Interstate 270 (Ohio)

From Wikipedia, the free encyclopedia


Interstate 270
Auxiliary route of the Interstate Highway System
Length: 54.97 mi[1] (88 km)
Formed: Late 1950s (Completed in 1975)
Beltway around Columbus, Ohio
Major
junctions:
I-71 (north)
I-70 (west)
US 33
US 23
I-71 (south)
I-670
I-70 (east)

Interstate 270 (abbreviated I-270) is the beltway loop freeway in the Columbus metropolitan area, commonly known locally as the Outerbelt. The "western" (and "eastern") terminus of I-270, at least in terms of the zero-milepost, is at the junction with Interstate 71 east of Grove City, Ohio. I-270, along with Interstate 670, provides access to Port Columbus International Airport. The entire length of I-270 is 54.97 miles (88.47km).

Contents

[edit] History

Planning for an outerbelt around Columbus began in the late 1950s. The outerbelt was completed in stages, with the south section finished first and the east portion last.

[edit] Planning

By the early 1960s detailed planning for the route had begun, and several controversies arose. The first involved the location of the northern segment, which was originally planned to pass south of Worthington, passing through the Ohio Deaf School and just north of the then ten year old Graceland Shopping Center. Through vigorous lobbying throughout 1961, and with the help of Ohio Governor Michael DiSalle, residents were able to get the outerbelt relocated to pass north of Worthington.

Another contentious issue involved the routing of the eastern portion of the outerbelt between Port Columbus International Airport and the city of Gahanna. While the airport wanted the outerbelt pushed out towards Gahanna so as to leave land for future runway expansion, the residents of Gahanna wanted it push back towards Columbus. The final compromise led to an interesting kink in I-270 as it jogs around the airport.

[edit] Construction

Construction of the outerbelt began in 1962, and work was begun on various disconnected sections. The first portion to be completed connected Ohio State Rt. 23 with I-71 south of Columbus. The portion between Rt. 23 and Interstate 71 on the north side opened in August, 1967.

The section between Interstate 70 on the West Side and Interstate 71 on the South Side opened in August, 1970. In late 1970, sections opened on the East Side between State Rt. 33 and Interstate 70, and between State Rt. 3 in Westerville and State Rt. 161 on the East Side. It was now possible to bypass Columbus using I-270 by going around the south side of the city.

In June, 1971 the section between Morse Road and State Rt. 161 on the East side opened. In October, 1971, another section on the East Side between Interstate 70 and East Main Street opened. It would take four more years to complete the northeast portion of the outerbelt.

The last section of I-270, on the East Side, between Hamilton Road and East Broad Street, was opened on August 20, 1975. The total cost of the ten year construction project was 175 million dollars, compared to the original 1961 estimate of 104 million dollars.

[edit] Accidents, Incidents and Snipers

  • In December, 1965 during the construction of the northern section of I-270 across the N&W and NYC railroad tracks between Rt. 23 and I-71, the New York Central's Ohio State Limited was wrecked after it hit a piece of earthmoving machinery, resulting in the operator's death and the injury of several passengers and crew. The train was dumped into the cornfield resulting in a major operation to clean it up.
  • On November 4, 1968, David R. Booth, age 29, became the first person to die on I-270 when he hit another car while merging onto State Rt. 23 from I-270.
  • In February, 1974, three trucks traveling on I-270 on the south side near State Rt. 33 were struck by gunfire during a violent Teamsters Strike.
  • Ohio highway sniper attacks: The highway was again the subject of national media attention in 2003 when 24 sniper shootings were reported along the southern portion of the interstate and other neighboring highways. Sixty-two-year-old Gail Knisley was shot to death on November 25, 2003, making her the only fatality associated with the string of shootings. Charles A. McCoy, Jr., who had been diagnosed with paranoid schizophrenia in 1996, was accused of the shootings and stood trial in 2005. The first trial with death penalty charges resulted in a hung jury on May 9, 2005, most likely due to McCoy's severe mental illness. Rather than face a retrial, McCoy accepted a plea arrangement where he avoided the death sentence. He was sentenced to 28 years in prison on August 9, 2005.

