Sydney Tar Ponds

From Wikipedia, the free encyclopedia

The Sydney Tar Ponds are a hazardous waste site on Cape Breton Island, Nova Scotia, Canada. Located on the eastern shore of Sydney Harbour in the former city of Sydney (now amalgamated into the Cape Breton Regional Municipality), the Tar Ponds form a tidal estuary at the mouth of Muggah Creek, a freshwater stream that empties into the harbour. Over the last century, runoff from coke ovens associated with Sydney Steel Corporation's (SYSCO) now-decommissioned steel mill filled the estuary with a variety of coal-based contaminants and sludge. Efforts to clean up the waterway have been dogged by false starts, delays, and political controversy. After extensive public consultation and technical study, a $400 million CAD cleanup plan, jointly funded by the Government of Canada and Nova Scotia, was announced in January 2007.

Contents


[edit] Geography

The Tar Ponds are located at 46°08.75′N 60°11.33′WCoordinates: 46°08.75′N 60°11.33′W. The North Pond and the South Pond have a combined area of 31 hectares (77 acres), and contain 700,000 metric tonnes of contaminated sediments.

Herring gulls resting on a mud flat in the South Pond of the Sydney Tar Ponds, September 2004.
Herring gulls resting on a mud flat in the South Pond of the Sydney Tar Ponds, September 2004.

The nearby coke ovens site spans 68 hectares (168 acres) on a sloping field overlooking the estuary. It contains an estimated 560,000 tonnes of contaminated soil.

A small stream, the Coke Ovens Brook Connector, connects the coke ovens with the Tar Ponds. It served as the main pathway for contaminants migrating from the coke ovens to the Tar Ponds. To the east of the coke ovens, and uphill from them, an abandoned municipal dump served as an additional source of contaminated groundwater, or leachate.

The polluted sites lie in the middle of the former city of Sydney (estimated population 25,000), now part of the Cape Breton Regional Municipality (CBRM) (2001 population 105,968).

Almost all of the contaminants derive from coal, but the Tar Ponds include two pockets containing an estimated total of 3.8 metric tonnes of polychlorinated biphenyls (PCBs).

Although often described as such, the Tar Ponds are not Canada’s largest or worst contaminated waste site. Hamilton Harbour is larger, as are several sites in the Canadian Arctic. The contaminants in the Tar Ponds and coke ovens are not unusual. Almost all result from coke production, one of the most common industrial processes of the 19th and 20th centuries.

[edit] History

In 1901, investors from Boston formed the Dominion Iron and Steel Company Limited and opened a major steel works on Sydney Harbour. Sydney had everything needed for steelmaking, including locally mined coal, nearby iron ore from Bell Island and limestone from Aguathuna (both in Newfoundland), a good harbour for shipping, and plenty of cooling water. By 1912, the mill was turning out nearly half of Canada’s steel production.

The steel mill, and the nearby coal mines that fuelled it, operated for nearly a century under a variety of owners including Dominion Steel Company (1912), British Empire Steel Corporation (1921), and Dominion Steel and Coal Corporation (DOSCO) after 1930. An economically failing DOSCO was purchased by A.V. Roe Canada in 1957, which was in-turn dissolved and its assets, including DOSCO, purchased by Hawker Siddeley Canada in 1962. By the mid-1960s, Hawker Siddeley began to close money losing subsidiaries and identified DOSCO's coal mines and steel mill as candidates for closure. By 1967, DOSCO announced plans to close the mill and began phasing out the coal mines. In response to the threatened loss of thousands of jobs in a region with poor economic prospects, the government of Nova Scotia expropriated the steel mill, renaming it Sydney Steel Corporation (SYSCO). The government of Canada expropriated DOSCO's coal mines at the same time, as well as the coke ovens that that produced the pollution flowing into the Tar Ponds, naming this operation Cape Breton Development Corporation (DEVCO). SYSCO purchased the coke ovens from DEVCO in 1973.

By the mid-1970s, the environmental movement was gaining headway in North America, and concern about pollution from the steel mill and coke ovens was rising. In 1982, scientists from the Department of Fisheries and Oceans discovered polynuclear aromatic hydrocarbons (PAHs), a family of chemicals produced by incomplete combustion of organic material, in lobster caught in Sydney Harbour near Muggah Creek. They ordered the South Arm of the harbour closed to lobster fishing, and fingered the Tar Ponds as the likely source of contamination.

The discovery increased pressure to close the decrepit coke ovens, which finally ceased production in 1988. SYSCO converted to an electric arc manufacturing process two years later, and stopped production altogether in 2000. The mill is now dismantled.

In 1986, Canada and Nova Scotia signed a $34-million agreement to dredge the Tar Ponds and pump the sediments through a mile-long pipeline to a temporary incinerator and power plant. After many delays, the incinerator was completed, and passed required air emissions tests, in 1994. However, the pipeline system proved unable to handle the thick, lumpy, Tar Ponds sludge, and the project was abandoned in 1995.

In 1996, the Nova Scotia government proposed a plan to bury the Tar Ponds under slag procured from the steel mill. By this time, the project had attracted local critics, who condemned the plan.

In 1999, the federal, provincial, and municipal governments jointly funded a community organization, the Joint Action Group (JAG), with a mandate to seek community consensus on cleanup options. The three governments also embarked on detailed environmental site assessments, and a variety of preliminary cleanup projects. Although JAG held more than 950 public meetings, no clear consensus on cleanup technologies emerged. Governments, meanwhile, generated more than 620 technical and scientific reports on the problem, and possible solutions.

