Rum Jungle, Northern Territory

From Wikipedia, the free encyclopedia

The Rum Jungle uranium deposit in the Northern Territory, Australia was found in 1949. It is 65 kilometres south of Darwin on the East Finniss River.

Contents

[edit] Original uranium mine

In 1952 the Australian Government funded the setting up of a mine and treatment plant to provide uranium oxide concentrate to the UK-US Combined Development Agency under a contract which ran from 1953 to 1962. Rum Jungle was then the largest construction in the Northern Territory. The Government, through the Australian Atomic Energy Commission, was responsible for the mine, although management of it was on a contract basis by Territory Enterprises Pty Limited, a subsidiary of the Rio Tinto Group. A town was built at Batchelor to accommodate the mining personnel, 8 km south of the mine.

[edit] Pollution and cleanup

The mine closed in 1971. The Federal Government (who controlled the mine through its agency the Australian Atomic Energy Commission (AAEC), now known as Australian Nuclear Science and Technology Organisation (ANSTO)) decided not to rehabilitate the mine site. The mining company Conzinc (now part of the Rio Tinto Group, who own Energy Resources of Australia (ERA), operators of the Ranger Uranium Mine in Kakadu National Park) have consistently denied any responsibility for rehabilitation. This led to the mine becoming one of Australia's worst polluter owing to oxidation of sulphides by bacteria and the subsequent release of acid and metals into the East Finniss River. The 1500 mm annual rainfall coupled with the pyritic mineralisation in the area created ideal conditions for such oxidation.

An initial attempt to clean up Rum Jungle was made in 1977, which led to the setting up of a working group to examine more comprehensive rehabilitation. A $16.2 million Commonwealth-funded program got under way in 1983 to remove heavy metals and neutralise the tailings.

One of the principal problems associated with rehabilitating the Rum Jungle Creek South (RJCS) open cut was that the area was converted to a lake after mining ceased, and as the only water body in the Darwin region not infested with crocodiles, the site quickly became very popular with locals and Darwin residents as a recreation reserve. After mining, the area suffered elevated external gamma levels, alpha-radioactive dust and significant levels of radon daughters in prevailing air. These levels were so high that in the late 80s it was finally admitted that something had to be done. Radiation protection standards were being revised, so that the levels of pollution would now be officially recognised as unsafe for human health. As a result, a supplementary $1.8 million program to improve Rum Jungle Creek South waste dumps was undertaken in 1990.

[edit] Brown's Oxide Project

In December 2001, Compass Resources lodged a Referral under the EPBC Act with Environment Australia (which is now DEH). That document referred to the proposed development of a large-scale mining project, the Browns Polymetallic Project, that would produce lead, cobalt, copper, nickel and silver over a project life of at least 15 years. As indicated in the 2001 Referral, Compass considered that the Browns Polymetallic Project was a ‘nuclear action’ under the EPBC Act, on the basis that the project could be considered to include rehabilitating a facility or area in which mining or milling of uranium ore has previously been undertaken. [1]

Compass suspended its work on the polymetallic proposal in 2002 when low metal prices caused the withdrawal of Compass’s financial partner (Doe Run). [2]

In 2005, Compass lodged an application for a much smaller project focussing on cobalt, nickel and copper mining. Because this project, the Brown's Oxide Project is much smaller than the polymetallic project proposed previously, Compass is in a position to progress it on its own.

The Northern Territory Government has completed assessing this project and Ms Marion Scrymgour MLA, Minister for Natural Resources, Environment and Heritage in the Northern Territory Government has advised that she has concluded that the Browns Oxide Project as proposed in the Public Environmental Report and subsequent documents "can be managed without unacceptable environmental impacts"

The Hon. Kon Vatskalis MLA Minister for Mines and Energy announced this approval as "good news" during question time in the Northern Territory Parliament on 4 May 2006. To ensure the environment is managed properly, this approval and its recommendations is subject to final review by the Commonwealth Government under a bilateral agreement between the Northern Territory Government and the Commonwealth of Australia. [3]

Pending final Commonwealth approval, the project is set to be in production by early 2007.

While the project is located near the old Rum Jungle mine, the Browns Oxide Project is targeting copper cobalt and nickel—not uranium. Nonetheless, Compass makes no secret that at some future point it would be interested in mining uranium at the nearby Rum Jungle site (over which it holds a lease). Any proposal to mine uranium would require a totally new application and environmental assessment as a separate project.

[edit] References

  1. ^ http://www.nt.gov.au/nreta/environment/assessment/register/brownsoxide/index.html
  2. ^ http://kakadu.nt.gov.au/pls/portal30/docs/FOLDER/TOPENDSECRET/ATTACHMENTS/AMCJFeb06lowres.pdf
  3. ^ http://aspect.comsec.com.au/asxdata/20060505/pdf/00612091.pdf

[edit] External links

Coordinates: 12°59′S 131°01′E