similar to Hong Kong International Airport's HKIA Automated People Mover.

Contents

[edit] General information

The train, is fully driverless and automated. One example, when the train reaches platform, the exit doors will open first for passengers to disembark and only in a short while, the entrance door at the other side will be open (so called Spanish solution).

Part of the train track goes underground as it passes through the taxiway above. The ride between the Main Terminal Building and Satellite Terminal A takes an estimated 5 minutes.

[edit] Facts and figures

  • Stations: 2 (Main Terminal Building ↔ Satellite Terminal A)
  • Rolling stocks: Two CX-100 trains, 3 cars per train (originally 2 cars per train).
  • Manufacturer: ADtranz
  • Capacity: 249 per car
  • Speed: 56 km/h
  • Power supply: 3-phase 600 V at 50Hz
  • Propulsion system: 100hp DC Electric Motor.

[edit] Expansions and extensions

  • Malaysia Airports Holdings Bhd (MAHB), through its wholly-owned subsidiary Malaysia Airports (Sepang) Sdn Bhd, had upgraded its Aerotrain services at the Kuala Lumpur International Airport (KLIA) by installing two additional coaches worth RM22 million.[1]
  • In November 2006, the Malaysian government announced that it had approved in principle the construction of a rail link between the Main Terminal Building and the Low Cost Carrier Terminal.[verification needed] Construction is scheduled to begin in 2007.