When in 1924 a group of Austrian experts presented a plan for a road over the Hochtor, they were roundly ridiculed. In a time when in Austria, Germany, and Italy there were only 154.000 private automobiles, 92.000 motorcycles, and just on 2.000 kilometers of long-distance asphalt roads, Austria suffered from the catastrophic economic results of losing the First World War. Austria shrank to a seventh of its imperial size, lost its international markets and suffered under devastating inflation.
Even the modest design of a three-meter-wide gravel road, with visible overtaking points, appeared to be the architecture of castles in the air. The impulse for building a road, which was meant to open up the barren alpine valleys to motorized tourism, was given by the New York stock market slump in 1929. This catastrophe shook a hopelessly impoverished Austria with a terrible force.
Within three years the economic output dropped by a quarter and redundancy reached a horrendous 26 per cent. The government then pulled the plans for the Glockner Road out of a bottom drawer to at least give work to 3.200 from an average of 520.000 jobless. In the meantime, the project had been extended to a width of six meters to serve the needs of the "excessive international traffic" - which was roundly mocked - in the belief that an annual 120.000 visitors would come. The plan for financing the project was also based upon this assumption. The State advanced the building costs, the users were to pay off this sum with a fee for usage.
On August 30, 1930, at 9.30am, the first explosives roared in Ferleiten. Four years later the moving force of this road building, the Salzburg provincial head of government Franz Rehrl, and the technician Franz Wallack, delivered a sensation. With an adapted "Steyr 100" they achieved the first alpine crossing in an automobile on a graded road.
A year later, on August 3, 1935, the Grossglockner High Alpine Road was opened and put into full service a day later with an international automobile and motorcycle race.
Including the building of the access roads, the Glockner Road cost Austrian Schilling 910 million (at 1990 rates), around seven million less than estimated.
Planners had reckoned with 120.000 visitors in 1930, but the road's attraction for tourists in 1938 brought 375.000 visitors in 98.000 vehicles. After the Second World War it took until 1952 before the pre-war record was surpassed with 412.000 visitors and 91.000 vehicles. Then with astonishing rates of growth, the high point of 1962 was approached:: 360.000 vehicles and 1.3 million visitors.
The opening of the Felbertauern Road (1967) and the Tauern Motorway (1975) throttled traffic by nearly 15 per cent, but it also permanently changed the character of the Großglockner High Alpine Road: from the only transalpine road over the 158 km-long main alpine crest between Brenner and Katschberg, to an excursion road from a catchment area with a radius of around 130 kilometers.
The Glockner Road also reflects the material advance of the people: in the early years, the motorcycle - as the poor man's car - accounted for up to a quarter of the traffic; 1955 was the highpoint with 47.500 motorcycles (26% of the traffic); in the classic "year of the economic wonder" of 1968, only 2.071 motorcycles were to be counted. The motorcycle had, in the meantime, developed into an popular leisure machine, specifically for mountain excursions. The number of motorcycles on the Grossglockner High Alpine Road then rose in 2003 to over 76.000. The character of a tourist attraction of the first order is also underscored by the growing number of comfortable long-distance coaches.
Increasing numbers of visitors made the stage-by-stage modernization of the road necessary after 1953 to a width of 7.5m, to 15m in place of 10m bend radius, and 4.000 parking places instead of 800 and an annual capacity of up to 350.000 vehicles.
[edit] Snow clearing
A decisive role for traffic volumes is played by snow clearing on high alpine roads. In the years 1936 and 1937, 350 men shovelled 250.000 m³ of snow in an average of seventy days to keep at least one lane on the road free. Since 1953 the five Wallack rotary plows, and twelve GROHAG workers, have been clearing 600.000m³ to 800.000m³ of snow from the road and parking areas in around fourteen days every year in April.
The use of modern technology greatly lengthens the opening times of the Glockner Road. When for only 132 days in 1937, in 1963 one could visit the Glockner Road for 276 days. In recent years, opening times have not been oriented to the climatic conditions alone, but also to economic factors. The Grossglockner High Alpine Road is normally open from the beginning of May to the end of October..
[edit] Information
[edit] Opening Times 2007
This year probably open already end of April!
Beginning of May until 15 June: 6am - 8pm
16 June until 15 September: 5am - 9.30pm
16 September until end of October: 6am - 7.30pm
Last admission: 45 min. before night closure
[edit] References
About the Grossglockner Trophy