Current event marker This article or section contains information about a planned or expected pipeline.
It may contain information of a speculative nature and the content may change dramatically as the construction and/or completion of the pipeline approaches, and more information becomes available.
Pipeline-small image, seen from below.jpeg

The Trans-Afghanistan Pipeline (TAP or TAPI) is a proposed natural gas pipeline being developed by the Asian Development Bank. The pipeline will transport Caspian Sea natural gas from Turkmenistan through Afghanistan into Pakistan and then to India.

The 1,680 km pipeline will run from the Dauletabad gas field to Afghanistan. From there TAPI will be constructed alongside the highway running from Herat to Kandahar, and then via Quetta and Multan in Pakistan. The final destination of the pipeline will be the Indian town of Fazilka, near the border between Pakistan and India. The pipeline will be 1,420 mm in diameter with a working pressure of 100 atm and the capacity of 33 billion cubic meter (bcm) of natural gas annually. Six compressor stations are to be constructed along the pipeline. The cost of this international infrastructure is estimated at US$3.5 billion (2005 figures). Proponents of the project see it as a modern continuation of the Silk Road. The Afghan government is expected to receive 8% of the project's revenue.

Original project started in March 1995 when inaugural memorandum of understanding between the governments of Turkmenistan and Pakistan for a pipline project was signed. In August 1996, the Central Asia Gas Pipeline, Ltd. (CentGas) consortium for construction of pipeline, led by Unocal was formed. On 27 October 1997 CentGas incorporated in formal signing ceremonies in Ashgabat, Turkmenistan by several international oil companies along with the Government of Turkmenistan. In January 1998 the Taliban, selecting CentGas over a Brazilian competitor, signed an agreement that allowed the proposed project to proceed. In June 1998, Russian Gazprom relinquishes its 10% stake in project. Unocal withdrawn from the consortium on 8 December 1998.

The new deal on the pipeline was signed on 27 December 2002 by the leaders of Turkmenistan, Afghanistan and Pakistan and in 2005 Asian Development Bank submitted the final version of feasibility study designed by British company Penspen. Signing the agreement was made possible by the invasion of Afghanistan by United States military forces a year prior, which overthrew the Taliban government controlling most of Afghanistan. Building the pipeline was cited by some critics of the Bush administration as a motivation for the invasion. Some people have even said that if you take a map of U.S. military bases in Afghanistan and a map of the proposed pipeline they are very close together, suggesting that bases are positioned to protect natural gas interests. However, since then the project has essentially stalled; construction of the Turkmen part was supposed to start in 2006, but the overall feasibility is questionable since the southern part of the Afghan section runs through territory which continues to be under de facto Taliban control.