Union Pacific operated the largest fleet of gas turbine-electric locomotives (GTELs) of any railroad in the world. The prototype, UP50 was the first in a series built by Alco-GE for Union Pacific's long-haul cargo services. The prototype was introduced in 1948 and was followed by three series of production locomotives. They were operated into the 1970s, when rising fuel costs made them uneconomical.

Contents

[edit] Prototype

UP 50, the prototype gas turbine locomotive.
UP 50, the prototype gas turbine locomotive.

Union Pacific has long sought the biggest and best locomotives available. In the 1930s a pair of steam turbine locomotives were tried out but ultimately rejected. Even before World War II Union Pacific had been adding diesels to its roster, but these were mostly for passenger trains. The idea of lashing together four diesels to equal the power of a single steam locomotive was unappealing, so the search began for something bigger. General Electric had been building gas turbines for aircraft and proposed using something similar to create a more powerful locomotive. Union Pacific had discovered that the maintenance costs for a locomotive were independent of the locomotive's power output. Using a smaller number of more powerful locomotives would thereby save money.

Union Pacific decided that the best way for the turbine locomotives to realize their potential would be to put them on mainline freight trains. The long uninterrupted runs and relatively high speeds would keep the turbines turning at high speeds. The turbines were considered for use on the Los Angeles-Salt Lake City route, but their high noise levels resulted in them being banned from operating into Los Angeles.

Union Pacific operated the largest fleet of turbine locomotives of any railroad in the world. The turbines were used extensively; at one point Union Pacific claimed that the turbines hauled more than 10% of the railroad's freight. Their fuel economy was rather poor, as the turbine consumed roughly twice as much fuel as an equally powerful diesel engine. This was initially not a problem, since Union Pacific's turbines were fueled by Bunker C heavy fuel oil. This highly viscous fuel was far less expensive than Diesel, but difficult to handle. When cold, its consistency was likened to tar or molasses. To solve this problem, a heating apparatus was built into the fuel tenders to heat the fuel to 200 °F (93 °C) before being fed into the turbine. Soot buildup and blade erosion caused by corrosive ashes plagued all of the turbines.

The turbines were delivered in three main groups after extensive testing of the prototype. Union Pacific intended to use the turbines to replace the famous Big Boys which were about to be retired at the time.

After Union Pacific expressed interest, Alco-GE built a prototype, GE 101, which was completed in 1948. After tests in the Northeast, it was renumbered UP 50. Painted in Union Pacific Armour Yellow, UP 50 began an extensive round of tests. Union Pacific never took possession of this locomotive, however. This was one of the few internal combustion-powered locomotives used in North America that had a cab at each end. The cabs themselves resembled the FA units being built by Alco-GE at that time. The sides of the locomotive had numerous air intake louvers which could be opened and closed in varying patterns.

It was a carbody unit with a B+B-B+B wheel arrangement. The turbine produced 4800 horsepower (3.6 MW), of which 4500 hp (3.4 MW) was available for traction. This power output was more than double that of diesel-electric locomotives of that era. A small diesel engine was also installed inside the unit. This was used for moving the unit around when uncoupled and for starting up the turbine. The turbine would first be spun up to starting speed, then combustion would be started using the onboard diesel fuel supply. Once the turbine was running, the fuel supply would automatically switch to the Bunker C fuel oil. This machine weighed 500,000 pounds (230,000 kg) and was over 80 feet (24 m) long.

[edit] First Generation

UP 55, one of the first generation turbines.
UP 55, one of the first generation turbines.

Units 51 to 60 were delivered to Union Pacific beginning in 1952. These were essentially identical to the prototype except that they had cabs at only one end. These and later turbines were nearly always equipped with fuel tenders converted from old steam locomotive tenders, with a capacity of 23,000 US gallons (87,000 l). A heating apparatus was installed to make sure that the viscous fuel would flow properly. The tenders were also equipped with MU connections so that trailing diesel locomotives could be controlled as well. The turbines rarely operated alone; most usually operated with at least two diesel locomotives in their consist, as protection. Should the turbine fail en route, the diesels could be used in allowing the train to clear the main track.

