Orange Line (MBTA)

From Wikipedia, the free encyclopedia

Inbound Train at North Station
Inbound Train at North Station
Outbound Train at North Station
Outbound Train at North Station
The old Main Line Elevated and related lines
The old Main Line Elevated and related lines
Orange Line
Handicapped/disabled access Oak Grove
Handicapped/disabled access Malden Center
Handicapped/disabled access Wellington
Handicapped/disabled access Sullivan Square
Handicapped/disabled access Community College
Handicapped/disabled access North Station
Handicapped/disabled access Haymarket
Handicapped/disabled access State
Handicapped/disabled access Downtown Crossing
Handicapped/disabled access Chinatown
Handicapped/disabled access NE Medical Center
Handicapped/disabled access Back Bay
Handicapped/disabled access Mass Ave
Handicapped/disabled access Ruggles
Handicapped/disabled access Roxbury Crossing
Handicapped/disabled access Jackson Sq
Handicapped/disabled access Stony Brook
Handicapped/disabled access Green Street
Handicapped/disabled access Forest Hills

Old Main Line Elevated stations
Everett - Sullivan Square
Thompson Square
City Square - North Station
Tunnel (Haymarket to Chinatown)
Dover - Northampton - Dudley
Egleston - Green - Forest Hills

The Orange Line is one of the four subway lines of the MBTA. It extends from Forest Hills in Jamaica Plain, Boston in the south to Oak Grove in Malden, Massachusetts in the north. It meets the Red Line at Downtown Crossing, the Blue Line at State, and the Green Line at Haymarket and North Station. It connects with Amtrak and Commuter Rail service at Back Bay and North Station, and just the commuter rail at Ruggles station in Roxbury.

Contents

[edit] History

The current name is derived from Orange Street,[citation needed] an old name for the section of Washington Street immediately south of downtown under which the Washington Street Tunnel, forming the center of the line, still runs. (Cars throughout the Boston rapid transit network were formerly painted orange or with orange stripes by MBTA predecessors, and restored streetcars on the Ashmont-Mattapan High Speed Line wear their historical orange livery, but this is largely coincidental.)

The Main Line of the electric Boston Elevated Railway opened in segments in 1901. It proceed from Everett along the Charlestown Elevated to the Canal Street Incline near North Station. It was carried underground by the Tremont Street Subway (now the Green Line) returning above ground at the Pleasant Street Incline (now closed, located just outbound of Boylston Station). A temporary link connected it to the Washington Street Elevated, which in 1901 ran from this point via Washington Street to Dudley Square (which is most of what is now Phase 1 of the Silver Line).

Also in 1901, the Atlantic Avenue Elevated opened, branching at Causeway Street to provide an alternate route through downtown Boston (along the shoreline, where in 2007 there is no rail transit) to the Washington Street Elevated.

In 1908, the Washington Street Tunnel opened, allowing Main Line service to travel via new portals at the Canal Street Incline, under downtown, and back up again to meet the Washington Street Elevated and Atlantic Avenue Elevated near Chinatown. Use of the Tremont Street Subway was returned to streetcars exclusively.

By 1909, the Washington Street Elevated had been extended to Forest Hills. Trains from Washington Street were routed through the new subway, either all the way to Everett, or back around in a loop via both the subway and the Atlantic Avenue Elevated.

At some point, the southern connection between South Station and Washington Street was closed, breaking the loop. By 1938, the entire Atlantic Avenue Elevated had been closed, leaving only the subway routing through downtown - the core of what is now the Orange Line.

Ownership of the railway was transferred from the private Boston Elevated Railway to the public Metropolitan Transit Authority (MTA) in 1947, reconstituted as the modern Massachusetts Bay Transportation Authority in 1964.

The Boston Transportation Planning Review looked at the line in the 1970s, considering extensions to the beltway Route 128 with termini at Reading in the north and Dedham in the south. The first actual realignment was in 1975, when the Charlestown Elevated was demolished. The Haymarket North Extension rerouted the Orange Line through an underwater crossing of the Charles River, with a terminus in Malden, Massachusetts instead of Everett.

Construction of Interstate 95 into downtown Boston was cancelled in 1972 after local protest over the necessary demolition. However, the Southwest Corridor through Roxbury had already been cleared. Instead of a highway, the Orange Line subway would be re-routed into the corridor. In April 1987, the Washington Street Elevated south of the Essex (Chinatown) station was closed. Coming out of the southern end of the Washington Street Tunnel, instead of rising into elevated tracks, it instead veered west at the Massachusetts Turnpike and followed the Pike and the old Boston and Albany Railroad right-of-way to the existing MBTA Commuter Rail stop at Back Bay. It then continued along new tracks, partially covered and partially open but depressed, to Forest Hills. This right-of-way is also shared by Amtrak as part of the national Northeast Corridor.

While ending up more or less in the same place, the new routing bypassed Washington Street significantly to the west; local residents were promised replacement service. This would not come until 2002, when Phase 1 of the Silver Line bus rapid transit was added to connect Washington Street to the downtown subways. This was controversial, as many residents had been hoping for the return of rail transportation.

The old Orange Line El was the train seen in the opening sequence of the television program St. Elsewhere. During the last season, however, the Washington Street El no longer existed, and its showing was thus anachronistic.