[edit] Expansion and Noise Barriers

Interstate 270 at Exit 33
Interstate 270 at Exit 33

In 1978 the first noise barriers were constructed on the portion of I-270 passing near Gahanna. Noise barriers have been slowly added around the length of the 55 mile long belt as development has crowded up to the noisy road.

Massive development followed the construction of I-270, especially around the north and northwest sides. The northern suburbs of Westerville, Worthington and Dublin, and Hilliard to the west benefited the most. As in other sizeable cities across America, the effect of this outerbelt driven development was to hasten the decline of the Columbus core. The south portion of the I-270 was much slower to develop due to the location of sewage treatment and landfill facilities, as well as quarries and the flood prone Scioto River. Grove City began to develop in the 1990s with the addition of office/warehouse space, and the conversion of Rickenbacker Air Force Base to a civilian air freight facility.

[edit] Major cities and suburbs

[edit] Exit List

Location Mile # Destinations Notes
Grove City 0.0/55.0 55 I-71 - Columbus - Cincinnati
Urbancrest 2.1 2 US 62 - SR 3 - Grove City
Columbus 5.0 5 Georgesville Rd WB changes to NB and SB changes to EB
7.0 7A US 40 east - Broad St NB combined as Exit 7
7B US 40 west - Broad St
8.7 8 I-70 - Columbus - Dayton some signage says Indianapolis instead of Dayton
10.5 10 Roberts Rd
Hilliard 12.6 13A Fishinger Rd - Upper Arlington SB combined as Exit 13
13B Cemetery Rd - Hilliard - Franklin County Fairgrounds
13.8 14 Davidson Rd proposed
Columbus 15.6 15 Tuttle Crossing Blvd
Dublin 17.3 17A US 33 east - SR 161 east - Dublin - Muirfield (NB) to "Olde Dublin"; NB changes to EB and WB changes to SB
17B US 33 west - SR 161 west - Marysville - Plain City to most of residential Dublin
Columbus 19.8 20 Sawmill Rd - Columbus Zoo - Muirfield (WB) first SPUI in Ohio
Worthington 22.8 22 SR 315 severe weaving issues; interchanges will be braided in project beginning 2007
23.8 23 US 23 - Worthington - Delaware - Toledo
Columbus 25.8 26 I-71 - Columbus - Cleveland EB split into 26A and 26B, probably won't be after interchange reconstruction begun in 2006
27.4 28 SR 710 - Cleveland Ave eastern terminus of SR 710
Westerville 28.7 29 SR 3 - Westerville EB changes to SB and NB changes to WB
Columbus 30.5 30 SR 161 - Worthington - New Albany formerly exits 30A-B; shares CD roads with exit 33
32.2 32 Morse Rd no connection to exits 30 or 33
32.9 33 Easton shares CD roads with exit 30
Gahanna 35.4 35A I-670 west - US 62 west - Airport NB exits combined as exit 35; Johnstown Rd exit is NB-exit-only, no entrance
35B US 62 east - Gahanna
35 Johnstown Rd
37.8 37 SR 317 - Hamilton Rd
Columbus 39.5 39A SR 16 west - Broad St - Whitehall - Taylor Station Rd Taylor Station Rd exit is NB-exit-only via Old Morrison Rd and Westbourne Ave
39B SR 16 east - Broad St - Newark
41.3 41A US 40 west - Main St - Whitehall exits 41A-43B share CD roads
41B US 40 east - Main St - Reynoldsburg
42.8 43A I-70 west - Columbus
43B I-70 east - Wheeling - Zanesville
46.1 46A US 33 west - Columbus
46B US 33 east - Lancaster
Obetz 49.0 49 Alum Creek Dr - Obetz - Rickenbacker Int'l Airport SB becomes WB and EB becomes NB
Columbus 52.7 52A US 23 north - Columbus EB combined as exit 52
52B US 23 south - Circleville
Note: all locations are within Franklin County.

[edit] References

  1. ^ All mileages from ODOT Straight Line Diagram, Franklin 270R unless otherwise noted.

[edit] See also

Auxiliary routes of Interstate 70
Current and Future (F) Former
I-170 Missouri Maryland
I-270 Colorado - Illinois-Missouri - Ohio - Maryland
I-370 Maryland
I-470 Kansas - Missouri - Ohio-West Virginia
I-670 Ohio - Kansas-Missouri