Newlincs EfW facility
From Wikipedia, the free encyclopedia
The Newlincs EfW facility is an incinerator which is located in Grimsby, North East Lincolnshire. The plant is operated by Cyclerval UK & TIRU Group under a PFI contract. The engineering of the facility is unusual as it consists of an oscilating kiln handling 56,000 tonnes of waste per year/7 tonnes per hour of waste. The facility is capable of generating 3.2MW electricity.[1]
[edit] See also
[edit] External links
[edit] References
- ^ Your Energy Your Waste, www.newlincs.com, Retrieved 22.02.07