MS Monarch of the Seas
From Wikipedia, the free encyclopedia
Monarch of the Seas | |
Career | |
---|---|
Flag | Norway |
Port of Registry: | Oslo |
Maiden Voyage: | November 17, 1991 |
Status: | in service |
General Characteristics[1] | |
Builder: | Chantiers de l’Atlantique; St. Nazaire, France |
Gross Tonnage: | 73,941 gross tons |
Displacement: | 47,508 tonnes |
Length: | 268.33 m (880 ft, 4 in) |
Beam: | 32.20 m (105 ft, 8 in) waterline |
Draft: | 7.55 m (24 ft 9 in) |
Power: | 21,840 kW |
Propulsion: | Two controllable pitch propellers rear; two thrusters each side forward |
Speed: | 22 knots (25.3 m/h) |
Complement: | 2,744 passengers |
MS Monarch of the Seas is the second of three Sovereign class cruise ships owned and operated by Royal Caribbean International. She was built in 1991 at the Chantiers de l'Atlantique shipyards in Saint-Nazaire, France.
At 73,941 gross tons, Monarch was one of the largest cruise ships in the world at time of her completion. She can carry up to 2,744 passengers. Her godmother is Lauren Bacall.
Monarch has an outdoor basketball court, two shuffleboard courts, and a rock climbing wall, which is marketed as an exclusive feature of Royal Caribbean International. There are also two full-sized salt water pools.
[edit] Accidental Grounding
After evacuating a sick passenger at Philipsburg, St. Maarten, the Netherland Antilles on December 15, 1998, Monarch of the Seas grazed a reef while departing. The ship started taking water and began to sink by the head. Three of her watertight compartments were completely flooded and several others partially flooded. She was intentionally grounded on a sandbar to prevent further sinking. All passengers were evacuated and no lives were lost. A small fuel spill resulted as well as severe damage to the ship. A joint investigation by the Norwegian Maritime Investigator and the United States Coast Guard found that the accident was due to “…a myriad of human performance deficiencies.”[2]
The ship was drydocked for repairs for three months at Atlantic Marine’s Mobile, Alabama facilities. One-hundred fourteen of the ship’s compartments had to be cleaned. The work also included the replacement of machinery, 460 tons of shell plating, and 18 miles of electrical wiring.
[edit] References
- ^ Llloyd's Register of Ships, 1992 Spplement
- ^ http://www.uscg.mil/hq/g-m/moa/boards/monarch.pdf