[edit] Cleanup

On May 12, 2004, the Governments of Canada and Nova Scotia announced a 10-year, $400 million CAD plan to clean up the Sydney Tar Ponds and Coke Ovens. The plan (1) called for PCB-contaminated sediments to be destroyed in an approved PCB incinerator to be set up temporarily at a decommissioned industrial facility five kilometers east of the coke ovens. Remaining materials would be treated in place and then contained within an engineered containment system.

Byproducts from coke ovens that operated for 88 years on this site created run-off which contaminated the Muggah Creek estuary, creating the Sydney Tar Ponds.  The coke ovens plant was demolished in the early 1990s, leaving this empty field which will be rehabilitated as part of the Tar Ponds project.
Byproducts from coke ovens that operated for 88 years on this site created run-off which contaminated the Muggah Creek estuary, creating the Sydney Tar Ponds. The coke ovens plant was demolished in the early 1990s, leaving this empty field which will be rehabilitated as part of the Tar Ponds project.

At the Tar Ponds, treatment will consist of solidification and stabilization, a process by which contaminated sediments are mixed with Portland cement powder or similar hardening agents. At the coke ovens, contaminated soils will be treated with a form of bioremediation known as land farming, in which hydrocarbon-eating bacteria and nutrients are tilled into the upper surface of the soils. The sites will then be contained within a layered cap and impermeable sidewalls, and then landscaped for as yet undetermined future use.

A special operating agency of the Nova Scotia government, the Sydney Tar Ponds Agency, will manage the cleanup on behalf of the two governments, in partnership with the Department of Public Works and Government Services which is the lead federal agency. Fifteen community groups in such fields as environment, health, business, labour, religion, recreation, municipal government, and higher education, contribute delegates to a Community Liaison Committee that serves as a sounding board for project managers during the cleanup.

[edit] Controversy

Establishing a cleanup plan for the Tar Ponds and coke ovens site has taken more than 22 years. Hundreds of volunteers contributed more than 100,000 hours to the Joint Action Group's search for acceptable cleanup options. JAG and its government partners have attracted vocal critics, most prominently the Sierra Club of Canada. Delays in getting the project started have left many residents frustrated.

Opinions divide on the best cleanup method. Some residents favour digging up and destroying all of the contaminants. Others prefer not to disturb the contaminated material at all. The Sierra Club of Canada opposes plans to incinerate the PCB materials in favour of novel destruction technologies such as hydrogen reduction and soil washing. Project managers say the community has asked that only proven technologies be used.

In 2005 and 2006, the Sydney Tar Ponds Agency has undertaken four preliminary cleanup projects, including the re-routing of the Coke Ovens Brook Connector to a less contaminated area, and the construction of a rock barrier at the boundary between the Tar Ponds and Sydney Harbour. The preliminary projects are intended to prevent further environmental damage while the larger cleanup is assessed.

In July, 2006, the environmental engineering firm EarthTech, Ltd., completed a preliminary engineering design for the big cleanup. A contract for the final engineering design and construction oversight is expected to be awarded by September, 2006.

[edit] Environmental Impact Assessment

Through the winter of 2005, controversy raged as to the type of environmental impact assessment the Government of Canada should require for the Tar Ponds cleanup. The choice boiled down to the two most rigorous forms of assessment allowed under the Canadian Environmental Assessment Act(2): a comprehensive study, conducted by remediation experts within Public Works and Government Services Canada, and a panel review, conducted by a group of experts from outside government, who would hold formal public hearings.

The Government of Nova Scotia, the Cape Breton Regional Municipality, and a broad coalition of local business, labor, and health organizations favored a comprehensive study, which has half as many steps as a panel review. They argued that after 950 public meetings and 620 technical reports, the issue had been studied and debated enough, and it was time to get on with the cleanup.

The Sierra Club of Canada favored a panel review as the only way to ensure necessary scrutiny of plans to incinerate PCB contaminated material, and to guarantee consideration of alternative technologies. Residents did not like the incineration method at all, saying that the PCBs will only get into the air for the whole community to breath in.

On May 2, 2005, federal Environment Minister Stéphane Dion and Public Works Minister Scott Brison sided with the Sierra Club, ordering a panel review. In the face of predictions that the decision would delay the cleanup and add to its cost, Dion directed the panel to complete its work by June 30, 2006, and not to make recommendations that would drive cleanup costs beyond the $400 million Ottawa and Nova Scotia had already committed.

The province reluctantly agreed to participate, and the joint panel review held three weeks of sparsely attended hearings in April and May, 2006. The panel planned to report by July 13, 2006.

[edit] Solution

After decades of study, the federal and Nova Scotia governments say the best way to deal with the notorious Sydney tar ponds is to bury the whole mess. In January 2007, officials from Ottawa and the province announced a $400-million plan to solidify the toxic sludge using the Solidification / Stabilization (S/S) with Cement method. Eventually the area will be covered with a plastic sheet, soil and finally grass. This technology was preferred over a controversial proposal to incinerate some of the 700,000 tonnes of oozing stew that includes raw sewage, polycyclic aromatic hydrocarbons, heavy metals, dioxins, PCBs and other toxins. This is the fourth time since the early 1980's that government officials have come forward with a major, multimillion-dollar plan to clean up the two ponds, the ugly products of a century of steelmaking.

Environmentalists and local residents were worried officials would incinerate some of the material, but that won't happen. Federal and provincial officials said the plan they've chosen should stabilize the 100-hectare site without producing any adverse health or environmental effects.

[edit] Notes

Note (1):Project Description—Remediation of the Sydney Tar Ponds and Coke Ovens Sites—executive summary. AMEC Earth and Environmental, 2004.

Note (2):Canadian Environmental Assessment Act ( 1992, c. 37 )

Note (3):Hansard: Debates and Proceedings of the Nova Scotia House of Assembly, Fifty-Ninth General Assembly – First Session - page 6766.

[edit] References

[edit] External links