Haymarket and North Station received major renovations during the Big Dig in the 1990s and 2000s, as the Causeway Street elevated portion of the Green Line was buried, its physical connection to the Orange Line was improved to make transfers easier, the Canal Street Incline was finally closed, and the Green Line was re-rerouted through a new portal closer to the river, near the Zakim Bunker Hill Bridge.

[edit] Station listing

Station Time to Downtown Crossing (min)[1] Opened Transfers and notes
Handicapped/disabled access Oak Grove 15 March 20, 1977
Handicapped/disabled access Malden Center 13 December 27, 1975 Commuter Rail, Haverhill/Reading Line
Handicapped/disabled access Wellington 10 September 6, 1975
Handicapped/disabled access Sullivan Square 7 April 7, 1975 originally a station on the Charlestown Elevated closed April 4, 1975
Handicapped/disabled access Community College 5 April 7, 1975
Handicapped/disabled access North Station 3 April 7, 1975 Green Line and Commuter Rail north side lines
Handicapped/disabled access Haymarket 2 November 30, 1908 Green Line
originally Friend-Union until January 25, 1967
Handicapped/disabled access State 1 November 30, 1908 Blue Line
originally Milk-State until January 24, 1967
Handicapped/disabled access Downtown Crossing 0 November 30, 1908 Red Line, Green Line and Silver Line
originally Winter-Summer until January 22, 1967, then Washington until May 3, 1987
Handicapped/disabled access Chinatown 2 November 30, 1908 Silver Line
originally Boylston-Essex until February 10, 1967, then Essex until May 3, 1987
Handicapped/disabled access New England Medical Center 3 May 4, 1987 Silver Line
Handicapped/disabled access Back Bay 6 May 4, 1987 Commuter Rail, Providence/Stoughton Line, Framingham/Worcester Line, Franklin Line and Needham Line
also called Back Bay/South End
Handicapped/disabled access Massachusetts Avenue 8 May 4, 1987
Handicapped/disabled access Ruggles 9 May 4, 1987 Commuter Rail, Providence/Stoughton Line, Franklin Line and Needham Line
Handicapped/disabled access Roxbury Crossing 10 May 4, 1987
Handicapped/disabled access Jackson Square 12 May 4, 1987
Handicapped/disabled access Stony Brook 14 May 4, 1987
Handicapped/disabled access Green Street 16 May 4, 1987 originally a station on the Washington Street Elevated closed April 30, 1987
Handicapped/disabled access Forest Hills 18 May 4, 1987 Commuter Rail Providence/Stoughton Line, Franklin Line and Needham Line
originally a station on the Washington Street Elevated closed April 30, 1987

[edit] Equipment

The Orange Line is standard gauge heavy rail. The current fleet is the 01200 series, built 1980-1981 by Hawker Siddeley Canada Car and Foundry (now Bombardier Transportation) of Fort William, Ontario, Canada. They are 65 feet (20 meters) long and 111 inches (2.8 meters) wide, with three pairs of doors on each side. They are based on the PA3 model used by PATH in New Jersey. There are 120 cars, numbered 01200-01319. These units are expected to remain in service until 2015.[1]

All in-service trains run in six-car configurations. A train's conductor generally rides in the booth at the head-end of the 5th car, although occasionally he or she rides in the booth at the head-end of the 4th car. At either terminus, if a train is remaining in-service, the operator generally does not turn it around at the nearby yard--the train will arrive, unload and then begin loading for the next run, meanwhile the operator control of the train simply reverses to the opposite end and the conductor is repositioned in the appropriate booth. Thus, throughout most of the day, if not the entire day, the direction of the configuration does not change. Here are a few examples of six-car configurations:

  • 01288-01289-01315-01314-01309-01308
  • 01245-01244-01315-01314-01227-01226 (more recent)
  • 01213-01212-01215-01214-01204-01205
  • 01237-01236-01271-01270-01303-01302
  • 01234-01235-01298-01299-01202-01203

As with most heavy rail rapid transit systems, configurations generally only change when a car or cars need to be singled out for maintenance purposes. Otherwise, ideally, all cars would be serviced at the same time.

[edit] Accessibility

All stations on the Orange Line are handicapped accessible, though State is not fully accessible on the Blue Line.

Massachusetts Bay Transportation Authority (official site)
Red Line AlewifeAshmont / Braintree ––– Ashmont-Mattapan High Speed Line: AshmontMattapan
Green Line LechmereBoston College ("B") / Cleveland Circle ("C") / Riverside ("D") / Arborway (Heath Street) ("E") ––– Watertown ("A")
Orange Line Oak GroveForest Hills ––– Charlestown ElevatedAtlantic Avenue ElevatedWashington Street Elevated
Blue Line WonderlandBowdoin
Silver Line Dudley SquareDowntown Crossing; South Station – various points
Buses List - Crosstown Buses - Former Streetcars - Trackless Trolleys - Key Routes - East Boston Area - South Boston - Urban Ring
Commuter Rail GreenbushOld Colony Lines (MBTA) FairmountProvidence/StoughtonFranklinNeedhamFramingham/WorcesterFitchburgLowellHaverhill/ReadingNewburyport/Rockport - North-South Rail Link
Miscellaneous AccessibilityBoat serviceCharlieCardNomenclature
Predecessors Boston Elevated RailwayEastern Massachusetts Street RailwayMiddlesex and Boston Street Railway

[edit] Notes

  1. ^ From MBTA website, roughly interpolated by distance between stations.

[edit] External links