From Wikipedia, the free encyclopedia
{{{title}}} |
Specification |
Details |
Currently owned by: |
{{{owner}}} |
Operated by: |
{{{operator}}} |
Built: |
{{{dates}}} |
Builder: |
{{{builder}}} |
TOPS Numbers: |
{{{tops}}} |
Engine: |
{{{engine}}} |
Cylinder Bore: |
{{{engbore}}} |
Cylinder Stroke: |
{{{engstroke}}} |
Main alternator: |
{{{mainalt}}} |
Traction motors: |
{{{tracmotor}}} |
Maximum tractive effort: |
{{{maxeffort}}} |
Continuous tractive effort: |
{{{coneffort}}} |
Horsepower |
{{{horsepower}}} |
Horsepower at rail: |
{{{railpower}}} |
Wheel arrangement: |
{{{wheelarr}}} |
Train brakes: |
{{{brakes}}} |
Brake Force: |
{{{brakeforce}}} |
Brake Manufacturer: |
{{{brakemfr}}} |
Length: |
{{{length}}} |
Width: |
{{{width}}} |
Height: |
{{{height}}} |
Mass: |
{{{mass}}} t |
Wheel Diameter: |
{{{wheeldiam}}} mm |
Wheelbase: |
{{{wheelbase}}} |
Bogie Wheelbase: |
{{{bogiewheel}}} |
Bogie Type: |
{{{bogietype}}} |
Minimum Curve: |
{{{mincurve}}} |
Design speed: |
{{{speed}}} mph |
Maximum speed: |
{{{maxspeed}}} mph |
Fuel capacity: |
{{{fuel}}} litres |
Route availability: |
{{{ra}}} |
Electric train supply: |
{{{ets}}} |
Train Heating |
{{{heat}}} |
Multiple working: |
{{{multiple}}} |
Multiple Connectors: |
{{{multiconnect}}} |
Withdrawl/Scrapped: |
{{{withdrawn}}} |
{{Infobox UK Diesel Train Technical
| name = (name of the template page, if not on a template page leave blank)
| title =
| state = (the state the table is initially in, default is autocollapse)
| owner =
| operator =
| dates =
| builder =
| tops =
| engine =
| engbore =
| engstroke =
| mainalt =
| tracmotor =
| maxeffort =
| coneffort =
| horsepower =
| railpower =
| wheelarr =
| brakes =
| brakeforce =
| brakemfr =
| length =
| width =
| height =
| mass =
| wheeldiam =
| wheelbase =
| bogiewheel =
| bogietype =
| mincurve =
| speed =
| maxspeed =
| fuel =
| ra =
| ets =
| heat =
| multiple =
| multiconnect =
| withdrawn =
}}