From Wikipedia, the free encyclopedia
BAE Systems' Artist Impression
|
Career |
|
Ordered: |
March 1997 |
Laid down: |
October 2003 |
Launched: |
2007-2008 (planned) |
Commissioned: |
2010 (planned) |
Status: |
Under construction |
General Characteristics |
Displacement: |
7,800 tonnes submerged |
Length: |
97 m (323 ft) |
Beam: |
11.3 m (37 ft) |
Draught: |
10 m (33 ft) |
Propulsion: |
Rolls-Royce PWR2 reactor (with full submarine life core), MAN (Paxman) 1900 kilowatt diesel generator |
Speed: |
29 knots (54 km/h) submerged |
Range: |
7,000 nautical miles / 13 000 km (at economical speed) |
Complement: |
98 officers and men normally, capacity of 109 |
Sensors and processing systems: |
Thales Underwater Systems Sonar 2076, Atlas Hydrographic DESO 25 depth-finding echosounder, Two Thales Optronics CM010 periscopes, Raytheon Systems Ltd Successor IFF system |
Armament: |
six 21 inch (533 mm) torpedo tubes, 38 Spearfish torpedoes, UGM-84 Harpoon and Tomahawk Block III cruise missiles, naval mines |
HMS Ambush (S120) (possibly S21) is a proposed Astute-class nuclear attack submarine of the Royal Navy. Ambush was ordered from GEC's Marconi Marine (now BAE Systems Submarines) on March 17, 1997. She was laid down at Barrow-in-Furness on 23 October 2003 and is expected to enter service in 2010.
See HMS Ambush for other ships of the same name.