In Belgium, the N4 is the old road from Brussels to Arlon, passing Wavre, Namur, Marche-en-Famenne and Bastogne.
N4    M4
Destinations (E to W)
On route / bypassed / bypassed by M4

* Single carriageway or 2+1 bypass due for completion 2007 (except Carrick-on-Shannon).

† Inner relief road

‡ Roosky itself is in County Roscommon.

 Curlews Bypass
Curlews Bypass

The N4 road is a National Primary Route in the Republic of Ireland, running from Dublin to the northwest of Ireland and Sligo Town. The N6 road to Galway diverges from this route after Kinnegad, while the N5 road to Castlebar and Westport diverges at Longford town. The section of the N4 that is motorway standard is designated the M4 motorway.

Contents

[edit] Road Standard

The road is a dual carriageway from Heuston Station, Dublin to Mullingar (including the motorway section). This section of road intersects with the M50 motorway at Junction 7. The Liffey Valley Shopping Centre is located at this junction. It has three lanes and a bus lane in each direction between the M50 and east of Lucan. The speed limit was initially 40mph (60 km/h from January 2005) after its upgrade in 1999, despite the quality of the road. In June 2005, the speed limit was increased to 80 km/h.

After the motorway section (see below) ends west of Kinnegad, a low quality dual carrigeway connects the M4 with the Mullingar bypass. This section has median crossings, at grade junctions, and in one section no hard shoulder. The Mullingar bypass is however grade separated and to near-motorway standard. The road becomes a dual carriageway again through Sligo town.

[edit] M4 Motorway

J11; N6/M4 junction.
J11; N6/M4 junction.

The section from west of Lucan to west of Kinnegad is now the M4 motorway, also dubbed the Leixlip-Maynooth-Kilcock Bypass (phase 1) and the Kinnegad-Enfield-Kilcock Motorway during its construction. The second section of the M4 opened on 12 December 2005 (see thumbnail). A toll of €2.60 for cars is charged at a toll plaza near Enfield (thus is it possible to drive on parts of the M4 without having to pay a toll). Eurolink operate this toll scheme, the first in Ireland not operated by NTR plc. Currently NTR plc and Eurolink are in a dispute over Eurolink's failure to accept NTR's EazyPass electronic toll system on the M4.

Eurolink were slammed in the July 1st 2006 edition of the Meath Chronicle when a Meath County Councillor claimed that large sections of the new motorway had to be replaced within 6 months of the road being officially opened.

“It is clear from an early stage of planning and construction that the principle criterion in the entire project was to get the road built as cheaply and as quickly as possible to start generating revenue,” Colr Carey, of Fine Gael, claimed.

He said that he feared shortcuts were taken and corners cut in haste to start collecting tolls. “Any legitimate queries raised during the construction were dismissed as crank or not addressed at all.”

The paper claims up to 10% of the €420 million road project had "to be ripped up and replaced".

On September 19th 2006, Eurolink were announced preferred tenderer for the M3 motorway also in County Meath.

The bypassed road (formerly the N4), has been reclassified as the R148 road.

[edit] Motorway Route

M4 motorway
Length 34 miles
55 km
Direction East - West
Start Lucan
Primary destinations Leixlip
Kilcock
Enfield
End Kinnegad
Construction dates 1994 - 2003 - 2005
Motorways joined 1 -
M6 motorway

There are no junctions 4-7, though it is possible that these numbers will be later re-assigned to the existing junctions 2-3, with these numbers then possibly re-assigned to the Lucan interchange and the yet to be constructed Esker interchange on the N4. Currently, Junction 2a is the only motorway junction number in the Republic of Ireland to have a letter, as it was constructed later between the present junctions 2 and 3. The Mullingar bypass also has junction numbers, though these begin again at J9 and appear to be numbered according to the original scheme.

M4 Motorway
Westbound Junction Eastbound
Start of motorway 2 Leixlip, Celbridge R148
Leixlip West, Celbridge West 2a Leixlip West, Celbridge West
Maynooth, Clane, Naas 3 Maynooth, Naas
Kilcock, Clane R407 8 Kilcock, Clane R407
Toll plaza
Enfield, Edenderry R402 9 Enfield, Edenderry R402
Kinnegad R401 10 Kinnegad R401
Galway, Athlone N6 11 No exit - traffic joins from M6
Kinnegad 12 Start of motorway regulations

[edit] Future upgrades

Work has begun on upgrading the N4/M50 interchange to a fully grade separated interchange. For more details, see the M50 motorway article.

While no further motorway projects are at present planned on the N4, it is planned to upgrade the road between the M50 and Leixlip to fully grade separated standard, similar to the improved N7 Naas Road scheme. The road will be widened to three lanes in each direction also. However this is currently in the early planning stages.

[edit] References


National primary roads of the Republic of Ireland
N1(M1) - N2 - N3(M3) - N4(M4) - N5 - N6(M6) - N7(M7) - N8(M8) - N9(M9) - N10 - N11(M11) - N12 - N13 - N14 - N15 - N16 - N17 - N18 - N19 - N20 - N21 - N22 - N23 - N24 - N25 - N26 - N27 - N28 - N29 - N30 - N31 - N32 - N33 - M50
Roads in Ireland - National secondary roads - Regional roads
See also: National Development Plan, National Roads Authority