UP 57 was briefly converted to burn propane and was equipped with a pressurized tank car as a tender. This fuel burned cleanly but was more difficult to transport. No other conversions were attempted.

[edit] Second Generation

UP 68, one of the second generation "veranda" turbines.
UP 68, one of the second generation "veranda" turbines.

Units 61 to 75 were delivered to Union Pacific beginning in 1954. These were visibly different from the previous generation because of the addition of external walkways on the sides of the locomotives, earning them the nickname "verandas" and making them hybrids of carbody and hood locomotives. The turbine and electrical equipment were essentially the same, though the variable side louvers were replaced by fixed ones.

[edit] Third Generation

UP 26 and 29, two of the third generation turbines.
UP 26 and 29, two of the third generation turbines.

Units 1 to 30 were delivered to Union Pacific from 1958 to 1961. These units, nicknamed "Big Blows" because of their high noise levels, were very different from the previous generations. A larger turbine produced 8500 horsepower (6.3 MW), and the unit consisted of two permanently coupled six-axle units, giving a C-C+C-C wheel arrangement. The first unit contained the cab, auxiliary diesel engine, and other control equipment. The second unit contained the turbine and electric generators. Together, the locomotive looked like an A-B set, which was reinforced by the numbers assigned to the units. The two halves of no. 19, for instance, would be numbered 19 and 19B. These turbines eventually displaced units 51 to 75 from service. There had also been problems with fuel filters clogging on the earlier turbines, so it was decided to filter the fuel before filling up the locomotive fuel tanks and the tender.

Rumors persist that the Big Blow turbines were uprated to 10,000 hp (7.5 MW). This may stem from the fact that at sea level the turbines could produce that much power. The electrical equipment, however, could only handle 8500 hp (6.3 MW). Also, the turbines in revenue service always operated above sea level. Even so, the turbine design used in these units is still the most powerful prime mover ever installed in a locomotive.

[edit] Retirement

Turbine fuel tender.
Turbine fuel tender.

Bunker C's cost advantage waned as the plastics industry began to find uses for it and improved "cracking" techniques allowed the oil (which had previously been considered waste) to be converted to lighter fuel grades. The oil crisis in the 1970s and the rise in fuel costs highlighted the inefficiency of the turbines. All were out of service by 1970. Their running gear was recycled into the GE U50 series of locomotives. Parts from units 51 to 75 were used to make the U50, and parts from units 1 to 30 were used to make the U50C.

Two of the turbines survive - UP 26 in Ogden, Utah, and UP 18 at the Illinois Railway Museum. Several of the tenders were retained and converted to hold water for use with Union Pacific's operating steam locomotives, UP 844 and UP 3985.

UP 80, the failed coal-fired turbine.
UP 80, the failed coal-fired turbine.

In October 1961, Union Pacific constructed an experimental GTEL of their own, using an Alco PA-2 as a cab, the chassis of a GE W-1 class electric locomotive (bought for scrap from the Great Northern) as the second unit, and a modified turbine prime mover from the 50 to 75 series. The setup was numbered 80, but changed to 8080 in 1965 to avoid conflict with the EMD DD35s being introduced. The bizarre-looking consist had a bizarre wheel arrangement as well: A1A-A1A+B-D+D-B, i.e. 18 axles of which 16 were powered. A "centipede" steam locomotive tender was rebuilt with a coal crusher to pulverize and feed the coal to the turbine. Power output was estimated at 7000 hp (5.2 MW). The original diesel engine in the PA was retained and produced 2000 hp (1.5 MW) and the turbine produced the additional 5000 hp (3.8 MW). The blade erosion and soot buildup problems encountered in the earlier locomotives were magnified with UP 80/8080. Grinding coal into fine particles was also troublesome. Any oversized coal particles could damage the turbine blades. Ultimately, UP 80/8080 was declared a failure, and this "contraption" was dismantled. The conventional gas turbines each racked up well over a million miles in revenue service, by comparison the coal turbine prototype ran less than 10,000 miles before being stricken from the UP roster.

UP 26 photographed by Jim Munding, all others courtesy of Don Ross